Loading...
HomeMy WebLinkAboutCUP 172; Palomar Airport; Conditional Use Permit (CUP) (25)* c County of San Diego OEPARTMENT OF PUBLIC WORKS (am) 9~-22~1 FAX: (am) 201144(11 5655 OVERLAND AVE. SAN DIEGO. CALIFORNIA 921254296 JOHN L. SNYDER DIRECTOR Wob Sit.: sdcdpw.org February 25,2004 Mr. Jeremy Riddle City of Carlsbad Public Works - Engineering 1635 Faraday Avenue Carlsbad, California 92008-7314 Dear Mr. Riddle: This letter is in response to your letter dated January 23,2004, addressed to Mr. Robert Hobbs of our office, regarding import of soil into Palomar Airport. You requested several items prior to any soil being brought into the Palomar Airport. These included: An exhibit depicting approximate location of the stoGkpileMll area, Maximum depth of fill (feet) on the exhibit, and A letter from the County Airport Authority stating a. The purpose of the stockpildgrading; b. What environmental impact studies andlor clearances have been completed or granted, and an acknowledgement that all mitigation measures, if applicable, are or will be in place; and c. That the County Airport Authority is responsible to install all necessary BMP (Best Management Practices) measures to ensure no off-site erosion takes place during rainfall events. Per your request, please find Attachment A showing the approximate location of the 4 stockpile area. These stockpile operations are being carried out by the County of San Diego, Landfill Management group for future maintenance activities at the site, which will indude Units 1, 2 or 3 (see Attachment). .The area set aside for stockpiling is approximately 2 acres (1 50 by 600 feet). The proposed quantity of soil import (for this pmject) is 10,000 cubic yards (which is equal to approximately 2 acres). So, with compaction, it is easy to estimate that the stockpile will be approximately 3 feet in depth. These activities, for the purpose of maintenance of existing facilities and to provide regulatory compliance with the Regional Water Quality Control Board (RWQCB) mandates, is an exempt actin under CEQA. KIds The Environment Sufe and Livable Communities ~ ~~ ". , I .". - " I k . I, ys Management of the airport is provided by the County of San Diego, Department of Public Works, Airport Administration, rather than a County "Airport Authority" as referenced in your letter. However, management of the landfill units at the airport falls under the County of San Diego, Department of Pubic Works, Landfill Management group. Landfill Managem'ent is responsible for, and will provide,. installation of BMPs on the stockpile and unpaved landfill units to ensure no off-site erosion takes place during rainfall events. The reason for stockpiling soil 'on site is to take advantage of soil sources as they become available; and to have maintenance soil available to promptly respond to regulatory agencies' directives. County DPW will from time to time import similar or smaller quantities to maintain available soil as circumstances and availability dictate. Please provide confirmation as soon as possible that this addresses your inquiry and that we may proceed as planned. If you have any questions or comments, please dl me at (858)495-5475. DPW, Civil Engineer Landfill Management 0 . (7 r! County of San Diego DEPARTMENT OF PUBLIC WORKS 6555 OVERLAND AVE, SAN OIEGO, CALIFORNIA 821234291 (818) 684-2233 FAX: (868) 2669461 a JOHN L. SNYDER DIRECTOR Wob Slto: 8dcdpw.org March 17,2004 Mr. Jeremy Riddle City of Carfsbad Public Works - Engineering 1635 Faraday Avenue Carlsbad, California 92008-7314 Dear Mr. Riddle: Per your request I am sending you several copies of a plan inadvertently left unattached to the County letter dated February 25, 2004 regarding stockpiling activities at the airport. The plan shows the location of the stockpile area currently used at the Palomar Airport Landfill by the County of San Diego, Landfill Management group for future maintenance activities at the site. The landfill units are also delineated on the plan, and are shown as Units 1, 2 and 3. The area set aside for stockpiling is approximately 2 acres (1 50 by 600 feet). If you have any questions or comments, please call me at (858)495-5475. DW, Civil Engineer Landfill Management 1 - h Gt&I \I LC COI’X I T \\TS SOIL STOCKPILE LOCATION PALOMAR AIRPORT LANDFILL FIGURE NO PROJFCT NO DATE 400 200 0 400 Feet -