HomeMy WebLinkAboutCT 99-20; Carlsbad Airport Center Lot 10; Tentative Map (CT) (3)MCid.Qd l~--aq -qq City of November 23, 1999 Carl King Smith Consulting Architects, Suite 200 12220 El Camino Real San Diego CA 92 130 SUBJECT: CT 99-20/ PUD 99-09/ PIP 99-03 - CARLSBAD AIRPORT CENTRE LOT 10 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Tentative Map, Planned Unit Development, and Planned Industrial Permit, application numbers CT 99-20 / PUD 99-09 / PIP 99-03, as to its completeness for processing. ‘The items requested from you earlier to make your Tentative Map, Planned Unit Development, and Planned Industrial Permit, application no. CT 99-20 / PUD 99-09/ PIP 99-03 complete have been received and reviewed by the Planning Department. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Please see the attached list of issues of concern. These issues should be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. Please contact your staff planner, Van Lynch, at (760) 438-l 161, extension 4447, if you have any questions or wish to set up a meeting to discuss the application. Planning Director XIJH:VL:cs c: Gary Wayne Chris DeCerbo Glen Van Peski Bobbie Hoder File Copy Data Entry Planning Aide Attachment 2075 La Palmas Dr. l Carlsbad, CA 92009-1576 l (760) 438-l 161 - FAX (760) 438-0894 No. CT99-20 / PUD 99-09 / Pl’T! 99-03 November 23, 1999 Page 2 ISSUES OF CONCERN Planning: 1. Please provide quantity of plants proposed on the landscape plan. 2. Provide an approval of a license agreement from S.D.G. & E. to allow improvements and parking within the easement area. 3. Provide letter from the Carlsbad Airport Centre Owner’s association regarding the application and review of the proposal. Engineering: 1. 2. 3. 4. 5. 6. 7. Previous lot line between Lots 1 and 10 is labeled “exist. Lot line” and “old lot line”. Tentative Map would be clarified by deleting the previous lot line and labels. The retaining walls on the Tentative Map are all shown using the Keystone wall symbol, but one of the walls is labeled as a masonry wall. Symbols should be consistent with the Tentative Map. One of the proposed retaining walls is labeled as a Keystone wall on the site plan, and a Keystone or masonry wall on the Tentative Map. The Site Plan should be consistent with the Tentative Map. The legal description on the Site Plan is incorrect. The daylight line behind the proposed retaining walls should be revised to reflect the true limits of grading necessary to construct the Keystone walls. NPDES storm water pollution control plan will be required for this project. We suggest a maintenance plan and program of prevention be developed instead of just adding a series of “Fossil Filters” to catch basins. We recommend consideration of vegetation as an onsite filter and possibly a detention basin to control downstream runoff. A hydrology study will be required with the’ final engineering for this project. In addition to sizing onsite drainage facilities, hydrology study will either have to show flows leaving the site that are consistent with the previously approved hydrology reports, or check downstream facilities to prove adequacy. Attached are redlined check prints for your use. These check prints must be returned with the revised plans to assist staff in the continued review of your project.