Loading...
HomeMy WebLinkAboutCUP 85B; Pilgrim Congregational Church; Conditional Use Permit (CUP) (4)-4 -- January 8, 1991 Mr. Richard Allen 3609 Leredo Street Carlsbad, CA 92008 SUBJECT: PILQRM CONGREGATIONAL CHURCH - CUP 85(8) Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Land Use Permit, application no. CUP 85(5), as to its completeness for processing. The application is incomplete. Attached are two lists. The first list is information which must be submitted to complete your application. All list items must be submitted simultaneouslv at the Communitv Development Buildinu counter, and to the attention of Erin Letsch. A COPY of this list must be included with vour submittal. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials have been submitted as outlined above, the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initiallv filed, December 12, 1990, to either re- submit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Anne Hysong, at (619) 438-1 161, extension 445714329, if you hav-y questions or wish to set up a meeting to discuss the application. Planning Director c: Gary Wayne Robert Green Erin Letsch Bob Wojcik File Copy Data Entry 2075 Las Palmas Drive - Carlsbad. California 92009-4859 - (619) 438-1 161 -- -- UST OF ITEMS NEEDED TO COMPLETE APPLICATION: No. CUP 85tB) PUNNING: 7. 2. 3. Speciw the following on the site plan: a) b) c) the square footage of actual assembly area within the sanctuary; the number of seats available in the sanctuary; The number of classrooms along with the maximum number of students and teachers occupying each classroom or meeting room on Sunday. Specify on the site plan the number of parking spaces required versus the number provided using a table to break down the required parking by use (see attached example). Parking required for the sanctuary is 1 space15 seats or 1 space/700 square feet of assembly area, whichever is greater. Parking required for classrooms and meeting rooms is 7 space110 students plus 1 space for each teacher. Submit a letter requesting the extension of CUP 85(A) which expired on May 28, 7990. The CUP extension will include the preschool (approved by CUP 85 in 1973). The cost of the CUP extension is $50. ISSUES OF CONCERN PU NNING: 1. We will have to extend CUP 85(A) so that it is a valid CUP in order to amend it. 2. The provision of adequate parking to accommodate the existing uses as well as the proposed expansion. ENGINEERING: 7. Supply a current title report for the entire project. 2. Replace asphaltic concrete sidewalk with portland cement concrete sidewalk. 3. Prior to approval of this CUP amendment, the applicant shall enter into an agreement to pay proportional fee for the future undergrounding of all existing overhead utility lines along the boundary of the project. Also attached is a redlined check print of the site plan for corrections and changes as noted. Please return the redlined print with the corrected site plan to assist us in our continued review.