Loading...
HomeMy WebLinkAboutEA 12-06; La Costa Recycled Pipeline; Administrative Permits (ADMIN)• Application Form For EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM THIS SECTION FOR PLANNING DIVISION USE ONLY PROJECT (EA) #: I -e:A 1'2. -0 (p I DATE SUBMITTED: I I '2. -I'D-I '2-I PLANNER: I PROJECT NAME/TITLE: La Costa Recycled Pipeline PROJECT PROPONE~~~: David AhlesiUtilities (/. AUTHORIZED SIGNATURE~ .442!~ cf,r;{:AA. Please type your responses in the boxes provided below. The form may be expanded to accommodate as much information as you choose to provide. -"7. Have you submitted any previous early assessment applications for this project with Planning staff? If so, please attach a copy of the original request and the Planning Division's response. No Is the project part of an approved CIP budget or a future CIP budget? If so, please provide the CIP Project#. Approved CIP No. 5208 List any previous and/or anticipated future Planning Commission or City Council actions (e.g., permit approvals, activity authorizations, etc.) related to this project MND-Phase Ill Recycled Water Project (November 2012), Authorization to Bid (February 2012) Award of Construction Contract (April 2012) List any previously certified environmental documents (e.g., EIRs, Negative Declarations). Program EIR -Recycled Water Master Plan, (Approved November 2012) MND-Phase Ill Recycled Water Project, (Approved November 2012) List any technical studies that have been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic, noise, etc.). See MNN Document Is the project on City property? If not, has property owner authorization or an easement been secured? City ROW and La Costa Resort Property. Easement Documents are being prepared. P-15 Page 2 of3 RECEIVED DEC 1 0 lUll CITY OF CARLSBAD PLANNING DIVISION Revised 09/11 Identify the project location. Include specific parcel numbers if possible. El Camino Real (From Alga Street to La Costa Resort) • Identify the project schedule. List critical and desired milestones including dates in the development review and construction process (e.g., public hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). Authorization to Bid (February 2012) Award of Construction Contract (April 2012) DESCRIPTION OF PROPOSAL -Describe the project in as much detail as possible. Use as much space as needed. Attach additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. 7,000 LF of 12-inch PVC Pipe 2,000 LF of 6-inch HOPE Pipe See attached 50% Drawings for additional detail. P-15 Page 3 of3 Revised 09/11 • • • DFILE Memorandum December 20, 2012 To: From: Via Re: David Ahles, Senior Engineer Barbara Kennedy, Associate Planner Dave de Cordova, Principal Planner EA 12-06-LA COSTA RECYCLED PIPELINE Thank you for submitting an Early Assessment for a recycled water pipeline project proposed along El Camino Real (ECR), between Aviara Parkway/Alga Road and La Costa Avenue, and partially within the La Costa Golf Course. The project consists of the installation of 7,000 LF of 12-inch PVC Pipe and 2,000 LF of 6-inch HOPE Pipe which would be located within an existing roadway (ECR) and partially within the La Costa Resort property. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of an Early Assessment is to provide you with direction and comments on the overall concept of your project. This Early Assessment does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans. policies. and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal. new plans. policies. and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. PLANNING: General 1. General Plan and zoning designations for the property are as follows: 2. a. General Plan: El Camino Real: Prime Arterial; La Costa Golf Course: Open Space (OS). b. Zoning: El Camino Real: Arterial Roadway; La Costa Golf Course: Planned Community (P-C) with an underlying zone of Open Space/General Commercial (OS/C-2). c. The portion of the pipeline that is located within El Camino Real is in the Coastal Zone (Mello II and East Batiquitos Lagoon/Hunt Properties Segment). d. Specific or Master Plan: The portion of the pipeline located east of El Camino Real is located within Planning Area 7 of the La Costa Resort and Spa Master Plan (MP 03-02(B)). The portion of the pipeline that will be installed in the La Costa Golf Course is within a Special Flood Hazard overlay zone. Typically, a Special Use Permit (SUP) is required for development in this overlay zone. However, in this instance an SUP is not required because the project does not Community & Economic Development 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-2710 I 760-602-8560 fax EA 12-06-LA COSTA RECY~D PIPELINE December 20, 2012 • Pa e2 include any structures, it will not alter the existing landform or watercourse, and it will not reduce the flood-carrying capacity of the site. 3. In accordance with CMC Section 21.110.170 of the Floodplain Management Regulations the project will be conditioned to comply with the following standards for utilities: All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from systems in to floodwaters. 4. The project requires a Coastal Development Permit (COP). The coastal zone boundary extends to the easternmost r.o.w. along El Camino Real and the installation of a new pipeline within this area triggers the requirement for a COP. 5. Please revise the following sheets: a. Sheet 1-The vicinity map and location map should be revised to show Aviara Parkway on the west side of El Camino Real and Alga Road on the east side. Also update the names listed under the Board of Directors. b. Sheet 11-Please relocate the proposed pipe alignment northward into the parking lot area so that it is farther away from the creek. c. Sheet 13 -At Station 79+00, please clarify that the recycled water pipeline will be hung on the small bridge over the unnamed creek. d. Sheet 14 -Indicate that trenchless construction will be used to install the pipeline that crosses under San Marcos Creek near Station 85+00. ENVIRONMENTAL: 1. This project is a sub-component of Expansion Segment 8 of the Phase Ill Recycled Water Project and is subject to the Mitigation Measures (MM) that are identified in the Mitigated Negative Declaration (MND) (EIA 12-02) that was adopted for the Phase Ill project. This project will need to incorporate MM Bio-lA through BiolF to reduce potential impacts to Biological Resources to a less than significant level, and MM Haz-1 and Haz-2 to ensure that workers are not exposed to contaminated sofls. Please include the MM as notes on the plans and/or incorporate the MM into the contract documents. 2. If SWRCB funds will be used for this project, additional "CEQA-Pius" environmental documentation will be required. 3. The applicable Project Design Features that are identified in the Phase Ill MND will need to be incorporated into the project. Please include these features as notes on the plans and/or include the Project Design Features as an attachment to the contract documents. ' • EA 12-06-LA COSTA RECYCLED PIPELINE • December 20, 2012 Pa e 3 LAND DEVELOPMENT ENGINEERING: 1. The plans provided are incomplete. Additional issues may be identified upon review of complete plans. Please see comments on the attached plans. All necessary application forms and submittal requirements are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or online at www.carlsbadca.gov. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown; select Department Listing; select Planning Home Page. Please review all information carefully before submitting. If you would like to schedule a meeting to discuss this letter with your staff planner, please contact Barbara Kennedy, Associate Planner, at (760) 602-4626 or your staff engineer, Tecla Levy, Associate Engineer, at (760) 602-2733. DD:BK:sm c: Don Neu, City Planner Dave de .Cordova, Team Leader Tecla Levy, Project Engineer Greg Ryan, Fire Prevention Bill Plummer, Utilities File Copy Data Entry DATE: CITY OF CARLSBAD REVIEW AND COMMENT MEMO DECEMBER 10, 2012 PROJECT NO(S): _:E~A::..:1::2:...:-0:::6:._ ____________ REVIEW NO: ---'1=------1 PROJECT TITLE: LA COSTA RECYCLED PIPELINE=------------------j APPLICANT: CITY OF CARLSBAD/BILL PLUM:..::Mc.:..:=ER:.:__ ___________ ---.j TO: [8J Land Development Engineering-Administration 0 Police Department-J. Sasway 0 Fire Department-Greg Ryan 0 Building Department-Will Foss 0 Recreation -Mark Steyaert 0 Public Works Department (Streets)-Nick Roque 0 Water/Sewer District 0 Landscape Plancheck Consultant-PELA 0 School District 0 North County Transit District-Planning Department 0 Sempra Energy-Land Management 0 Caltrans (Send anything adjacent to 1-5) 0 Parks/Trails-Liz Ketabian *ALWAYS SEND EXHIBITS FROM: PLANNING DEPARTMENT Please review and submit written comments and/or conditions to the PLANNING TRACKING DESK in the Planning Department at 1635 Faraday Avenue, by 1/9/13. If you have "No Comments," please so state. If you determine that there are items that need to be submitted to deem the application "complete" for processing, please immediately contact the applicant and/or their representatives (via phone or e-mail! to let them know. Thank you COM M ENTS:. __ 4f....!l.:::u...t:.=:.._...J4..!!!<l~L_::::~~~!.:::..:=- IA.K _i"CJ)~ . lrM.i,fM,..,J ICwt.s ev ,.__. CQ~ r!o...i' . v~Sig~ PLANS A IT ACHED Review & Comment Date o3/10 1\K