September 1, 1978
Stephen M. L'lteureux
Attorney at Law
322 North ldevaila
Oceanside, Cal ifornia 32054
SUBJECT: SOUTH COAST ASPHALT -- - CUpm-9
_c_-
Dear Mr. L'Heureux:
In your letter of August 1, 1978, you explained that your client -
South Cozst Asphalt Products was purchasing pn asphalt surge bin.
have reviewed this proposal and ham made the following findings:
I
CUP Rcquirment .--
TELEPHONE:
(714) 729-1 181
The CUP ciot?:s not need to be reopened because the last adopted CUP
(Resolution t<o. 204) does not reference a plot plan. It appears that
the Planniiig Commir3s.ion at that time approved only a use with certain
operating condi.tions.
itself.
requiring an arnendinent to the CUP.
temporary trailer on the site.
of the code requiring such process for a temporary trailer.
They were not concerned with the actual development
This approval ws in April 1961, since that time mzny structurcs
* and buildings have been built, reinGVed or relocated on this site without
The only subsequent CUP was for a
This, however, came under the requirement
Structure Height -
-_I
The height 1 imitations of the M Zone is 35' for "buildingr;", (Section
21.32.050). The definition of a building means !'any structure with a
roof", (21.04.060).
and comes under the regulations of structure.
of structure (Section 21 A6.020) the proposed surge bin may be constructed
above the zont: height 1 imits.
Flood Plain
The site for this surgc bin is within the Floodplain Overlay Zone. This
means that special engineering approval is required to construct in this
By this the proposed surge bin is not a building,
Therefore, as per height
. .*_.-
.. .
-
L. ..
Stephen M. L'tleureux
August 30, 1978
Page Two (2)
..
1
i
.-
zone, except for certain exceptions.
reviewed by Tim Flanagan, City Engineer, who found that the surge bin is
an exception since it is an accessory structure appurtknant to a conforming
u5e (section 21.31.060(2) (A)).
I hope these explanations are satisfactory to you so that you may go
forward with the project.