Loading...
HomeMy WebLinkAboutCT 99-20; Carlsbad Airport Center Lot 10; Tentative Map (CT) (54)CMWD 99-218 ""N Page 1 From: Mikhail Ogawa To: Van Lynch Date: 4/6/00 3: 10PM Subject: Carlsbad Airport Center Lot 1 0 - CT 99-20, CMWD 99-21 8 Here are CMWD conditions: 1) The developer shall be responsible for all fees, deposits and charges which will be collected before and/or at the time of issuance of the building permit. The San Diego County Water Authority capacity charge will be collected at issuance of application for any meter installation. 2) The developer shall provide potable, recycled and fire flow water demands in gallons per minute and estimated sewer flow in million gallons per day to the Deputy City Engineer - Utilities. 3) All public potable and recycled water pipelines, fire hydrants and sewer pipelines shall be within public right-of-way or within easements granted to the Carlsbad Municipal Water District or the City of Carlsbad. No private water and sewer systems will be allowed for the subject project. 4) The developer shall design all landscaping to be irrigated with recycled water per CMWD standards and City ordinances. 5) The developer shall prepare a colored recycled water use map and submit this map to the Planning Department for processing and approval by the Deputy City Engineer - Utilities. 6) The following note shall be placed on the final map: "This project is approved upon the expressed condition that building permits will not be issued for development of the subject property unless CMWD has adequate water and sewer capacity available at the time development is to occur, and that such water and sewer capacity will continue to be available until time of occupancy." 7) All potable and recycled water meters shall be placed within public right-of-way. 8) A fire flow system shall be required for this industrial development and it shall be constructed as a looped system. The developer shall complete the looped water system by tying into the existing water line on Edison Place, north of the subject project. 9) The developer shall coordinate with the Deputy City Engineer - Utilities regarding the looped system and easements. If you have any questions, please call me at ext. 2762.