Loading...
HomeMy WebLinkAboutEA 13-04; Recycled Pipeline Phase III; Administrative Permits (ADMIN)(t~ CITY OF ~CARLSBAD Memorandum November 26, 2013 To: David Ahles, Senior Engineer From: ·f• 17 · Pam Drew, Associate Planner Via (kC!/David de Cordova, Principal Planner Re: yt/ EA 13-04-RECYCLED PIPELINE PHASE Ill PIPELINE EXTENSION SEGMENT 18 Thank you for submitting an Early Assessment to: 1) install 700 linear feet of 8-inch PVC pipe at Palmer Way, starting at the intersection of Faraday Avenue, and continuing north to the intersection of Impala Drive; and 2) install 1,500 linear feet of 6-inch PVC pipe at Impala Drive, starting at the intersection of Palmer Way, and continuing east to the intersection of Orion Street within the public rights-of-way. In response to your application, the Planning Division has prepared this comment Jetter. Please note that the purpose of an Early Assessment is to provide you with direction and comments on the overall concept of your project. This Early Assessment does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies. and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans. policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. The project will not need any permits from Planning; however, the project must comply with C.M.C. Chapter 8.48-Noise, which regulates permitted hours for construction. 2. On November 27, 2012, the Carlsbad Municipal Water District {CMWD) adopted Resolution No 1455 adopting a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) for the Phase Ill Recycled Water Project. This project is a sub-component (ES 18) of the Phase Ill Recycled Water Project and is subject to the Mitigation Measures {MM) that are identified in the MMRP. It was determined that the project could have direct contact with hazards and hazardous materials. This project is required to incorporate the following MMs to ensure that the potential impacts are reduced to a less than significant level. Please include the MMs as notes on the plans and/or incorporate the MMs into the contract documents. Mitigation Measures Haz-1-Excavation Monitoring. During excavation activities CMWD shall provide monitoring by an individual licensed in the State of California to assess soil conditions for the potential presence of contaminated soils. In the event of encountering hydrocarbon contaminated soils, these soils shall be properly tested, managed, and disposed of at a licensed facility in accordance with DEH requirements. Community & Economic Development 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-2710 I 760-602-8560 fax EA 13-04-RECYCLED PIPELINE PHASE Ill PIPELINE EXTENSION SEGMENT 18 November 26, 2013 Pa e 2 Haz-2 -Construction Worker Health and Safety Work Plan. Prior to construction CMWD shall have a project-specific health and safety work plan prepared and distributed to the construction workers to address the potential exposure to hazardous materials associated with working with or near contaminated soil. This work plan shall comply with all County of San Diego DEH work plan requirements including Community Health and Safety Planning to address physical hazards, site security, management of soil and water, and monitoring equipment. A description of engineering controls and measures that would be put in place to prevent and/or reduce the risks posed to site workers, public and the environment in the unlikely event of excavating contaminated soil from the construction area shall be provided in the work plan and submitted to the DEH for approval. The engineering controls and measures to be implemented if potentially contaminated soil is uncovered shall include, but not be limited to the following: 1) An exclusion zone and support zone shall be established prior to start and during excavation activities. No unauthorized personnel shall be allowed in these zones. Personnel authorized to work in these zones shall have the required training and qualifications including OSHA HAZWOPER training. 2) Written notifications shall be posted on the perimeter fencing in advance of start of excavation to notify the general public of the nature and duration of work activities. The postings shall also include emergency contact names and telephone numbers. 3) No eating, drinking or smoking shall be allowed within the exclusion or support zones. 4) Site workers shall be required to wear personal protective equipment including gloves, dust masks or respirators, hard hats, steel toed boots, Tyvek® protective clothing, eye shield and ear plugs or ear muffs. 5) A decontamination zone shall be established for site workers to use prior to exiting the exclusion zone. 6) All excavated soil shall be underlain and covered by plastic or VisqueenTM, if stored on site, to prevent or reduce off-gassing into the atmosphere and to protect the stockpile from erosion due to storm runoff. If on-site temporary storage becomes necessary, the stockpiles shall be placed downwind downstream of any sensitive receptors in the area. 7) All work shall stop if ambient air concentrations exceed acceptable thresholds as approved by the san Diego County DEH, and excavation shall be backfilled with inert soil or other material until concentration drop back to normal. 8) Exposure to dust and potential inhalation hazards shall be controlled by lightly spraying the excavated materials with clean water as they are stockpiled on site or as they are transferred to trucks for shipment offsite. A dust monitor shall be used on site to measure airborne dust during activities that are expected to generate dust. If dust levels exceed permissible exposure levels as set by OSHA standards, additional measures for dust control such as the use of industrial non-toxic dust suppressants shall be implemented. 9) · Runoff around the excavation site shall be controlled by placing fiber rolls or other similar types of erosion and runoff control means to direct surface runoff and to protect the nearby downstream storm drains. ., .. EA 13-04-RECYCLED PIPELINE PHASE Ill PIPELINE EXTENSION SEGMENT 18 November 26, 2013 Pa e 3 10) Vehicular and pedestrian traffic shall be directed away from the construction zone prior to and during excavation and follow-on activities in accordance with a traffic plan approved by the City of Carlsbad, as applicable, and in coordination with CMWD. Land Development Engineering: No comments If you would like to schedule a meeting to discuss this letter with your staff planner, please contact Pam Drew, Associate Planner at ext. 4644, or your staff engineer, Jason Geldert, Senior Engineer at ext. 2758. DD:PD:bd c: Don Neu, City Planner Scott Donnell, Senior Planner Jason Geldert, Senior Engineer File Copy Data Entry ,_ Application Form For EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM THIS SECTION FOR PLANNING DIVISION USE ONLY PROJECT (EA) #: DATE SUBMITIED: PLANNER: PROJECT NAMEITITLE: Recycled Pipeline Phase Ill Pipeline Extension Segment 18 PROJECT PROPONENT/DEPT. CONTACi SIGNATURE: AUTHORIZED SIGNATURE: David Ahles/Utilities Please type your responses in the boxes provided below. The form may be expanded to accommodate as much information as you choose to provide. Have you submitted any previous early assessment applications for this project with Planning staff? If so, please attach a copy of the original request and the Planning Division's response. No Is the project part of an approved CIP budget or a future CIP budget? If so, please provide the CIP Project#. Yes, Approved CIP No. 5208 List any previous and/or anticipated future Planning Commission or City Council actions (e.g., permit approvals, activity authorizations, etc.) related to this project MND-Phase Ill Recycled Water Project (November 2012), -Authorization to Bid (December 2013) Award of Construction Contract (March 2014) List any previously certified environmental documents (e.g., EIRs, Negative Declarations). RE.CE.~\H:D Program EIR-Recycled Water Master Plan, (Approved November 2012) MND-Phase Ill Recycled Water Project, (Approved November 2012) ("""''T 3 j\ ' ' .;t~ \ -.1 --.;::--'\r"j or-cr. •-<~ :-'o) .... CITY -•"'· ,_-, (-. I ',,1 PLANNING D'Nk•\0 ' List any technical l;tudies that have been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic, noise, etc.). See MNN Document Is the project on City property? If not, has property owner authorization or an easement been secured? The entire project is located within the paved City ROW P-15 Page 2 of3 Revised 09/11 • • Identify the project location. Include specific parcel numbers if possible. Palmer Way and Impala Drive. Identify the project schedule. List critical and desired milestones including dates in the development review and construction process (e.g., public hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). Authorization to Bid (December 2013) Award of Construction Contract (March 2014) DESCRIPTION OF PROPOSAL:_ Describe the project in as much dei"ail as possible. Use as much space as needed. Attach i additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. 700 LF of 8-inch PVC Pipe 1 ,500 LF of 6-inch PVC Pipe See attached 100% Drawings for additional detail. P-15 Page 3 of 3 Revised 09/11 CITY OF CARLSBAD REVIEW AND COMMENT MEMO DATE: NOVEMBER 1, 2013 PROJECT NO(S): PROJECT TITLE: APPLICANT: TO: RECYCLED WATER PROJECTS PHASE Ill (PIPELINE EXTENSION SEGMENT 18) CITY OF CARLSBAD/DAVID AHLES 0 Public Works (Storm Drain)-Clayton Dobbs D Public Works (Wastewater)-Don Wasko 0 Public Works (Water)-Jase Warner .8 Land Development Engineering 0 Police Department-J. Sa sway 0 Fire Department-Greg Ryan 0 Building Division-Will Foss 0 Water/Sewer District 0 Parks & Recreation (Parks/Trails)-Liz Ketabian 0 Parks & Recreation (Trees & Medians)-Mike Bliss 0 Public Works Department (Streets)-Nick Roque 0 Public Works Department (Traffic)-John Kim 0 Public Works Department (Design)-Bill Plummer *ALWAYS SEND EXHIBITS FROM: PLANNING DIVISION 0 Landscape Plancheck Consultant-PELA 0 School District 0 North County Transit District-Planning Dept. 0 Sempra Energy-Land Management D Caltrans (Send anything adjacent to 1-5) Please review and submit written comments and/or conditions to the PLANNiN'cffRA"ci<ii\lc.toesK' rn the Planning Division at 1635 Faraday Avenue, byii12i/il1f you have "Nol':oin"ments/''"jlle:i'S'~";~·;t~te:· If you determine that there are items that nel!lf"ftr'll'e .. submitted to deem the application "complete" for processing, please immediately contact the applicant and/or their representatives !via phone or e-mail) to let them know. Thank you 1 / ,....-r- COMM ENTS:----,,f.Jh~,.~J'-"Q:.L-____..(_0 'oJ.f"r..;:.._t.l'."'-.1~~""'""-' t-1 _..('" _______________ _ I /Date PLANS ATIACHED Review & Comment 03/13