Loading...
HomeMy WebLinkAboutCT 99-20; Carlsbad Airport Center Lot 10; Tentative Map (CT) (35)IP ENGINEERING NSON COURT, SUITE 105. SAN DIEGO, CA 92111 (858)569-7377 FAX (858) 569-0830 www.jpeng.com e-mail: )p@jpeng.com AN MBE FIRM Memorandum To: Carl King, Smith Consulting From: Jorge H. Palacios Date: March 28, 2000 Subject: Lot 10, Carlsbad Airport Center File Code: 567-99 VIA FACSIMILE: 858-793-4777 cc:Bob Irish, fax: 858-794-2401 The following has been revised to comply with the second plan check for the tentative map of the above referenced project: \, The lot line between lots 1 and 10 has been clarified by deleting the previous old lot line, 2.. The retaining walls on the tentative map are all shown as keystone walls, there are no longer any masonry walls within the project. 3, You need to make sure your site plans is consistent with our tentative map.SS/£" sfH" A 4, Revise the legal description on your site plan according to ours. ?Sgy S>fcfT £»\ g. The daylight line has been revised to reflect the true limits of grading necessary. to. The NPDES storm water pollution control plan will be a requirement of the tentative map. As it is right now. the drainage is going into an open-space area which is a natural channel, with natural vegetation. This area will provide the vegetation needed before it goes into the public system. In the previous meeting, the consultant was going to check the hydraulic analysis done to the lots, to make sure that the drainage was designed for the ultimate use of the property (commercial). This is an existing padded lot created for commercial use. 7, The hydrology study will be a condition of approval of the tentative map. If you have any questions or need further information, please give us a call. G Jsner.567.19 MEMBER BIA, CELSOC, ASCE