Loading...
HomeMy WebLinkAboutEA 2017-0004; INTERSECTION IMPROVEMENTS AT ECR AND COLLEGE BOULEVARD; Early Assessment (EA)• REC i?: IVI;: o, JUN 1 6 2017 Application Form For EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM PLANNING DIVISION THIS SECTION FOR PLANNING DIVISION USE ONLY PROJECT NAME/TITLE: Intersection Improvements at ECR and College Boulevard PROJECT PROPONENT/DEPT. CONTACT SIGNATURE: Brandon Miles / Public Works -Transportation Please type your responses in the boxes provided below. The form may be expanded to accommodate as much information as you choose to provide. Have you submitted any previous early assessment applications for this project with Planning staff? If so, please attach a copy of the original request and the Planning Division's response. No Is the project part of an approved CIP budget or a future CIP budget? If so, please provide the CIP Project#. Yes, CIP Project 6071 List any previous and/or anticipated future Planning Commission or City Council actions (e.g., permit approvals, activity authorizations, etc.) related to this project. City Council will vote on Professional Service Agreement with Michael Baker on 7/11/17 to begin design List any previously certified environmental documents (e.g., El Rs, Negative Declarations). None List any technical studies that have been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic, noise, etc.). Hydrology & Hydraulics Report, Stormwater Plans, SWPPP, Geotechnical Report, Percolation Report, Traffic Control Plans, SWQMP, and BMP Design. Is the project on City property? If not, has property owner authorization or an easement been secured? Yes, however a small sliver may need to be acquired for improvements of a right-turn only lane. This could be an exchange. The area is all landscaping. P-15 Page 2 of 3 Revised 09/11 ----------------------------------·---··----·-··---------· Identify the project location. Include specific parcel numbers if possible. Project location is at the intersection of ECR and College Boulevard. The south / west area at the existing "pork- chop" existing right turn to si'l~~und College Boulevard. Identify the project schedule. List critical and desired milestones including dates in the development review and construction process (e.g., public hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). Design is expected to take a year starting July 2017, with council approval construction could start as early as January 2019. DESCRIPTION OF PROPOSAL-Describe the project in as much detail as possible. Use as much space as needed. Attach additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. The project is located at the intersection of ECR and College Boulevard. A right turn only lane from ECR to southbound College Boulevard is proposed and the removal of the refuge pedestrian island. Currently a pedestrian refuge island exists on the southwest corner. Pedestrians desiring to cross ECR or College Boulevard must first wait for a gap between vehicles to cross the free right and reach the "pork chop" to push the pedestrian button. Removing the island will provide a safer crossing for pedestrians. The wider and longer storage length of a dedicated right turn only lane will enhance operations for the thru and right turns. The bike lane striping could be enhanced for better separation from vehicles as well. The traffic signal will need to-be relocated and possible modification to signal heads to align with the proper lanes. Additional right-of-way may be necessary to accommodate the right turn only lane and appropriate storage length on ECR. Considerations to exchange public right-of-way near College Boulevard may be considered if the free right is removed. A small retaining wall may be necessary as well along ECR. Other impacts may be the landscaping modifications for both the public and private areas of right-of-way. P-15 Page 3 of 3 Revised 09/11 \ MAP NOT TO SCALE PROJECT NAME EL CAMINO REAL AND COLLEGE BOULEVARD INTERSECTION IMPROVEMENTS PLOTTfD 8Y: SCOTT £VANS PLOT DA Tf: 2/9/17 PA TH:D: \TRANSPORTA nON D£PARTll£NT\LOCA nON MAPS\AUTDCAD\6D71.DtW; PROJECT NUMBER 6071 EXHIBIT 1 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION ECR & COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT NAME PROJECT LOCATION: ECR & College Boulevard Intersection PROJECT DESCRIPTION: PROJECT NO . Improve the intersection by widening south bound El Camino Real to provide three through lanes and a dedicated right turn lane to west bound College Boulevard. PROJECT NEED: To improve the capacity of the intersection and to update the roadways to conform to the roadway classification as described in the circulation element. FINANCING: Purpose Environmental Design Property Acq. Construction Total Cost= Estimated Cost $ 16,000 $ 55,000 $ 34,000 $410,000 $515,000 GENERAL PLAN CONSISTENCY: Funding Source Developer/CU SD Developer/CU SD Developer/CU SD Dev/CU SD/Unfunded A City with an adequate circulation infrastructure to serve the project population. Circulation Element, Streets & Traffic Control, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (c) -Minor alteration of existing facilities, including streets, involving negligible or no expansion. ECR and College Blvd lnersection Imp