Loading...
HomeMy WebLinkAboutEIR 83-02A; PACIFIC RIM COUNTRY CLUB AND RESORT; Environmental Impact Report (EIR)I 2 NO.: - fiL:? (/2) DA93 RECEIVED: APPLICANT: E52T OR EXCEPTED: Posted: ______________ Prior Canpiiance: Published: Filed Filed: NEGATIVE DECLARATION: DECLARATIC: Posted: Published: Notice of Detennination:_______ rIiL ICI REPORT: Nc.fice of -- Notice of , Notice of , prajj<n Z'i 5 Canpietiori:5F eit) Detennination:lI'i 0 NNJiL 0. 'TSSI Da.e o'. Heing:__________ P ) . catioi . NU tc i? opety On€s:________________ 11:1 PmouLion Date: (Conthd tü: •). Ao;1: ________ _________ ACTTGN CI'S COUNCIL J 1Daice of Herincj:___________________ 2. Notices to City Clerk:__________________ 3. Agenda }Jill______________________________ Resolution No.___________________________ 5. Ordinance No. - Date: Staff Report to 2'pplicant:___________________ Resolution to Applicant:_____________________ . Exhibit 2 1' WESTEC Services, Inc. 3211 Fifth Avenue, San Diego, CA 92103-5765 (619) 294-9770 85-105-E March 25, 1985 Mr. Charlie Grimm City of Carlsbad Land Use Planning Office 1200 Elm Avenue Carlsbad, CA 92008 Dear Mr. Grimm: WESTEC Services is pleased to respond to your request for a proposal to prepare a Subsequent EIR for the HPI development project in Carlsbad. The document will in- corporate by reference portions of the previous EIR for this site, but the subsequent EIR will be a separate report. As you know, our firm prepared the EIR for the initial annexation and development proposal, so we're very familiar with the site and relevant issues. WESTEC will utilize the services of Willdan Associates to complete the revised traffic analysis for inclusion in the EIR and the remainder of the work will be per- formed by our in-house staff. Project Team Mr. Thomas Larkin will serve as Senior Project Manager to provide overall project direction and quality assurance. Mr. Larkin serves as Manager of the Urban Studies Group at WESTEC Services. He will attend any scoping meetings and public hearings for the project. David Claycomb will serve as Project Manager and will be responsible for the day-to-day direction of the project team. Ms. Terri Jacques will serve as key environmental analyst and Mr. Stephen Lacy will conduct biological evaluations. Com- plete resumes of project team members have been forwarded to you previously. Table 1 shows expected project team member contributions to the preparation of this EIR: Table 1 PROJECT TEAM CONTRIBUTIONS Name Thomas Larkin David Claycomb Stephen Lacy Percent of Title Analysis Effort Senior Project Manager 10 Project Manager 20 Senior Biologist 10 San Diego, CA • Ventura, CA • Brawley, CA • Phoenix. AZ • Philadelphia, PA • Washington, D.0 . Terri Jacques Environmental Analysts 40 Cynthia Burgess Robert Sergeant Traffic Engineer - Willdan Associates 20 Schedule The preliminary Draft EIR will be prepared and three copies submitted for review by the City of Carlsbad within 4 weeks of official notification to proceed and receipt of all project information, including the Lagoon Enhancement Plan. This schedule com- mitment (and the cost discussed below) assumes that no significant changes in the description or scope of the proposed project occur once we have begun our analysis efforts. Following review of the preliminary Draft EIR by the City of Carlsbad, WESTEC Services will revise the document, as necessary, in response to any comments, and prepare 50 copies of the Draft EIR, including 1 reproducible copy, for public review within 2 weeks. At the end of the EIR public review period, WESTEC Services, in consultation with the City of Carlsbad, will prepare responses to comments. Comments and res- ponses will be combined with the Draft EIR to constitute the Final EIR. The Senior Project Manager will attend a maximum of four public hearings. Cost The estimated cost for preparing the Subsequent EIR for the proposed project is $16,600.00, plus time-and-materials charges for all work performed in conjunction with the biological resources evaluation. The fee includes preparation and submittal of 3 copies of the preliminary Draft EIR, integration of modifications requested by the City, submittal of 50 copies of the Draft EIR in 3-ring binders (including 1 reproducible copy), response to public comments to the Draft, and attendance at a maximum of four public hearings with presentations, as necessary, at the hearings. A breakdown of this esti- mated cost is provided below in Table 2: Table 2 COST ESTIMATE Draft EIR Land Use $ 800 Traffic (new analysis - Willdan Associates) 3,600 Public Services 400 Hydrology 200 Water Quality 200 Air Quality 400 Biology (Time and Materials) -* S 'I Other Sections (Agriculture, Fiscal, Archaeology, Geology, Growth Inducement) 300 Visual/Aesthetics (no grading plan) 200 Noise (new analyses based on new traffic data) 2,000 Other Required Sections (Summary, Introduction, Alternatives, Cumulative Effects, Environmental Setting, Project Description) 1,000 Final EIR Responses to Comments and FEIR 1,150 Project Management Senior Project Manager 850 Project Manager 1,200 Meetings 1,000 C, - Graphics 600 Word Processing 1,400 Reproduction 1,000 Indirect Costs (Mileage, postage, phone, binders) 300 Total $16,600* *plus time-and-materials charges for all work associates with biological resources eval- uation. Thank you for contacting WESTEC to provide environmental consulting services. We look forward to working with the City of Carlsbad on this project. Please can me if you have questions. Sincerel Thomas M. Larkin Manager, Urban Environmental Services TML/yp