Loading...
HomeMy WebLinkAboutCUP 85B; Pilgrim Congregational Church; Conditional Use Permit (CUP) (13)December 12, 1991 TO: Anne Hysong, Planning FROM: Pat Kelley, Building SUBJECT: CUP NO. 85B I have reviewed the site plan proposal of the above mentioned project. I can foresee, based upon the drawing you provided, a number of building department concerns. Primarily the plan shows a conversion of an existing single family residence to church school classrooms without proposing any modifications to the building. The change in use is an alteration which requires the facility to be accessible to people with physical disabilities. This in itself implies that a number of alterations to the site and to the interior of the building will be required. Secondly, the new use of the building will result in a new building code classification of either A-3, B-2, E-1, E-2, or E-3. These classifications present side yard and possibly rear yard setback problems related to the fire resistivity of those walls and the deck. I won’t go into the variables associated with this problem. There are too many to list depending upon how the building is eventually classified. The occupant load of the proposed use presents an exiting problem in that at least two It is unclear on the plan how this will be exists will be required to the public way. accomplished. It should not be construed that this is a complete list of the building department’s issues which will eventually be raised during the plan check process. It is my recommendation that the owner have a licensed architect review the floor plan and determine for the owners how to bring the building into compliance with the applicable code requirements and the fire department concerns. Any questions you or the proponent may have regarding this, I will be happy to discuss. Thank you for including us early in this process. Sincerely, Pat Kelley Acting Principal Building Inspector