Loading...
HomeMy WebLinkAboutCUP 00-46B; Pacific Bell Harding Street Building Addition; Conditional Use Permit (CUP) (2)1 City of Carlsbad October 30,2000 Mr. Robert Royce Allied Design Group 2359 Fourth Avenue, Suite #300 San Diego, CA 92 101 SUBJECT: CUP46(A) - PACIFIC BELL HARDING STREET BUILDING ADDITION Dear Robert: The Planning and Engineering Departments have completed their review of the latest plan submittal for the subject project which includes additional items not included as part of the initial project submittal. Following is a list of issues of concern that are remaining for the project. Please be advised that all issues must be resolved prior to scheduling the project for public hearing. Planning: 1. The Planning Department is in receipt of your request to extend the project application for 90 days. It is imperative that the following issues be resolved in order to schedule this project for a public hearing. We therefore have approximately 6 weeks remaining until the project must be scheduled (6 week lead time between scheduling and hearing date). 2. The proposed chiller area which will be surrounded by an enclosure to attenuate noise is considered to be an accessory structure. The applicable R-3 zoning ordinance limits accessory structures to a maximum of 440 square feet. 3. Noise Report: Please note that the noise levels at all property lines should not exceed 60 &A unless existing noise levels exceed 60 dBA. In that case, noise levels with the project should not exceed existing noise levels. The report analyzes noise levels at the northern property line only. With and without mitigation, what is the noise level at the eastedsouthem property line? Additionally, the report indicates that a 16’ high noise wall would need to be constructed around the chillers while the site plan indicates a 14’ high noise wall. The R-3 Zoning Ordinance permits accessory structures, however, accessory structures are limited to a height of lo’ unless a 3:12 roof pitch is proposed. With a 3:12 roof pitch, accessory structures are permitted up to 14’ in height. The proposed structure is therefore limited to a height of 10’. a3 1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us CUP46(A) - PACIFIC LULL HARDING STREET BUILDING P~DITION October 30,2000 Air handlers are discussed in the noise report. handlers should be identified on the floor plans (mechanical rooms?). The location of these noise 4. Please refer to the enclosed landscape plan check print and make the recommended changes prior to the next plan submittal. - 5. Please identify the area of light spillage from the proposed 24’ high parking lot light standards. The Planning Department strongly recommends that parking lot lighting be provided by low bollards that avoid light spillage onto adjacent residential properties. I Engineering: 1. Please provide a copy of the contract between Pacific Bell and the sanitation company as soon as it is made available. 2. On the site plan: 0 Indicate that a “No Parking” sign will be placed at the end of the vehicle back-up space. 0 Correct the No. 4 note for the retaining wall at the end of this back-up area. Place a 5-fOOt wide landscape strip between the proposed back-up space and the building. Based on the turning radius for a P-vehicle, locating a landscape strip here will not interfere with vehicle back up and turn around area. Note 18 is incorrectly identifjmg the driveway entrance. Add a leader from Note 18 to the actual vehicle back up and turn around area and remove or modify the Note 14 directed at the back up and turn around area. Note 14 incorrectly refers to “parking area” in this particular case. 3. Revise the grading and draInage plan as follows: 0 0 Locate the trash receptable to be consistent with the site plan. Remove the retaining walls on the north and west side of the back-up space. 4. Why is there now a sump pump and a 3” force main proposed for the on-site storm drain rather than the originally proposed 8” drain at 1% flow? It appears that an adequate gravity flow of .08% can be achieved from the invert elevation of the inlet to the curb outlet on Harding St. In addition, provide hydrology calculations to support piping size using the rational formula Q=CIA. To use the smallest pipe possible, roof drainage could be directed to a downspout that carries drainage to the street via surface flow rather than the current flow to the inlet. It appears that a high point will be established where the new addition meets the existing building. CUP46(A) - PACIFIC LULL HARDING STREET BUILDING dDITION October 30,2000 Pane 3 5. Because you are required to install a fire sprinkler system within the building, you will need to install a new water service line and double check valve. Show the location of these facilities and show the existing sewer lateral. A horizontal separation of 10 feet between the water service and the sewer lateral is required. 6. Fire Department comments will be forwarded under separate cover. If you have any questions regarding the above comments, please contact me at (760) 602-4622. J Sincerely, ANNEHYSONG u Associate Planner AH:cs Attachment C: Chris DeCerbo File