HomeMy WebLinkAboutCUP 154D; Pacific Bell; Conditional Use Permit (CUP) (33)MCUP ANNUAL REVIEW SHEET
INSTRUCTIONS
1. COMPLETE PROJECT INFORMATION BELOW AND PRINT COPY.
2. DOWNLOAD (DMS) RESOLUTIONS AND REVIEW ALL CONDITIONS AND
APPROVED PLANS (COORDINATE WITH OTHER DEPARTMENTS).
3. REVIEW CODE COMPLAINT HISTORY (CODE ENFORCEMENT, POLICE,
FIRE, ETC.).
4. CONTACT APPLICANT (OR OWNER) AND SCHEDULE AN APPOINTMENT
FOR THE REVIEW.
5. COMPLETE REVIEW INFORMATION SECTION DURING REVIEW.
6. HAVE PRINCIPAL PLANNER REVIEW AND SIGN.
7. PLACE COMPLETED REVIEW SHEET IN ADMIN IN-BOX FOR PROJECT FILE
(ADMIN WILL FILE).
PROJECT INFORMATION
CASE NAME: PACIFIC BELL
CASE NUMBER(S): CUP
APPROVING RESO NO(S). 4922 and 4923
PLANNER COMPLETING REVIEW: Van Lynch
PROJECT HISTORY
Does project have a code complaint history? | | Yes
If yes, check those that apply and explain below.
| | Code Enforcement | | Police
Comments (include corrective actions taken and date compliance obtained):
No
| | Fire Prevention
REVIEW INFORMATION
Has the permit expired?
Date of review: 4/14/09
Name:
Yes No Permit expires: 02-21-2011
If other, state title: Employee onsite for ATT
Applicant Q Owner ^ Other
"CURRENT APPLICANT INFORMATION:
Name: ATT Phone: 760 722-0009
Contact name (if different): Mara Stevens
Address: 2255 Mission Ave, Oceanside CA 92054
Mailing (if different):
E-mail:
"CURRENT OWNER INFORMATION:
H/ADMIN/TEMPLATE/MCUPANNUALREVIEWSHEET
(optional)
O3/O9
Does project comply with conditions of resolution(s) and approved plans?
IXI Yes | | No If no, list below the condition(s) and/or plan aspects the project is
not in compliance with per resolution number or exhibit.
Corrective action(s) to be taken:
None - site has not changed since last review. New ground AC Unit being installed
replacing existing.
Date planner completed follow-up review and confirmed project compliance:
Planner Signature Principal Planner Signature
* Applicant and owner information must be updated for annual review to be complete.
H/ADMIN/TEMPLATE O3/O9