Loading...
HomeMy WebLinkAboutCUP 90-03E; Costco Gas Station Canopy; Conditional Use Permit (CUP)The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. P.C. AGENDA OF: May 7, 2014 Application complete date: February 24, 2014 Project Planner: Christer Westman Project Engineer: Steve Bobbett SUBJECT: CUP 90-03(E)/SDP 90-05(l)/CDP 97-05(B) - COSTCO GAS STATION CANOPY - Request for a recommendation of approval of a Conditional Use Permit Amendment CUP 90- 03(E), a Site Development Plan Amendment SDP 90-05(1), and a Coastal Development Permit Amendment CDP 97-05(B) to add three (3) new fuel pumps and a 2,080 square foot gas station canopy addition to the existing COSTCO Wholesale fueling station on property located at 951 Palomar Airport Road within the Mello II segment of the Local Coastal Program and in Local Facilities Management Zone 5. The City Planner has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to Section 15301 "Existing Facilities" of the State CEQA Guidelines and will not have any adverse significant impact on the environment. This project is not located within the appealable area of the California Coastal Commission. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7049 RECOMMENDING APPROVAL of Conditional Use Permit Amendment CUP 90-03(E), Site Development Plan Amendment SDP 90-05(1), and Coastal Development Permit Amendment CDP 97-05(B), based on the findings and subject to the conditions contained therein. II. PROJEa DESCRIPTION AND BACKGROUND The 14.8 acre project site is located at 951 Palomar Airport Road. Table 1 below includes the General Plan designations, zoning, and current land uses ofthe project site and surrounding properties. TABLE 1 Location General Plan Designation Zoning Current Land Use Site Regional Commercial (R) General Commercial - Qualified Overlay (C-2-Q) COSTCO Wholesale building and gas station North Open Space (OS) Open Space (OS) Flower Fields South Open Space (OS) Open Space (OS) Preserved Open Space East Open Space (OS) Open Space (OS) Preserved Open Space West Travel Recreation (TR) Office (0) Tourist Commercial (C-T) Residential Professional (RP) Residential Agricultural (R-A) Commercial Office CalTrans Yard CUP 90-03(E)/SDP 90-05(l)/CDP 97-05(B) - COSTCO GAS STATION CANOPY May 7, 2014 Page 2 The Costco Wholesale project was approved in 1991 and completed in October 1992. The existing fueling facility includes eight (8) pumps and a 3,136 sq.ft. canopy. The existing facility is located near the main entrance to the COSTCO warehouse off of Palomar Airport Road. The three (3) new fuel pumps will be located east ofthe existing pumps and the 2,080 square foot, 17.5 foot tall canopy addition will be attached to the east side of the existing canopy. The canopy addition is proposed with materials and colors which match the existing canopy. A portion of a landscape island will be removed to provide better vehicular access and queuing to the fueling station In addition to the fuel station expansion, an improvement to the Palomar Airport Road exit lanes will be made. Each of the four exit lanes will be widened to provide better space for through circulation. In order to gain the additional lane widths, the entry landscape island will have a portion reduced to a width of three feet and will be replanted with low shrubs and drip irrigation. Table 2 below includes the project site's gross and net acreage. TABLE 2 Gross Acres Net Acres 14.8 acres 14.8 acres III. ANALYSIS The proposed project is subject to the following plans, ordinances, and standards: A. Regional Commercial (R), General Plan Land Use Designation; B. Carlsbad Municipal Code, Title 21, Chapter 21.06 - Qualified Development Overlay Zone; C. Carlsbad Municipal Code, Title 21, Chapter 21.28 - General Commercial Zone; D. Carlsbad Municipal Code, Title 21, Chapter 21.208 - Commercial/Visitor-Serving Overlay Zone; E. Coastal Development Regulations for the Mello II Segment of the Local Coastal Program; and Carlsbad Municipal Code, Title 21, Chapter 21.201 - Coastal Development Permit Procedures; and Carlsbad Municipal Code, Title 21, Chapter 21.203 - Coastal Resource Protection Overlay Zone; F. Carlsbad Municipal Code, Title 21, Chapter 21.90 Growth Management Ordinance; and Zone 5 Local Facilities Management Plan. The recommendation of approval for this project was developed by analyzing the project's consistency with the applicable policies and regulations listed above. Therefore, this section will cover the project's compliance with each ofthe regulations listed above in the order in which they are presented. A. Regional Commercial (R), General Plan Land Use Designation The site has a Regional Commercial (R) General Plan Land Use designation. The R designation identifies areas that are intended for commercial centers that draw customers from outside of the City. For this reason, R designated properties are customarily located on sites that are visible as well as accessible from interchange points between highways and freeways. The following Table 3 identifies General Plan goals and objectives relevant to the proposed project and describes the compliance ofthe proposal. CUP 90-03(E)/SDP 90-05(l)/CDP 97-05(B) - COSTCO GAS STATION CANOPY May 7, 2014 Page 3 TABLE 3 - GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJEaiVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Land Use Commercial Goal A.1: Provide a healthy and diverse economic base and quality commercial development to serve the employment, shopping, and service needs. Commercial Goal A.2: Provide for the development of compatible regional commercial uses. The Costco facility, including the fueling station addition improvements, is a regional commercial use which draws customers from outside the city, generates tax revenue and jobs, and provide goods and services to residents in the city. Yes Circulation Circulation Objective B.l: Provide adequate circulation infrastructure concurrent with or prior to the actual demand for such facilities. All required roadway and onsite improvements were constructed in conjunction with the development ofthe existing retail building and fueling station. The project does include improving the existing four lanes exiting onto Palomar Airport Road by expanding their widths. Yes Open Space & Conservation Water Quality Protection Policy and Action Program C.4: Utilize Best Management Practices for control of storm water and to protect water quality. A storm water management plan has been prepared forthe proposed project. In addition, the project has been conditioned to conform to all NPDES requirements and Best Management Practices. Yes Public Safety Geology and Seismic Safety Policy and Action Program C.17: Design all structures in accordance with the seismic design standards of the California Building Code (CBC) and State building requirements. The proposed structural improvements have been designed in conformance with all seismic design standards. Yes Noise Land Use Objective B.l: Achieve noise compatibility between commercial and surrounding land uses The COSTCO project and fueling station additions is adjacent to other commercial uses and open space neither of which would be adversely affected by noise generated at the site. Yes Carlsbad Municipal Code, Title 21, Chapter 21.06 - Qualified Development Overlay (Q) Zone The project site is located within a Qualified Development Overlay (Q) Zone and no building permit or other entitlement shall be issued for any use in the Q zone unless there is a valid site development plan approved for the property. The existing COSTCO Wholesale fueling station was approved by SDP 90- 05(C). There have been several subsequent amendments to the SDP and this amendment SDP 90-05(1) CUP 90-03(E)/SDP 90-05(l)/CDP 97-05(B) - COSTCO GAS STATION CANOPY May 7, 2014 Page 4 is the ninth. The required findings for approval of the SDP can be made. The project is the addition of three (3) new fuel pumps and a 2,080 square foot gas station canopy addition. The additions fit within the boundaries ofthe property, they do not encroach into any required parking area, landscape area, or setback area, and the COSTCO property is separated by 650 feet from the nearest residential use. The additions will add 480 average daily trips but not significantly increase traffic on the existing roadways or increase the need for other public services but will provide for more efficient vehicle fueling for existing and future customers. C. Carlsbad Municipal Code, Title 21, Chapter 21.28 - General Commercial (C-2) Zone The project complies with the General Commercial Zone development standards as shown in Table 4. TABLE 4 - GENERAL COMMERCIAL COMPLIANCE Standard Maximum Provided Complies Building Height 35 feet Canopy: 17 feet 6 inches Yes Setbacks None Required N/A N/A D. Carlsbad Municipal Code, Title 21, Chapter 21.208 - Commercial/Visitor-Serving Overlay Zone The existing COSTCO Building project was approved as Price Club in 1991 prior to the adoption of the Commercial/Visitor Serving Overlay Zone in 1999. However, for existing buildings within the overlay zone, additions that invoke the requirement for additional parking or additions that are more than two hundred square feet of increased building area, require that the new or intensified portion of the existing use shall be subject to all ofthe procedures, standards and conditional use permit requirements of the overlay zone. Since the canopy addition is 2,080 square feet, it is subject to the overlay zone and requires the approval of a Conditional Use Permit by the City Council. The project complies with all applicable Commercial/Visitor-Serving Overlay development and design standards as shown on Table 5 below: TABLE 5 - COMMERCIAL/VISITOR-SERVING OVERLAY ZONE COMPLIANCE Standard Maximum/Minimum Provided Complies Parking: General Sales: warehouse building One space per 300 151,128 square feet. square feet plus two No parking required for employees. forthe fueling station 504 + 3 spaces required 751 spaces Yes canopy or pumps. (507) Building Height 35 feet maximum 17.5 feet Yes Palomar Airport Road 50 feet minimum 330 feet Yes Setback Setbacks Side 10 feet minimum 130 feet Yes Rear 10 feet minimum 195 feet Yes Building Materials per TBD The canopy addition uses the same Yes discretionary approval materials and white color as the existing canopy. Alternative TBD Color, texture, and trim used are the Yes Architectural Style same as on the existing canopy. CUP 90-03(E)/SDP 90-05(l)/CDP 97-05(B) - COSTCO GAS STATION CANOPY May 7, 2014 Page 5 The addition is desirable for the community since the additional fuel pumps will provide better access to fuel. In addition, the 2,080 square foot canopy addition is located entirely within or adjacent to a disturbed and constructed footprint established by the existing fueling station and will not create significant impacts that would be detrimental to existing or other uses permitted in the vicinity. The COSTCO facility was designed to accommodate a large volume of customers including surplus parking. The street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use, in that the anticipated ADT generated by the three new fuel pumps is 480 which is 1.2 % of the design capacity of Palomar Airport Road which is a prime arterial. E. Coastal Development Regulations for the Mello II Segment of the Local Coastal Program; and Carlsbad Municipal Code, Title 21, Chapter 21.201 - Coastal Development Permit Procedures; and Carlsbad Municipal Code, Title 21, Chapter 21.203 - Coastal Resource Protection Overlay Zone Mello II Segment ofthe Local Coastal Program The subject site is located in the Mello II Segment of the Carlsbad Local Coastal Program and is subject to the approval of a Coastal Development Permit, however, it is not located within the Coastal Commission's appeal area. The project site has an LCP Land Use designation of Regional Commercial (R) and Zoning of C-2-Q which are consistent with the City's General Plan and Zoning. The project's consistency with the (R) General Plan Land Use designation is analyzed in Section "A" above. The proposed project, which includes an addition to the fueling station, is consistent with the relevant policies of the Mello II Segment of the Local Coastal Program, the Coastal Program implementing ordinance (Zoning Ordinance), and the Coastal Resource Protection Overlay Zone. The project site is currently developed with an eight (8) pump fueling station. The project is consistent with the surrounding development, which includes commercial uses and open space uses. The proposed addition will not obstruct views of the coastline as seen from public lands or the public right-of-way nor otherwise damage the visual beauty ofthe coastal zone. No agricultural uses currently exist on the developed site, nor are there any sensitive resources located in the area of the proposed addition. In addition, the proposed addition is not located in an area of known geologic instability or flood hazards. Since the site does not have frontage along the coastline, no public opportunities for coastal shoreline access are available from the subject site. Furthermore, the commercially-designated site is not suited for water-oriented recreation activities. Coastal Resource Protection Overlay Zone The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (CMC Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the City's Master Drainage Plan, Grading Ordinance, Storm Water Ordinance, Standard Urban Storm Water Mitigation Plan (SUSMP) and Jurisdictional Urban Runoff Management Program (JURMP) to avoid increased urban run- off, pollutants and soil erosion. No development is proposed in areas of natural steep slopes > 25% gradient, and no native vegetation will be removed. In addition, the site is not located in an area prone to landslides, or susceptible to accelerated erosion, floods or liquefaction. CUP 90-03(E)/SDP 90-05(l)/CDP 97-05(B) - COSTCO GAS STATION CANOPY May 7, 2014 Page 6 F. Carlsbad Municipal Code, Title 21, Chapter 21.90 Growth Management Ordinance, and Zone 5 Local Facilities Management Plan The proposed project is located within Local Facilities Management Zone 5 in the southwest quadrant of the City. The impacts on public facilities created by the project (three fuel pumps and 2,080 sq.ft. canopy), and its compliance with the adopted performance standards, are summarized in Table 6 below: TABLE 6 - GROWTH MANAGEMENT STANDARD IMPACTS COMPLIANCE? City Administration Not Applicable N/A Library Not Applicable N/A Waste Water Treatment Not Applicable Yes Parks Not Applicable N/A Drainage 13.78 CFS Yes Circulation 480 ADT Yes Fire Station No. 4 Yes Open Space Not Applicable N/A Schools Not Applicable N/A Sewer Collection System Not Applicable Yes Water Not Applicable Yes IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment; therefore, the project is categorically exempt from the requirement for the preparation of an environmental document pursuant to Section 15301, Existing Facilities, of the California Environmental Quality Act (CEQA) Guidelines. In light ofthe above, a Notice of Exemption will be filed by the City Planner upon project approval. ATTACHMENTS: 1. Planning Commission Resolution No. 7049 2. Location Map 3. Disclosure Statement 4. Reduced Exhibits "A-H" 5. Full Size Exhibit "A - H" dated May 7, 2014 N NOT TO SCALE SITE IVIAP Costco Gas Station Canopy CUP 90-03(E) / SDP 90-05(1) / CDP 97-05(B) ^ DISCLOSURE Develaoment Services STATEMENT planning Division '•^ CITY OF P '[(A\ 163S Faraday Avenue PARI <vRAn (760)502-4610 v_ rAtiN L—JlJ/'\ L/ www.carlsbadc3.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of Uie City Coundl or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information Is completed. Ptease print. Note: Person is ijeflned as 'Any Individual, firm, copartnership, foint venture, assadation, social club, ftatemal organization, corporation, estate, trust, receiver, syndicate. In this and any other county, dty and county, city municipality, district or other political subdivision or any other group or combination acting as a unit' Agent* may sign this document; however, tha legal name and entity ofthe appficant and property owner must be provided bataw. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE^, LEGAL names and addresses of AtJ- persons having a financial interest in the apfrficatfon. If the appficant includes a corporation or partnership. include the names, titles, addresses of ali individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES. PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publiclv-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Corp/Part Co-^vco tiaUkMAS<v« Title ^ Title, Address Address «i<\-=\ LAVJB ftvtiM^ ^ t^^^-^..^^ usa ^ibo-L"^ 2. OWNER (Not the owner's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.a, partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corooration or partnership, include the names, titles, addresses of all individuals owning more than 10% ofthe shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES. PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publiclv-owned corporation, include the names, titles, and addresses ofthe corporate officers. (A separate page may be attached if necessary.) Psfsori Corp/Part C »3«kT< o v CIKS^X t ^ •• ..^ Title. Title Address Address ucrt^p , \ttft<Kniru> ww H^^>^•^. P-1(A) PagatofZ Revised 07/10 NON-PROFIT ORGANIZATION OR TRUST If any person identified purauant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY peraon senring as an officer or director of the non- proflt organization or as trustee or beneficiary of the. Non Profit/Trust Title Non Proflt/Trust_ Title Address Address Have you had more than $500 worth of business transacted with any member of City staff. Boards, Commissions, Committees and/or Council within the past twelve (12) months? • Yes No tf yes, please indicate person(s)v NOTE: Attach additional sheets if necessary. certify that ait the eliove infonfft^tion is true and correct to the best otrmy knowledge. Pririt or type name of owner CjovUHsyua^orJ of anpti^anl/date Print or type name of applicant <b»«j(ion/<»nt>isj Signature of owner/applicant*s agent if applicable/date Print or type name of owner/applicant's agent P-i{A) Page 2 of 2 Revlswl 07/10 AHEAOFNBft UNOBtSEPARAlE PBWT PROJECT DATA CLIEMT: COSTCO WHOLESALE 999 LAKE DRIVE ISSAQUAH, WA 96027 14.80 ACRES (644,686 S.F.) EXIST, BUIiDING DATA: EXIST. BUILDING AREA EXIST. TIRE CENTIR EXIST. FOOD SERVICE 143.096 S.F. 4.040 S.F. 1.096 S.F. TOTAL EXIST. BUILDING 148.231 S.F. PHA3EI NEW DAIRY COOLER ADOmON NEW OVERSTOCK COCXER 1.383 S.F. 941 S.F. PHASE II RECEIVING AOOmON 1,878 S.F. TOr/y. BUILDING 152,433 S.F. EXISTING GAS CANOPY NEW GAS CANOPY 3,136 S.F. 2,040 S.F. 5,176 S.F. PARKING DATA: PARKING PROVIDED: ® WIDE STALLS ^ hIANOICAP STALLS 718 STALLS IB STALLS TOTAL PARKING 736 STALLS NUMBER OF STALLS PER 1.000 S.F, OF EXISTING BUILDING AREA: (148.231 S.F.) 4 97 STALLS NUMBER OF STALLS PER 1,000 S.F. OF PROPOSED BUILOING AREA: (152.433 S.F.) 4.84 STALLS VICINITY MAP COSTCO WHOLESALE PROPOSED SITE PLAN M-l- CARLSBAD, CA #462 1110 112THAVE.NE I SUnEM 94-0160-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN DD11-02 CARLSBAD, CALIFORNIA OCTOBER 09, 201 3 DEMOLITION PLAN PROPOSED PLAN COSTCO WHOLESALE DEMO & ENLARGED SITE PLAN 0 Iff 1 M 1- CARLSBAD, CA #462 ; L\ A -N t-J f . G 2 94-0150-22 OCTOBER 09, 2013 DEUO & ENLARGED SITE PLAN DD11-02A CARLSBAD, CALIFORNIA OCTOBER 09, 201 3 <C=J o o .a!^ o o <:=• COSTCO WHOLESALE ENLARGED DEMO PLAN / m- CARLSBAD. CA #462 94-0160-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN DD10-02 CARLSBAD, CALIFORNIA OCTOBER 09, 201 3 COSTCO WHOLESALE ENLARGED SITE PLAN hi-l- CARLSBAD, CA #462 a.tajOK I 1425 4(3.2002 j 94-0150-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN DD12-02 CARLSBAD, CALIFORNIA OCTOBER 09,201 3 COSTCO WHOLESALE ENLARGED SITE PLAN i-w- CARLSBAD, CA #462 1110 IIZIHAVE-NE r SUnESOO I*29.4«3.20a0 I T42SW32)ai 94-0150-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN DD12-02S CARLSBAD, CALIFORNIA OCTOBER 09,2013 ii •UK ' a—Wei—1»» hJM IB¥IIMWHOWOW-/ ^ EAST ELEVATION (ENTRANCE) VJ^SCALETTIF^T?"""""""^^^^"^^^^"^ /jTN WEST ELEVATION (EXIT) SCALE: 3/16- - IMT /TX SOUTH ELEVATION (ENTRANCE) V V SCALE: 3/16- - r-C -/inue«M«r (16> CANOPY SIGN SCALE: 1/2-• V^T SCALE: l/r-T-tr I il \ Jl. KEYNOTES I J 1 MNIBICM . ._ LU U0MMHIMeilOHfUCBCM4l rri owcrrnMcMutHrim LU tMucikacjMtMiD a rr-i mmvm . .. , .. I—i" GENERAL NOTES COSTCO WHOLESALE SOIC - FUEL FACILfTY SIGNAGE QTY DESCRIPTION TVPICAL PLACEMENT 0 MEMBEttS ONLY / EKTEf) HERE VW COSTCO LOGO. 1«-l2r ALUMMUM 0 PLEASE Pua TO ra<MtRD PUMP ALUMMUM END Of EACH ISLAND MCINOINCOM MO TTWFFIC SEE OCTAIL FOR MOUNTINO 0 VWONOMY 24-• 24-ALUMMUM ENO OF EACH ISLAND FACMO EXIT SEE DETAIL WAO« FOR MOUNTINO 0 2 irnr ALUMMUM 1 TOP OF OlSPEMseR FACMO TRAFFX: 1 ON CANOPY COIUMNS FAONO TRAFFC 0 HOURS OF OPOWTION, 0PEI«XO8£D BELOWSEIF-SERWKE-SKMAGC, ON SttE OFTHE DlSPENSOt FACMO TRAFFIC AT ENTRY 0 NO SMOKING 1 STOP ENQME FLUSH MOUNT ON EACH SIDE OF ENTRY COLUMN WRAP- FACMO NOZZLE 0 ir 124-ALUMMUM FLUSH MOUNT OM MSCE FACE OF EACH EXIT COLUMN VWAP 0 IN CASE OF FIDE OR Snu. 1«- X 24- ALUMMUM. ONE SSX 0 NO CASH ON PREHKES 0 • EMEWSENCr SHur.OPP CONCEPT ELEVATIONS CARLSBAD, CA #462 94-0160-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN DD31-01 CARLSBAD, CALIFORNIA OCTOBER 09, 201 3 ,.„,«;fi;<5tSfev2:-3-SE-^ ::^^^'' « :-:fe •• • = PAI. OUAH A/«(Wr RD 7 W ^ (v GENERAL NOTES OtCWrr LOCATICW • j .1 FDOU CONSTBL'CTlON ACTlHTv .0*5: (PER ASTU HQCIF«3 BROCIOfi) --oa *»E*S TC BtCt it U. »Re -0 BE SCARfflG ^0 * OffT*. 0* T«<LVt (IJ) MCHCS, aitOUCHT TO THE "ROPtB BOISUW CONICNI. ANO COVACED TO I-<E ABOVt OtNSiTY »)»EFAi» W fffPuiCE EJIISTINO MBBOVEMEN'S n '•«£ "C«* HHiC-i "••'LiCEWEM'OR O.I*NL^" 5«*tU BE DONE TO THE SHiSfAC'lO" W 1 SI K ZCMOKtAKCl UTH IHE ;AP (.nr. fift DCF CONSTRUCTION. SJALI. UAIiRAL iK "•.•-^k:a^•,M - . — 1*-... APPLICANT: S?0 KOTHUP » LEGAL DESCR1PTKJN: APN: TOPOGRAPHY: •. JUNE 27. 0*T3 S-30-20! 3 BENCHMARK: S" fUSCOE ENCMtEBWC. INC. HAU WOPOUI. "EST SlOt Of ASMAOA 01 wiiK cif OES "HX - o ; TLUI StREET ESTIMATE OF QUANTITIES: 7) *_^CO^CP£^^S-*^ ^"^^^^p"^' CO^^PRESSl^t BJCOtJPL' WTV- ALL *P=LiC*BLE OCCUPATIONAL SAFTTT *» LEGEND - 73 - CO - CLCANOUT - LINE E^/«TIC« £ . ELEi.A-(ON . Oh CENTER SDHaj - 5AW OlECO ftCdCWW PROeC<CD CANC^r DRAIN "ROPOStO 6" CURB p DHOPOStC REIAIMWG HAiL/CUBB ^— ^— cnsnwc RfiAMNb M./t^oe DeMOUTKJN NOTES UD NOTES C BC "E-OVET & Q] CK. PORTIOH C \2\ tt. PORTIOtJ Of EK. CONCRETl RCUOVCO a REPLACED [V] EI. PORTION OF £.. CURB * 01 CONSTROCTKSN NOTES PROPOSED FlMSf-ED 5j=f*CE * DETAIL IVIS S>«Et (7) REUOvE AND REPLACE rutL-DEPTH AC PER =ER ^ GEOIEOHNICAL RECOUUENUAIIOHS (j) luStALL CONCHET SLAB PER *RCHI UCTURAL PLANS ® IKSIAu. NEH *• CANOPY DRAIN, USE SCHEJJ.t 40 PVC 0" APPROHCD EOUAL (D CCK «' MXf M EI MU FOR 4- PVC CAHOPT WA« (OJT-^ET TQ SURFACE) EUTENO ® WSIALL NE* S (B) INSTALL NEW n d) CONNECT STORw DRAIN TO E.ISTIHC A' OUTLET PIPE ® INSTALL «• OF ROUNOEC. W'SfEt COBSlt FOB ENEROY OlSSIPAIlOW @ INSTALL GuntR CHAUtCl PES OE'At TWS SHEET (jj) ORIMD 4 Oi^RLAT O T <*IH . 0.1' WAX 0 INSTALL STOBU DRAIN ClEANOUl PER SCBSC SC-0 NOTE: CARLSBAD. CA #462 E SLAB (UNDER CAHQP-O St«ALL S SEPARATOR PRtGfi tf^Oi.^ Jn , T SEKCR SYSTEM. COSTCO WHOLESALE SCAl£ r- Iff CRA=HC 5CA,.E IN FtEI PLANNING SUBMITTAL PRELIMINARY GRADING PLAN 4 JB FUSCOE ••••••••II* 94-0150-22 SEPT 19. 2013 PRELIMINARY GRADING PLAN C1.0 CARLSBAD, CALIFORNIA SEPTEMBER 19, 20 13 ^ PLAWTING NOTES TREES BOTANICAL NAME CQUMON HAHE Plalanua X ecvrtfi^ Lonclon P1an« Tras EidJ*ng m - J Tm EililtigTrsa Ell>»q o SHRUBS BOTANICAL NAME COMMON NAME CQNT Q REFERENCE m SYMBOL OESCRIPTION (7^ Eikdng bnd«c4M u> wnak^ Ant ba pfoucMd during CDmlnjctfDn. planllnaplU: A9iQm(i^(e00a4 7-6646 ft sok t»st*r3 by 4 i|uallA«d ^granom^ l4&uiatory. K PLANT FACTOR QTY nl •( any ptoilir^ InMipraUlkxn, larllHialldtl w tl regarding thua leati ara requirad. Sam(]4fl« of al Imporl toA trt 10 placemeni. MarMIng or bKli-Mir.g. i^aisr adlcivry bndscaca regulallons. I haia HI plam conuinw) Itv CICy o( Cartsbad's 1 Km WELO IhrosftaM ayslamafri ^e. l^leasa nt Id by ma CwtMud MurMul W -Indian Hawthorn (41) hw—I 1 il PALOMAR AIRPORT ROAD CCA INC K «_ IN J S «_l! I«[«S_S 0_ CI * T_[ 5. J 3633 LoKi BfCH BOULEV»HI3, Sun JOO LDBS BtACH CAJ-ORM* 9O607 TEL. 562.424 eiez MULVANNYjG2 COSTCO WHOLESALE ENLARGED LANDSCAPE PLAN DD1.1-01L CARLSBAD, CALIFORNIA APRIL 1 , 2014