HomeMy WebLinkAboutGPA 09-07; Palomar Commons; General Plan Amendment (GPA) (3)STATE OF CALIFORNIA |^ ^ifE^l
GOVERNOR'S OFFICE O/PLANNING AND RESEARCH
STATE CLEARINGHOUSE AND PLANNING UNIT
AKKOLD SCHWARZENEGGER CYNTHIABRYANT
CITY OF GARLSBAD
June 28, 2010
01 2010
Van Lynch
City of Carlsbad Community & Economic
Planning Department Oevelopment Department
1635 Faraday Avenue
Carlsbad, CA 92008
Subject: Palomar Commons
SCH#: 2010051074 i
I
Dear Van Lynch:
The State Clearinghouse submitted the above named Negative Declaration to selected state agencies for
review. On the enclosed Document Details Report please note that the Clearinghouse has listed the state
agencies that reviewed your document. The review period closed on June 25, 2010, and the comments
from the responding agency (ies) is (are) enclosed. If this comment package is not in order, please notify
"the State Clearinghouse immediately. Please refer to the project's ten-digit State Clearinghouse number in
future correspondence so that we may respond promptly.
Please note that Section 21104(c) of the CaHfomia Public Resources Code states that:
"A responsible or other public agency shall only make substantive comments regarding those
activities involved in a project which are within an area of expertise of the agency or which are
required to be carried out or approved by the agency. Those comments shall be supported by
specific documentation."
These comments are forwarded for use in preparing your final enviromnental document. Should you need
more information or clarification of the enclosed comments, we recommend that you contact the
commenting agency directly.
This letter acknowledges that you have complied with the State Clearinghouse review requirements for
draft enviromnental documents, pursuant to the California Environmental Quality Act. Please contact the
State Clearinghouse at (916) 445-0613 if you have any questions regarding the environmental review
process.
Sincerely,
scott Morgan
Acting Director, State Clearinghouse
Enclosures
cc: Resources Agency
1400 10th Street P.O. Box 3044 Sacramento, California 95812-3044
(916) 445-0613 FAX (916) 323-3018 vmw.opr.ca.BOV
Document Details Report
State Clearinghouse Data Base
SCH# 2010051074
Project Title Palomar Commons
Lead Agency Carlsbad, City of
Type Neg Negative Declaration
Description NOTE: Review Per Lead
A request for a General Plan Amendment, Zone Change, Site Development Plan, Special Use Permit,
four Conditional Use Permits, and a Variance to allow the development of a 185,246 sf retail
commercial center on 16.55 acres located at the southwest comer of Paiomar Airport Road and El
Camino Real. The General Plan Amendment will create new text and Land Use designation of General
Commercial (GC) and change the existing land use from Travel Recreation/Commercial (T-R) and a
portion (.87 acre) of Planned industrial (PI) to General Commercial (GC). A Zone Change from
Commercial Tourist- Qualified development overlay (C-T-Q) and Planned Industrial (PM) (.87 acre) to
General Commercial (C-2-Q) will implement the new land use designations. The Special Use Permit is
for the development adjacent to the El Camino Real Scenic Corridor. The Conditional Use Permits will
allow gas station/carwash, drive thru facilities for the bank, and a modification of the entrance to the
adjacent San Diego County Animal Control facility. The variance is for the modification of the overall
and individual sign area and letter height allowance for the home improvement store. The project will
modify the entrance to the San Diego County Animal Shelter, add a new signalized intersection on
Palomar Airport Road, close the existing left turn lane onto the project site on northbound El Camino
Real, and add new deceleration lanes for project entrances on Palomar Airport Rd and El Camino
Real. The project wiil also modify the northbound left turn lane on El Camino Real to Palomar Airport
Road to provide dual left turn lanes at the intersection and construct a separate eastbound right turn
lane only lane on Palomar Airport Road at the El Camino Real intersection. The project will require
grading with an import of soil material. The project site was formerly developed as the Olympic Resort
and Spa, which included an 80 room hotel, restaurant, health club, spa, conference center, parking lot,
tennis courts and a golf driving range.
Document Details Report
State Clearinghouse Data Base
Lead Agency Contact
Name Van Lynch
Agency
Phone
email
Address
City
City of Carlsbad
760-602-4613
Planning Department
1635 Faraday Avenue
Carlsbad
Fax
State CA Zip 92008
Project Location
County
City
Region
Lat/Long
Cross Streets
Parcel No.
Township
San Diego
Carlsbad
33° 07'41"N/117°16' 03" W
Palomar Airport Rd and El Camino Real
213-020-18-00 AKA 760-221-015
Range Section Base
Proximity to:
Highways
Airports McClellan/Palomar
Railways
Waterways
Schools
Land Use
Carlsbad and San Marcos Unified School Districts
Vacant (under demolition)/Commercial Tourist/Travel/Recreation Commercial
Project Issues Air Quality; Archaeologic-Historic; Noise; Toxic/Hazardous; Traffic/Circulation; Vegetation
Reviewing Resources Agency; Department of Fish and Game, Region 5; Department of Parks and Recreation;
Agencies Department of Water Resources; Caltrans, Division of Aeronautics; Califomia Highway Patrol;
Caltrans, District 11; Regional Water Quality Control Board, Region 9; Department of Toxic
Substances Control; Native American Heritage Commission
Date Received 05/26/2010 Start of Rev/ew 05/26/2010 End of Review 06/25/2010
Departnnent of Toxic Substances Control
Linda S. Adams
Secretary for
Environmental Protection
Maziar Movassaghi
Acting Director
5796 Corporate Avenue
Cypress, Califomia 90630
Arnold Schwarzenegger
Governor
June 17, 2010
RECBVED
JUN 23 im
1 STATE CLEABINGI^
Mr. Van Lynch
City of Carisbad Planning Division
1635 Faraday Avenue
Carlsbad, California 92008
DRAFT MITIGATED NEGATIVE DECLARATION (ND) FOR PALOMAR COMMONS
{SCH# 2010051074)
Dear Mr. Lynch:
The Department of Toxic Substances Control (DTSC) has received your submitted
document for the above-mentioned project. As stated in your document: "A request for
a General Plan Amendment, Zone Change, Site Deveiopment Plan, Special Use
Permit, four Conditional Use Permits, and a Variance to allow the development of a
185,246 square foot retail commercial center on 16.55 acres located at the southwest
corner of Palomar Airport Road and El Camino Real. The General Plan Amendment will
create new text and Land Use designation of General Commercial and change the
existing land use from Travel Recreation/Commercial (T-R) and a portion (.87 ac) of
Planned Industrial (PI) to General Commercial (GC). A Zone Change from Commercial
Tourist- Qualified development overly (C-T-Q) and Planned Industrial (PM) (.87 ac) to
General Commercial (G-2-Q) will implement the new land use designations. The Special
Use Permit is for the development adjacent to the El Camino Real Scenic Corridor. The
Conditional Use Permits will allow gas statlon/canwash, drive thru facilities for the bank,
and a modification ofthe entrance to the adjacent San Diego Counfy Animal Control
facility. The variance is for the modification ofthe overall and individual sign area and
letter height allowance for the home improvement store. The project will modify the
entrance to the San Diego Counfy Animal Shelter, add a new signalized intersection on
Palomar Airport Road, close the existing left turn lane onto the project site on
Northbound El Camino Real, and add new deceleration lanes for project entrances on
Palomar Airport Road at the El Camino Real. The project will also modify the
northbound left turn lane on El Camino Real to Palomar Airport Road to provide dual left
turn lanes at the intersection and construct a separate eastbound right turn lane only
lane on Palomar Airport Road at the El Camino Real intersection. The project will
require grading with an import of soil material. The project site was formerly developed
® Printed on Recycled Paper
Mr. Van Lynch
June 17, 2010
Page 2
as the Olympic Resort and Spa, which included an 80 room hotel, restaurant, health
club, spa, conference center, parking lot, tennis courts and a golf driving range".
Based on the review of the submitted document DTSC has the following comments:
1) The ND should identify and determine whether current or historic uses at the
project area may have resulted in any release of hazardous wastes/substances.
2) The document states that the ND would identify any known or potentially
contaminated sites within the proposed project area. For all identified sites, the
ND should evaluate whether conditions at the site may pose a threat to human
health or the environment. Following are the databases of some of the
regulatory agencies:
• National Priorities List (NPL): A list maintained by the United States
Environmental Protection Agency (U.S.EPA).
• EnviroStor, a database primarily used by the California Department of
Toxic Substances Control, at www. Envirostor.dtsc.ca.gov.
• Resource Conservation and Recovery Information System (RCRIS):
A database of RCRA facilities that is maintained by U.S. EPA.
• Comprehensive Environmental Response Compensation and Liabilify
Infonnation System (CERCLIS): A database of CERCLA sites that is
maintained by U.S.EPA.
• Solid Waste Information System (SWIS): A database provided by the
California Integrated Waste Management Board which consists of both
open as well as closed and inactive solid waste disposal facilities and
transfer stations.
• GeoTracker: A List that is maintained by Regional Water Quality Control
Boards.
• Local Counties and Cities maintain lists for hazardous substances cleanup
sites and leaking underground storage tanks.
• The United States Army Corps of Engineers, 911 Wilshire Boulevard,
Los Angeles, California, 90017, (213) 452-3908, maintains a list of
Formerly Used Defense Sites (FUDS).
3) The ND should identify the mechanism to initiate any required investigation
Mr. Van Lynch
June 17, 2010
Page 3
and/or remediation for any site that may be contaniinated, and the government
agency to provide appropriate regulatory oversight, if hazardous materials or
wastes were stored at the site, an environmental assessment should be
conducted to determine if a release has occurred. If so, further studies should be
carried out to delineate the nature and extent of the contamination, and the
potential threat to public health and/or the environment should be evaluated. It
may be necessary to determine if an expedited response action is required to
reduce existing or potential threats to public health or the environment. If no
immediate threat exists, the final remedy should be implemented in compliance
with state laws, regulations and policies.
4) The project construction may require soil excavation and soil filling in certain
areas. Appropriate sampling is required prior to disposal of the excavated soil.
If the soil is contaminated, properly dispose of it rather than placing it in another
location. Land Disposal Restrictions (LDRs) may be applicable to these soils.
Also, ifthe project proposes to import soil to backfill the areas excavated, proper
sampling should be conducted to make sure that the imported soil js free of
contamination.
5) Human health and the environment of sensitive receptors should be protected
during the construction or demolition activities. A study of the site overseen by
the appropriate government agency might have to be conducted to determine if
there are, have been, or will be, any releases of hazardous materials that may
pose a risk to human health or the environment.
6) If during construction/demolition of the project, soil and/or groundwater
contamination is suspected, construction/demolition in the area should cease and
appropriate health and safety procedures should be implemented. If it is
determined that contaminated soil and/or groundwater exist, the ND should
identify how any required investigation and/or remediation will be conducted, and
the appropriate government agency to provide regulatory oversight.
7) If weed abatement occurred, onsite soils may contain herbicide residue. If so,
proper investigation and remedial actions, if necessary, should be conducted at
the site prior to construction of the project.
8) If it is detemnined that hazardous wastes are, or will be, generated by the
proposed operations; the wastes must be managed in accordance with the
California Hazardous Waste Control Law (California Health and Safefy Code,
Division 20, Chapter 6.5) and the Hazardous Waste Control Regulations
(California Code of Regulations, Title 22, Division 4.5). If it is determined that
hazardous wastes will be generated, the facilify should also obtain a United
States Environmental Protection Agency Identification Number by contacting
(800) 618-6942. Certain hazardous waste treatment processes or hazardous
materials, handling, storage or uses may require authorization from the local
^5
Mr. Van Lynch
June 17, 2010
Page 4
Certified Unified Program Agency (CUPA). Information about the requirement for
authorization can be obtained by contacting your local CUPA.
9) DTSC can provide guidance for cleanup oversight through an Environmental
Oversight Agreement (EOA) for government agencies that are not responsible
parties, or a Voluntary Cleanup Agreement (VCA) for private pariiies. For
additional information on the EOA or VCA, please see
www.dtsc.ca.gov/SiteCleanup/Brownfields, or contact Ms. Maryam Tasnif-
Abbasi, DTSC's Voluntary Cleanup Coordinator, at (714) 484-5489.
If you have any questions regarding this letter, please contact me at (714) 484-5472 or
at "ashami(gDTSC.ca.gov".
AlyShami
Project Manager
Brownfieids and Environmental Restoration Program - Cypress
cc: Governor's Office of Planning and Research
State Clearinghouse
P.O. Box 3044
Sacramento, California 95812-3044
CEQA Tracking Center
Department of Toxic Substances Control
Office of Environmental Planning and Analysis
1001 I Street, 22nd Floor, M.S. 22-2
Sacramento, California 95814
ADelacrl (@dtsc.ca.gov
CEQA #2946
CONSISTENCY DETERMINATION
MCCLELLAN-PALOMAR AIRPORT
AIRPORT LAND USE COMPATIBILITY PLAN (ALUCP)
JULY 1,2010
Item # 6 Resolution # 2010-0038 ALUC
Recommendatjon: Conditionally Consistent
GENERAL PLAN AMENDMENT AND ZONE RECLASSIFICATION TO
CONSTRUCT A COMMUNITY SHOPPING CENTER AT 6111 EL CAMINO
REAL AT PALOMAR AIRPORT ROAD, CITY OF CARLSBAD
Descriptfon of Proiect: Based on plans submitted to the ALUC, the project
proposes a general plan amerximent and zone reclassification to construct a
retail communify shopping center. The center is proposed to contain a home
improvement store, gas statiorVconvenience market and carwash, bank, retail
sales building, and eating/drinking establishments. The total area of all uses
would be 186,044 square feet on a properfy of 16.99 acres which contains an
existing animal shelter which is to remain.
Noise Contours: The gas station/convenience market and car wash, bank, retail
sales, and eating/drinking establishment buildings would be located within the
65-70 and 70-75 decibel Communify Noise Equivalent Level (dB CNEL) noise
contours. The ALUCP identifies retail sales and personal services uses located
within the 65-70 and 70-75 dB CNEL noise contours as conditionally compatible
with airport uses, provided that the buildings are sound attenuated to 50 dB
CNEL interior noise level.
More than 75 percent of the home improvement store would be located within the
60-65 dB CNEL noise contour, and the ALUCP identifies retail sales and
personal services uses located within the 60-65 dB CNEL noise contour as
compatible with airport uses. The ALUCP provides that when a proposed
building lies within more than a single noise contour, the 5 dB range within which
75 percent or more ofthe building is located shall apply for determining noise
compatibillfy.
Additionally, the ALUCP requires that an avigation easement for aircraft noise
and height be recorded with the Counfy Recorder. Because the Counfy of San
Diego Is the owner ofthe properfy and an easement cannot be self-granted, a
covenant of easement to future lessees ofthe properfy would satisfy the ALUCP
requirement.
Q0027
Airspace Protection Surfaces: The maximum height ofthe proposed project
structures will be 45 feet above ground level. Because of the project proximify to
the airport, this height exceeds an airspace threshold which would requiris an
obstruction evaluation from the Federal Aviation Administration (FAA). A request
for obstruction evaluatton has been submitted to the FAA. The project would be
conditionally compatible, subject to securing an FAA detemnination of no hazard
to air navigation and resulting in no changes to airport operations.
Safety Zones: The properfy ofthe proposed project is located within Safefy
Zones 1, 2, 3, and 4. Based upon infomiation submitted with the project
application, jurisdiction paridng space requirements and assumed vehicle
occupancies were used to calculate the people per acre (people/ac) in each
safety zone. The ALUCP permits the use of this methodology as a determinant
of people/ac.
No structures would be located within Safefy Zone 1; only surface paridng
spaces are proposed, a perrinlssible use within the runway protection zone per
the ALUCP and FAA Advisory Circular 150/5300-13 CHG 11.
The gas station/convenience market and carwash, bank, and retail sales
building would be located wrthin Safefy Zone 2. The ALUCP identifies a
maximum allowance of 70 people/ac within Safefy Zone 2, and calculations with
the application Indicate a maximum of 67 p/ac would be located within Safefy
Zone 2.
The eating/drinking establishments and most of the home improvement store
would be located within Safefy Zone 3, and the ALUCP allows a maximum of 130
peopte/ac within Safefy Zone 3. The cateulations provided with the application
indicate a maximum of 107 people/ac would be located within Safefy Zone 3.
A portion of the home Improvement store would be boated within Safefy Zone 4,
and the ALUCP has a maximum of 130 people/ac allowed v/ithin Safefy Zone 4.
The calculations provided indicate a maximum of 76 people located within Safefy
Zone 4.
The project would therefore be considered conditionaily compatible with airport
uses, provided that site occupancy is limited by deed restriction recorded with the
County Recorder to the applicable, maximum number of people/ac respective to
each safefy zone.
Ownership: The properfy is owned by the Counfy of San Dlego. The lessee is
Sudberry Development of San Diego. The planning consultant is Hofman
Planning & Engineering of Carisbad. The architect is Andrew Hull Stevenson of
San Diego. The engineer is Adams Engineering of Carisbad.
coo028
Recommendation: Based on review ofthe materials submitted In connectbn
with the proposed project and the policies In the McClellan-Pabmar Airport
ALUCP adopted on January 25,2010 and amended on March 4, 2010, staff
recommends that the ALUC make the detemiination that the project is
conditionally consistent with the McClellan-Palomar Airport ALUCP.
Conditions: 1) Sound attenuation to an interior noise level of 50 dB CNEL in the
convenience martlet, bank, retail sales building, and eating/drinking
establishments. 2) Recordation of a covenant of avigation easement to the
airport operator with the Counfy Recorder for future lessees of the properfy. 3)
Security of a detemnination of no hazard to air navigation from the FAA which
does not change airport operations. 4) Recordation of deed restricttons Ibr site
occupancy with the County Recorder fbr the maximum number of people/ac for
each safefy zone.
C00029
Legend
— majorrds
roads
2010 Noise Contours
dB CNEL
J 60-65
65-70
•170-75 6111 El Camino Real @ Paiomar Airport Road
(APN: 760-221-15)
iMIIes
0 0.05 0.1
N
6111 El Camino Real @ Palomar Airport Road
(APN: 760-221-15)
iMiles
0 0.05 0.1
N
RESOLUTION NO. 2010-0038 ALUC
A RESOLUTION OF THE BOARD OF THE SAN
DIEGO COUNTY REGIONAL AIRPORT AUTHORITY
MAKING A DETERMINATION THAT THE
PROPOSED PROJECT: GENERAL PLAN
AMENDMENT AND ZONE RECLASSIFICATION TO
CONSTRUCT A COMMUNITY SHOPPING CENTER
AT 6111 EL CAMINO REAL AT PALOMAR AIRPORT
ROAD, CITY OF CARLSBAD, IS CONDITIONALLY
CONSISTENT WITH THE MCCLELLAN-PALOMAR
AIRPORT - AIRPORT LAND USE COMPATIBILITY
PLAN.
WHEREAS, the Board ofthe San Diego Counfy Regional Airport
Authorify, acting In Its capacify as the Airport Land Use Commission (ALUC) for
San Diego Counfy, was requested by the CIfy of Carisbad to detennine the
consistency of a proposed development project: General Plan Amendment and
Zone Reclassification to Constmct a Communify Shopping Center at 6111 El
Camino Real at Palomar Airport Road, City of Carisbad, which is located within
the Airport Influence Area (AIA) for the McClellan-Palomar Airport - Airport Land
Use Compatibility Plan (ALUCP), adopted on January 25, 2010, and amended on
Mart;h 4,2010, and
WHEREAS, the plans submitted to the ALUC for the proposed project
indicate that it would Involve a general plan amendment and zone reclassification
to construct a retail community shopping center consisting of a home
improvement store, gas station/convenience market and carwash, bank, retail
sales building, and eating/drinking establishments; and
WHEREAS, the proposed gas station/convenience mari<et and car wash,
bank, retail sales, and eating/drinking establishment buildings vi/ould be located
within the 65-70 and 70-75 decibel Community Noise Equivalent Level (dB
CNEL) noise contours, and the ALUCP identifies retail sales and personal
services uses located within the 65-70 and 70-75 dB CNEL noise contours as
conditionally compatible with airport uses, provided that the buildings are sound
attenuated to 50 dB CNEL Interior noise level, and that a covenant of avigation
easement for aircraft noise and height is recorded with the County Recorder as
notice to future lessees ofthe property; and
WHEREAS, more than 75 percent of the home improvement store would
be located within the 60-65 dB CNEL noise contour, and the ALUCP identifies
retail sales and personal services uses located within the 60-65 dB CNEL noise
contour as compatible with airport uses; and
C0G032
Resolution No. 2010-0038 ALUC
Page 2 of 3
WHEREAS, the proposed project is located in such proximity to the airport
that It exceeds an airspace threshold which would require an obstruction
evaluatton from the Federal Aviation Administration (FAA), and the project must
secure a detemnination of no hazard to air navigation from the FAA which would
result in no changes to airport operations; and
WHEREAS, the proposed project Is located v\nthin Safety Zones 1, 2, 3,
and 4, and, while no structures would be located within Safety Zone 1, the gas
station/convenience maricet and carwash, bank, and retail sales buikilngs would
be located within Safety Zone 2, vt^ich allows a maximum of 70 people per acre;
and the eating/drinking establishments and most ofthe home Improvement store
would be located within Safety Zone 3, which allows a maximum of 130 people
per acre; and a portion of the home improvement store would be located within
Safety Zone 4, which allows a maximum of 130 people per acre; and the project
would be considered conditionally compatible, proN^ded a deed restriction is
recorded with the County Recorder to limit site occupancy to the applicable
maximum numbers of people per acre respective to each safety zone; and
WHEREAS, the Board has considered the Information provided by staff,
including infonnation in the staff report and other relevant material regarding the
project; and
WHEREAS, the Board has provided an opportunity for the City of
Carisbad, and Interested members ofthe public to present information regarding
this matter.
NOW, THEREFORE, BE IT RESOLVED that tiie Board, acting as ttie
ALUC for San Diego County, pursuant to Section 21670.3 ofthe Public Utilities
Code, detennines that the proposed project: General Plan Amendment and
Zone Reclassification to Constiiict a Community Shopping Center at 6111 El
Camino Real at Palomar Airport Road, City of Carisbad, is conditionally
consistent witti the McClellan-Palomar Airport ALUCP, which was adopted on
January 25,2010, and amended on March 4, 2010, based upon the following
facts and findings:
(1) The proposed project Involves a general plan amendment and zone .
reclassification to construct a retail community shopping center consisting of a
home improvement store, gas station/convenience market and carwash,
bank, retail sales building, and eating/drinking establishments.
C00033
o
Resolution No. 2010-0038 ALUC
Page 3 of 3
(2) The gas station/convenience market and car wash, bank, retail sales, and
eating/drinking establishment buildings ofthe proposed project would be
located within the 65-70 and 70-75 dB CNEL noise contours. The ALUCP
identifies retail sales and personal services uses located within the 65-70 and
70-75 dB CNEL noise contours as conditionally compatible with airport uses,
provided that the buildings are sound attenuated to 50 dB CNEL interior noise
level. Therefore, as a condition of project approval, the convenience maricet,
bank, retail sales, and eating/drinking establishment buildings ofthe project
must be sound attenuated to the 50 dB CNEL Interior noise level. More than
75 percent ofthe home improvement store would be located within the 60-65
dB CNEL noise contour. The ALUCP identifies retail sales and personal
services uses located v\nthin tiie 60-65 dB CNEL noise contour as compatible
with airport uses.
(3) The ALUCP requires that an avigation easement for aircraft noise and height
be recorded with the County Recorder for land uses for which sound
attenuation Is required. As the County of San Dlego is the owner of the
property and cannot grant an easement to itself, a covenant of avigation
easement as notice to future lessees of the property would satisfy this
requirement. Therefore, as a condition of project approval, a covenant of
avigation easement for aircraft noise and height as notice to future lessees of
the properfy must be recorded for the properfy with the Counfy Recorder.
(4) The proposed project is located in such proximify to the airport that it exceeds
an airspace threshold which would require an obstnjction evaluation from the
FAA. Therefore, as a condition of project approval, the project must secure a
detennination of no hazard to air navigation from the FAA which would result
in no changes to airport operations.
(5) The properfy ofthe proposed project is located witiiin Safefy Zones 1, 2, 3,
and 4. No structures would be located within Safefy Zone 1. The gas
statton/convenience maricet and car wash, bank, and retail sales buildings
would be located within Safefy Zone 2, which allows a maximum of 70 people
per acre. The eating/drinking establishments and most ofthe home
improvement store would be tocated within Safefy Zone 3, which allows a
maximum of 130 people per acre. A portion ofthe home improvement store
would be located witiiin Safefy Zone 4, which allows a maximum of 130
people per acre. The project would be considered conditionally compatible if
these people per acre limitations of the ALUCP safefy zones are codified.
Therefore, as a condition of project approval, a deed restriction must be
recorded with the Counfy Recorder to limit site occupancy to the applicable
maximum numbers of people per acre respective to each safety zone.
C00034
Q
Resolution No. 2010-0038 ALUC
Page 4 of 3
(6) Therefore, if the proposed project contains the above-required conditions, the
proposed project would be consistent with the McClellan-Palomar Airport
ALUCP.
BE IT FUTHER RESOLVED tfiat this Boanl actton Is not a "project" as
defined by the Califomia Environmental Qualify Act (CEQA), Pub. Res. Code
Section 21065, and is not a "development" as defined by tiie Califomia Coastal
Act, Pub. Res. Code Section 30106.
PASSED, ADOPTED AND APPROVED by ttie Boartl of ttie San Diego
Counfy Regional Airport Authorify at a regular meeting this 1^ day of July, 2010,
by the foltowing vote:
AYES: Board Members:
NOES: BoartJ Members:
ABSENT: Board Members:
APPROVED AS TO FORM:
BRETON K. LOBNER
GENERAL COUNSEL
ATTEST:
TONY R. RUSSELL
DIRECTOR, CORPORATE SERVICES/
AUTHORITY CLERK
C00035
:(WN" SAN DIEGO CCWNTY
REGIONAL AIRPORT AUTHORITY
P.O. BOX 82776. SAN DIEGO. CA 92138-2776
619.400.2400 WWW.SAN.ORG
June 24, 2010
Mr. Van Lynch
City of Carisbad
1635 Faraday Avenue
Carisbad, CA 92008
Re: Airport Land Use Commission Determination
General Plan Amendment and Zone Reclassification to construction a community
shopping center at 6111 El Camino Real at Palomar Airport Road, City of Carisbad;
APN 213-020-18 (760-221-015)
Dear Mr. Lynch:
As the Airport Land Use Commission (ALUC) for San Diego County, the San Diego County
Regional Airport Authority acknowledges receipt of an application for a determination of
consistency for the project described above. This project is located within the Airport Influence
Area (AIA) for the McClellan-Palomar Airport ~ Airport Land Use Compatibility Plan (ALUCP).
ALUC staff has reviewed your application and accompanying materials and has determined that it
meets our requirements to complete a consistency determination. ALUC staff will proceed with
review of the project and report its findings to the Airport Authority Board, acting as the ALUC, to
issue a determination of consistency with the ALUCP within 60 days of the date of this letter. You
will receive notice of the Airport Authority Board hearing which will consider your project.
If you have any questions, please contact me at (619) 400-2244 or egowens@san.org.
Sincerely,
Ed Gowens
Land Use Planner
Airport Planning
cc: Amy Gonzalez, SDCRAA, Director, Counsel Services
Terry Barrie, Caltrans, Division of Aeronautics
Chris Schmidt, Caltrans, Division 11
SAN DIEGO
INTERNATIONAL
AIRPORT
SAN DIEGO COUNTV
REGIONAL AIRPORT AUTHORITY
AIRPORT LAND USE COMMISSION (ALUC)
NOTICE OF PUBLIC HEARING
PROJECT/LOCATION:
San Diego County Regional Airport Authority; Airport Land Use Commission
Determination - 6111 El Camino Real at Palomar Airport Road; City of Carlsbad;
General Plan Amendment and Zone Reclassification to construction a community shopping
center; APN 213-020-18 (AKA 760-221-015); McClellan-Palomar Airport-Airport Land
Use Compatibility Plan
LOCAL JURISDICTION:
City of Carlsbad
Mr. Van Lyncli
1635 Faraday Avenue
Carlsbad, CA 92008
(760) 602-4613
A public hearing on the above referenced project will be held by the San Diego County Regional
Airport Authority, acting in its capacity as the Airport Land Use Commission (ALUC) for the
County of San Diego, on July 1,2010. The ALUC will follow the conclusion of the Airport
Authority Board meeting, which begins at 9:00 am. The hearing will be held in the Commuter
Terminal, 3rd Floor, 3225 N. Harbor Drive, San Diego, Califomia 92101. Please check Authority
web site for any possible changes to dates and times of meetings.
Persons are invited to attend the public hearing and provide oral or written comments regarding the
project. The project will be described and a staff recommendation will be given. Copies of the
agenda, staff report, and draft resolution will be available on SDCRAA's web site no later than
Monday, June 29. http://wvyw.san.org/sdcraa/leadership/staff reports.aspx?tvpe=aluc.
If you have any questions please contact Ed Gowens, SDCRAA, Airport Planner (619) 400-2244
or egowens(a),san.org.
Department of Toxic Substances Control
Maziar Movassaghi
Acting Director
Linda S. Adams 5795 Corporate Avenue Arnold Schwarzenegger
Secretary for Cypress, California 90630 Governor
Environmental Protection
June 17, 2010
CITY OF CARLSBAD
JON 1 8 Z0!0
Community & Economic
Development Department Mr. Van Lynch
Cify of Carisbad Planning Division
1635 Faraday Avenue
Carisbad, California 92008
DRAFT MITIGATED NEGATIVE DECLARATION (ND) FOR PALOMAR COMMONS
(SCH# 2010051074)
Dear Mr. Lynch:
The Department of Toxic Substances Control (DTSC) has received your submitted
document for the above-mentioned project. As stated in your document: "A request for
a General Plan Amendment, Zone Change, Site Development Plan, Special Use
Permit, four Conditional Use Permits, and a Variance to allow the development of a
185,246 square foot retail commercial center on 16.55 acres located at the southwest
corner of Palomar Airport Road and El Camino Real. The General Plan Amendment will
create new text and Land Use designation of General Commercial and change the
existing land use from Travel Recreation/Commercial (T-R) and a portion (.87 ac) of
Planned Industrial (PI) to General Commercial (GC). A Zone Change from Commercial
Tourist- Qualified development overly (C-T-Q) and Planned Industrial (PM) (.87 ac) to
General Commercial (C-2-Q) will implement the new land use designations. The Special
Use Permit is for the development adjacent to the El Camino Real Scenic Corridor. The
Conditional Use Permits will allow gas station/carwash, drive thru facilities for the bank,
and a modification ofthe entrance to the adjacent San Diego County Animal Control
facility. The variance is for the modification ofthe overall and individual sign area and
letter height allowance for the home improvement store. The project will modify the
entrance to the San Diego County Animal Shelter, add a new signalized intersection on
Palomar Airport Road, close the existing left turn lane onto the project site on
Northbound El Camino Real, and add new deceleration lanes for project entrances on
Palomar Airport Road at the El Camino Real. The project will also modify the
northbound left turn lane on El Camino Real to Palomar Airport Road to provide dual left
turn lanes at the intersection and construct a separate eastbound right turn lane only
lane on Palomar Airport Road at the El Camino Real intersection. The project will
require grading with an import of soil material. The project site was formerly developed
® Printed on Recycled Paper
Mr. Van Lynch
June 17, 2010
Page 2
as the Olympic Resort and Spa, which included an 80 room hotel, restaurant, health
club, spa, conference center, parking lot, tennis courts and a golf driving range".
Based on the review of the submitted document DTSC has the following comments:
1) The ND should identify and determine whether current or historic uses at the
project area may have resulted in any release of hazardous wastes/substances.
2) The document states that the ND would identify any known or potentially
contaminated sites within the proposed project area. For all identified sites, the
ND should evaluate whether conditions at the site may pose a threat to human
health or the environment. Following are the databases of some of the
regulatory agencies:
• National Priorities List (NPL): A list maintained by the United States
Environmental Protection Agency (U.S.EPA).
EnviroStor, a database primarily used by the California Department of
Toxic Substances Control, at www. Envirostor.dtsc.ca.gov.
Resource Conservation and Recovery Information System (RCRIS):
A database of RCRA facilities that is maintained by U.S. EPA.
Comprehensive Environmental Response Compensation and Liabilify
Information System (CERCLIS): A database of CERCLA sites that is
maintained by U.S.EPA.
• Solid Waste Information System (SWIS): A database provided by the
California Integrated Waste Management Board which consists of both
open as well as closed and inactive solid waste disposal facilities and
transfer stations.
• GeoTracker: A List that is maintained by Regional Water Quality Control
Boards.
• Local Counties and Cities maintain lists for hazardous substances cleanup
sites and leaking underground storage tanks.
• The United States Army Corps of Engineers, 911 Wilshire Boulevard,
Los Angeles, California, 90017, (213) 452-3908, maintains a list of
Formerly Used Defense Sites (FUDS).
3) The ND should identify the mechanism to initiate any required investigation
Mr. Van Lynch
June 17, 2010
Page 3
and/or remediation for any site that may be contaminated, and the government
agency to provide appropriate regulatory oversight. If hazardous materials or
wastes were stored at the site, an environmental assessment should be
conducted to determine if a release has occurred. If so, further studies should be
carried out to delineate the nature and extent ofthe contamination, and the
potential threat to public health and/or the environment should be evaluated. It
may be necessary to determine if an expedited response action is required to
reduce existing or potential threats to public health or the environment. If no
immediate threat exists, the final remedy should be implemented in compliance
with state laws, regulations and policies.
4) The project construction may require soil excavation and soil filling in certain
areas. Appropriate sampling is required prior to disposal ofthe excavated soil.
Ifthe soil is contaminated, properly dispose of it rather than placing it in another
location. Land Disposal Restrictions (LDRs) may be applicable to these soils.
Also, if the project proposes to import soil to backfill the areas excavated, proper
sampling should be conducted to make sure that the imported soil is free of
contamination.
5) Human health and the environment of sensitive receptors should be protected
during the construction or demolition activities. A study ofthe site overseen by
the appropriate government agency might have to be conducted to determine if
there are, have been, or will be, any releases of hazardous materials that may
pose a risk to human health or the environment.
6) If during construction/demolition of the project, soil and/or groundwater
contamination is suspected, construction/demolition in the area should cease and
appropriate health and safety procedures should be implemented. If it is
determined that contaminated soil and/or groundwater exist, the ND should
identify how any required investigation and/or remediation will be conducted, and
the appropriate government agency to provide regulatory oversight.
7) If weed abatement occurred, onsite soils may contain herbicide residue. If so,
proper investigation and remedial actions, if necessary, should be conducted at
the site prior to construction of the project.
8) If it is determined that hazardous wastes are, or will be, generated by the
proposed operations, the wastes must be managed in accordance with the
California Hazardous Waste Control Law (California Health and Safefy Code,
Division 20, Chapter 6.5) and the Hazardous Waste Control Regulations
(California Code of Regulations, Title 22, Division 4.5). If it is determined that
hazardous wastes will be generated, the facilify should also obtain a United
States Environmental Protection Agency Identification Number by contacting
(800) 618-6942. Certain hazardous waste treatment processes or hazardous
materials, handling, storage or uses may require authorization from the local
Mr. Van Lynch
June 17, 2010
Page 4
Certified Unified Program Agency (CUPA). Information about the requirement for
authorization can be obtained by contacting your local CUPA.
9) DTSC can provide guidance for cleanup oversight through an Environmental
Oversight Agreement (EOA) for government agencies that are not responsible
parties, or a Voluntary Cleanup Agreement (VCA) for private parties. For
additional information on the EOA or VCA, please see
www.dtsc.ca.gov/SiteCleanup/Brownfields, or contact Ms. Maryam Tasnif-
Abbasi, DTSC's Voluntary Cleanup Coordinator, at (714) 484-5489.
If you have any questions regarding this letter, please contact me at (714) 484-5472 or
at "ashami(gDTSC.ca.gov".
Since
AlyShami
Project Manager
Brownfieids and Environmental Restoration Program - Cypress
cc: Governor's Office of Planning and Research
State Clearinghouse
P.O. Box 3044
Sacramento, California 95812-3044
CEQA Tracking Center
Department of Toxic Substances Control
Office of Environmental Planning and Analysis
1001 I Street, 22nd Floor, M.S. 22-2
Sacramento, California 95814
ADelacrl @dtsc.ca.qov
CEQA #2946
«t^>c,.o. ^ ^ FILE COFI
VICARLSBAD
Planning Department www.carisbadca.gov
June 15, 2010
Hofman Planning & Engineering
Attn: Eric Munoz
3152 Lionshead Avenue
Carlsbad, CA 92010
SUBJECT: GPA 04-03/GPA 09-07/ZC G9-08/SDP 09-05/SUP 09-08/CUP 03-21 (A)/CUP 09-
07/CUP 10-05/V 10-01 - PALOMAR COMMONS
The preliminary staff report for the above referenced project will be sent to you via email on
Wednesday, June 23, 2010, after 8:00 a.m. This preliminary report will be discussed by staff at the
Development Coordinating Committee (DCC) meeting which will be held on June 28, 2010. A twenty
(20) minute appointment has been set aside for you at 9:30 AM. If you have any questions concerning
your project you should attend the DCC meeting.
It is necessary that you bring the following required information with you to this meeting or
provide it to your planner prior to the meeting in order for your project to go forward to the
Planning Commission:
1. Unmounted colored exhibit(s) of your site plan and elevations
2. A PDF of your colored site plan and elevations
The colored exhibits must be submitted at this time to ensure review by the Planning
Commission at their briefings. If the colored exhibits are not available for their review, vour
proiect could be rescheduled to a later time. The PDF of your colored site plan and elevations
will be used in the presentation to the Planning Commission and the public at the Planning
Commission Hearing. If you do not plan to attend this meeting, please make arrangements to
have your colored exhibit(s) and the PDF here by the scheduled time above.
Should you wish to use visual materials in your presentation to the Planning Commission, they should
be submitted to the Planning Department no later than 12:00 p.m. on the day of a Regular Planning
Commission Meeting. Digital materials will be placed on a computer in Council Chambers for public
presentations. Please label all materials with the agenda item number you are representing. Items
submitted for viewing, including presentations/digital materials, will be included in the time limit
maximum for speakers. All materials exhibited to the Planning Commission during the meeting (slides,
maps, photos, etc.) are part of the public record and must be l<ept by the Planning Department for at
least 60 days after final action on the matter. Your materials will be returned upon written request.
If you need additional information concerning this matter, please contact your Planner, Van Lynch at
(760) 602-4613.
DON NEU
Planning Director
DN^:sm
c: pari.m.holliday(glowes.com; anne.pauKgsdcounty.ca.gov; mark@sudprop.com;
bryan.elliott@kslcapital.com
File Copy
Steve Bobbett, Project Engineer
1635 Faraday Avenue, Carlsbad, CA 92008-7314 1(760) 502-4600 F (760) 602-8559 ®
^^^^^^
BLUE CONSULTING GROUP
BIOLOGY - LAND LPSE &. •• EiMxixi_Er*/iENxs xs I
June 7, 2010
Mark K. Radelow
SUDBERRY PROPERTIES, INC.
5465 Morehouse Drive, Suite 260
San Diego, CA 92121
Re: Palomar Commons, Historic Blue Une History
Mr. Radelow,
As requested, I have prepared a general history and timeline relative to the occurrence of a blue line
stream onsite as observed through a series of historic aerials. The aerials utilized are from 1953, 1964,
1980,1990 and 2008 (attached). These show that the USGS blue line identified in the area was initiated
within active agriculture fields (likely artificially created from irrigation runoff and erosion). This natural
topographic cleft extended approximately 1,500 feet to the west until it opened up and began to sheet
flowed into the unimproved El Camino Real (east ofthe property).
Due to extensive grading and maintenance of the onsite developed facility, inclusive of piping storm
flows, no onsite remnant bed and bank of this historic blue line occurs. Furthermore, due to the
extensive development to the east of the property and the removal of agriculture whose irrigation likely
contributed a majority if not all of the non storm event flows. This has consequently reduced the flow
coming onto the Palomar Commons property which allows any water to sheet flow through the area (as
ultimately designed and graded to do) as opposed to having so much flow that a natural cut bed and
bank is eroded into place.
Aerial #1-1953
Onsite - Undeveloped. No clear incised channel connection picking up the flows from the agriculture
on the east side of El Camino Real. Appears to have power poles running N-S through the
area.
Offsite - To the east side of El Camino Real is active agriculture (cleared land) and the head of the
historic blue line in the area, extending approximately 1,500 feet to the east. As seen in a
comparison of the aerial and the 1975 USGS topography maps it can be seen that the
channelization ofthe irrigation flows were following a natural topographic cleft that, in 1953,
was marginally farmed over, but not completely removed. As the agriculture irrigation flows
within the visible cut channel (historic blue line) approached the old El Camino Real, they
dissipated and began to sheet flow to the intersection with the street.
H P.O. Box 501115 SAN DIEGO, CA 92150 8858.391.8145 HMIKE@BLUECONSULTINC.COM
-2-
A 2 lane El Camino Real is present in generally the same position; no Palomar Airport Road
to the north of the property.
Aerial #2 -1964
Onsite - Undeveloped. No clear incised channel connection picking up the flows from the agriculture
on the east side of El Camino Real. Appears to have power poles running N-S through the
area. Buena Sanitation approved sewer line through the property.
Offsite - To the east side of El Camino Real is active agriculture (cleared land). The intensity of the
farming has been increased since 1953 and the natural topography has been significantly
altered. The previously occurring channel is filled over and is no longer distinguishable from
the agriculture fields. No sheet flow or erosion is visible either. Palomar Airport Road is
developed north ofthe property.
Aerial #3 -1980
Onsite - Undeveloped. No clear incised channel connection picking up the flows from the agriculture
on the east side of El Camino Real. The Buena Sanitation sewer line has been installed across
the property, traversing N-S.
offsite - To the east side of El Camino Real is active agriculture (cleared land). The intensity of the
farming has again increased since 1964 and the natural topography has been significantly
altered, again. The previously occurring channel is filled over and is no longer distinguishable
from the agriculture fields. Palomar Airport Road and El Camino Real have been improved.
The Palomar Airport property to the north has been graded as well as the portion of the final
build-out to the south.
1983 - Onsite. The Olympic Resort is approved and built out over the entire parcel, inclusive of the
area indicated as supporting the historic blue line. A review ofthe documentation prepared
for the approval of this development does not account for an impact to an existing 'blue line'.
The entire property was graded and no soft bottom bed and bank was created to convey
storm water flows. A combination of a 36 inch storm drain pipe and a 24 inch concrete
drainage swale was to be installed to covey the storm water flows from the El Camino Real
side ofthe property to the south west property boundary.
Aerial #4 -1990
Onsite - Fully graded, developed and maintained recreational resort facility. As such, no visible bed
and bank channel or hydrophytic vegetation is onsite.
offsite - To the east side of El Camino Real is active agriculture (cleared land). The intensity of the
farming has again increased since 1983 and the natural topography has been significantly
altered, again. The previously filled in topographic cleft which supported the channel is not
H P.O. Box 501115 SAN DIEGO, CA 92150 2858.391.8145 H MiKE(a)BLUEcoNSULTiNC.coM
-3-
distinguishable from the agriculture fields. Palomar Airport Road and El Camino Real have
been improved, again.
If you have any questions, please feel free to call me.
Sincerely,
Michael K. Jefferson
President
BLUE Consulting Group
S P.O. Box 501115 SAN DIEGO, CA 92150 S858.391.8145 B MIKE(5)BLUECONSULTING.COM
-3-
ATTACHMENTS
Historic aerials
Site photographs
USGS topographic map
H P.O. Box 501115 SAN DIEGO, CA 92150 2858.391.8145 H MIKECSBLUECONSULTING.COM
1953
#1
1990
#4
|]_^ I Proposed Project Footprint A/ Buena Sanitation Sewer Easement - approved, 1964 Historic
Property Aerials
I I Proposed Project Footprint A/ Buena Sanitation Sewer Easement - approved, 1964 Aerial # 1
1953
I j Proposed Project Footprint Buena Sanitation Sewer Easement - approved, 1964 Aerial #2
1964
o
I I Proposed Project Footprint A/ Buena Sanitation Sewer Easement - approved, 1964 Aerial #3
1980
I I Proposed Project Footprint Buena Sanitation Sewer Easement - approved, 1964 Aerial #4
1990
I j Project Footprint
Historic Topo Historic Blue Line (USGS, 1975)
Property Aerial
2008
Photograph 2 Looking south as the sheet flows disipate across the property.
A C 0 FILE copy
CITY OF
V (CARLSBAD
Planning Department www.carisbadca.gov
June 3, 2010
Hofman Planning & Engineering
3152 Lionshead Avenue
Carlsbad, CA 92010
SUBJECT: PALOMAR COMMONS - GPA 04-03/GPA 09-07/ZC 09-08/SDP 09-05/CUP 03-
21(A)/CUP 09-07/CUP 10-05/SUP 09-08A/ 10-01 - CALIFORNIA
ENVIRONMENTAL QUALITY ACT (CEQA) APPLICABIUTY/PROCESS
DETERMINATION
This is to advise you that after reviewing the application for the project referenced above, the
City has determined that the following environmental review process (pursuant to CEQA) will be
required for the project:
^ The project is subject to the provisions of CEQA. Based on the City's analysis of the -
proposed project, the following CEQA documentation/process is required for the project
(fees effective January 1, 2009):
• A NEGATIVE DECLARATION (ND) will be prepared for the project pursuant to
the provisions of CEQA. Please submit the Environmental Impact Assessment
Fee of $1604.00 ($883.00 single family lot) for the continued processing of the
CEQA documentation.
lEI A MITIGATED NEGATIVE DECLARATION (MND) will be prepared for the
project pursuant to the provisions of CEQA. Please submit the Environmental
Impact Assessment Fee of $1604.00 ($883.00 single family lot) for the continued
processing ofthe CEQA documentation.
• An ENVIRONMENTAL IMPACT REPORT (EIR) is required to analyze the
project's environmental effects. Please submit the Environmental Impact Report
Base Fee of $18,619.00 for the continued processing of the CEQA
documentation. In addition, a fully burdened hourly rate will be assessed after
the first 160 hours charged by the assigned project planner or after the first 40
hours charged by the assigned project engineer.
For additional information related to this CEQA applicability/process determination, please
contact the project planner. Van Lynch, at (760) 602-4613 or van.lynch@carisbadca.gov.
Sincerely
DON NEU
Planning Director
DN:VLsm
c: County of San Diego, Department of Public Works, Airports, 1960 Joe Crossen Drive, El Cajon, CA 92020-1236
Chris DeCerbo, Team Leader
File Copy
Data Entry
1635 Faraday Avenue, Carlsbad, CA 92008-7314 T (760) 602-4600 F (760) 602-8559 ®
Van Lynch
From: Trent Clark [trent_clark(gdot.ca.gov]
Sent: Wednesday, June 02, 2010 12:44 PM
To: Van Lynch
Subject: Re: FW: Palomar Airport Commons
Thank you very much for getting that to me. Doesn't look as if there are any inpacts.
Trent Clark
Caltrans District 11
4050 Taylor Street ; I^S-240
San Diego, CA 92110
Office: (619) 688-3140
CITY OF
V CARLSBAD
Planning Department www.carisbadca.gov
Tuesday, June 02, 2010
San Diego County Regional Airport Authority
Attn: Kim Sheredy
PO Box 82776
San Diego, CA 92138-2776
RE: GPA 09-07 - PALOMAR COMMONS
Dear Ms. Sheredy,
Please find enclosed the application for Determination of Consistency with the McClellan
Palomar Airport Land Use Plan.
The Palomar Commons project involves a land use change from Travel /Recreation Commercial
to General Commercial and the construction and operation of an 186,044-square-foot
commercial center on 16.99 acres of land located on the southwest corner of Palomar Airport
Road and El Camino Real. The project features a home improvement store, gas station and car
wash, bank, and four retail shop buildings.
As you are aware, this application does not contain the Part 77 determination. The application
has been submitted to the FAA and will be provided to you as soon as possible.
In addition to the application submittal requirements, the city has provided the draft staff report
for the project which discusses the project in detail and provides information on parking and
ALUCP compliance. Also attached are excerpts of our Municipal Code for parking. The City
has determined that the individual parking rate of 1/300 for the home improvement store is
adequate and appropriate for the project. The remainder of the project is parked at the
shopping center rate of 1/200. Additional information on parking also suggests that home
improvements stores do not generate the parking demand required of the project.
If you need any additional information, please feel free to contact me at (760) 602-4613 or by
email at van.lynch@carisabdca.gov.
Sincerely
VAISH-YNCH
Senior Planner
c: File
1635 Faraday Avenue, Carisbad, CA 92008-7314 T (760) 602-4600 F (760) 602-8559 ®
^ SANDIEGO COUNTYREGION^AIRPORTAUTHORITY
Airport Land Use Commission • P. O. Box 82776 • San Diego, California 92138-2776
APPLICATION FOR DETERMINATION OF CONSISTENCY
Project Address: 6111 El Camino Real, Carlsbad, San Diego County, CA 92009
Assessor's Parcel Number(s): 213-020-18-00 (AKA 760-221-015)
Jurisdiction: Carlsbad Jurisdicdon Project Manager: Van Lynch
Address: 1635 Faraday Avenue, Carlsbad GA 92008
Telephone number: (760) 602-4613 Fax number: (760) 602-8559
Email address: van.lynch@carlsbadca.gov
Brief Project Description: A General Plan Land Use element amendment to create a new General Com-
mercial iand use designation and a Land Use amendment to change the existing Travel Recreation/Com-
mercial to General Commercial for a 186,044 sq ft commercial center on 16.88 acres.
Height of building(s) above grade: 45 ft Maximum feet above mean sea level: 327.5 Lot coverage: 25.3 %
Total square footage of building space: 186,044 Area of property in square feet: 735,292
Date project was deemed complete per Govemment Code: After 3/4/2010 Floor Area Ratio: see attached
Attach the following documents to this application:
(1) Property deed or title report listing current owner of record
(2) Assessor's parcel map page showing property
(3) FAR Part 77 determination of hazard (if applicable)
(4) Project site plans with floor plans and dimensioned elevations
The San Diego County Regional Airport Authority, acting in its capacity as the local Airport Land Use
Commission (ALUC), reserves its right to request additional infonnation and documents regarding any
proposed project submitted for a consistency determination. The submittal shall not be deemed complete by
the Authority until such time as all required documents and information, as determined by Authority staff,
have been submitted and reviewed for completeness.
Any determination rendered by the Authority is limited to the project plans and description
submitted with this application and is not transferable to any revision of this or any similar, future
project involving any change in the use, area, or height of structures as depicted and described
therein. Any changes in these project characteristics subsequent to Authority review but before
decision-making consideration by the local jurisdiction must be resubmitted via new application to
the Authority for a new determination of consistency.
As representative of the local jurisdiction named above, I hereby certify that I understand the foregoing
statements and fiirther that this application and attached documents constitute a true and correct statement of
facts to the best of my knowledge.
Project Manager Signature: ( yCP^/lMK Date: June 2, 2010
BELOW FOR STAFF USE ONLY
AIA AAOZ limit RPZ FAZ APZ zone
CNEL(dB): outside 60 60-65 65-70 70-75 75-80 80+ Max Elev AMSL
Latitude ° ' " North Longitude ° ' " West
FAA Notification Required? Y / N USMC Review Letter? Y / N
Print Form
0)Al^f> &l&£i/0
' €^1^ ^'TY OF ^
V CARLSBAD
Planning Department
FILE COPY VU
www.carisbadca.gov
May 24, 2010
Hofman Planning & Engineering
3152 Lionshead Avenue
Carlsbad, CA 92010
SUBJECT: GPA 04-03/GPA 09-07/ZC 09-08/SDP 09-05/SUP 09-08/CUP 03-21 (A)/
CUP 09-07/CUP 10-05/V 10-01 - PALOMAR COMMONS
Your application has been tentatively scheduled for a hearing by the Planning Commission on
July 7, 2010. However, for this to occur, you must submit the additional items listed below. If
the required items are not received by June 16, 2010, your project will be rescheduled for a
later hearing. In the event the scheduled hearing date is the last available date for the City to
comply with the Permit Streamlining Act, and the required items listed below have not been
submitted, the project will be scheduled for denial.
1. Please submit the following plans:
A) 10 copies of your site plans, landscape plans, building elevation plans, floor
plans on 24" x 36" sheets of paper, stapled in complete sets folded into 9" x
12" size.
B) One 8V2" X 11" copy of your reduced site plan, building elevation and floor
plans. These copies must be of a quality which is photographically
reproducible. Only essential data should be included on plans.
2. As required by Section 65091 of the California Govemment Code, please submit the
following information needed for noticing and sign the enclosed form:
A) 600' Owners List - a typewritten list of names and addresses of all property
owners within a 600 foot radius of the subject property, including the applicant
and/or owner. The list shall include the San Diego County Assessor's parcel
number from the latest equalized assessment rolls.
B) 100' Occupant List - (Coastal Development Permits Only) a typewritten list of
names and addresses of all occupants within a 100 foot radius of the subject
property, including the applicant and/or owner.
1635 Faraday Avenue, Carisbad, CA 92008-7314 1(760)602-4600 F (760) 602-8559 ®
I HEREBY CERTIFY THAT THE PROPERTY OWNERS LIST AND LABELS SUBMITTED TO
THE CITY OF CARLSBAD ON THIS DATE REPRESENT THE LATEST AVAILABLE
INFORMATION FROM THE EQUALIZED ASSESSOR'S ROLES.
APPLICATION NAME AND NUMBER
PALOMAR COMMONS - GPA 04-03/GPA 09-07/ZC 09-08/SDP 09-05/ SUP 09-08/CUP 09-
07/CUP 10-05/CUP 03-21 (AW 10-01
APPLICANT OR APPLICANT'S REPRESENTATIVE
BY:
DATE:
RECEIVED BY
DATE:
toy 4,2010
City of Carlsbad
|jj iin®®rifi>
Mark Radelow
Sudberry Deveiopment
5465 Morehouse Drive, Suite 260
San Diego. CA 92121
Re: Palomar Commons CUP 09-07, Traffic Management Center Mitigation
The Draft EIR for the Palomar Commons project includes a mitigation measure to improve the
Patomar Airport Road/El Camino Real intersection:
Modify the Palomar Airport Road/El Camino Real intersection to provide a closed circuit
TV (CCTV) camera and wireless iransreceiver to connect to the Traffic Management
Center at the Faraday Safety Center.
The TMC Pilot Project was recently funded to lest new tefecommunicalions technology to
irtiprove traffic flow through the City of Carlsbad. The city would ike to consider the Paiomar
Airport Road/El Camino Real intersection as the test site for a wireless link to the new Traffic
Management Center. The city would like to enter into a reimbursement agreement with
Sudberry Devetopment for the cost of equipment to be instailed at the intersection of Palomar
Airport Road and El Camino Real that comprises the mitigation measure identified in the Draft
EIR The agreement would not include the engineering and labor costs associated with this
project and would be contingent upon the project receiving discretionary approvals. The
equipment costs are not expected to exceed $15,000. Staff believes this cost sharing
agreement would benefit Sudberry Development by etimtnaling the uncertainties of scope of
work, engineering, equipment, and labor costs related to the existing mitigation measure.
The pilot program is on a fast track, so staff would need your answer by May 14, 2010. With
your consent, the city would proceed in good faith, with the understanding that the project would
be conditioned to enter into an agreement for reimbursement as part of the development review
process. If you have any specific questions, please contact Doug Bilse, Traffic Signal Systems
Engineer, at 760-602-7504,
Sincerety,
(Men K. Van Peski, P.E.
Senior Civil Engineer
C: Doug Bilse. Traffic Signal Systems Engineer
Steve Bobbett, Associate Engineer
Van Lynch, Senior Planner
>:,-Vv
Q
Hofman
Planning & Engineering
Planning Civil Engineering Fiscal Services Coastal
April 15, 2010
Don Neu
Planning Director
City of Carisbad
1635 Faraday Avenue
Carlsbad, CA 92008-7314
RE: 3'" SUBMITTAL: PALOMAR COMMONS
GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-07/SUP 09-08
Dear Mr. Neu:
The following responses correspond to the City's comment letter to the 2"^ review dated March
29, 2010. We have considered all of the comments, and have revised the project, exhibits and
related reports accordingly.
We have worked closely with all affected city staff to address the items noted in the city
comment letter, and have also worked to address project issues.
Thank you for the review and efforts by city staff and project planner Van Lynch; we look
fonward to bringing this project to public hearing as soon as possible.
Natalie Roderick, HPE
Associate Planner
3152 Lionshead Avenue • Carlsbad • CA 92010 • (760) 692-4100 • Fax: (760) 692-4105
LIST OF ITEMS NEEDED
Planning:
There are a number of technical studies and reports that have yet to be submitted
including:
Economic viability study (Market Study), and
LFMP Zone 5 analysis
Please submit these with your next resubmittal.
The LFMP Zone 5 analysis was provided to Van Lynch on Thursday April 8.
Two (2) Copies ofthe Economic Viability (Market Study) are provided with this submittal.
ISSUES OF CONCERN
Planning:
1. The office building height Is 37 feet tall which exceeds the allowed building height
of 35 feet. The building can either be lowered to comply with the 35 foot height
limit, or the project can increase all the required setbacks, including landscaping,
an additional two feet to accommodate the increase in building height.
Building height has been adjusted to meet the 35 foot height limit See Sheet A-13.
2. The building elevations of Pad A and B along the entry of the project shall be
enhanced with additional building materials (stone base) and added architectural
relief (arched building elements with color trim) to mirror the front building
elevations, including windows (real or faux). Blank walls shall include additional
building relief elements (right side of west elevation).
The driveway elevations for both buildings have been revised - see Sheets A-7 and A-
14. The revisions were agreed to in a meeting with Van Lynch and Chris DeCerbo on
4/8/10 at the City offices.
3. Does the number of parking spaces provided include parking spaces that have
been identified for cart or outdoor display storage?
The number of parking spaces provided does NOT include spaces that have been
identified for cart or display storage.
4. Please provide a cart storage facility for each of the Lowe's drive aisles.
Cart storage facilities have been provided for the Lowe's drive aisles: three additional
aisles now have cart storage space. The three additional aisles were identified during
meeting between Van Lynch and Eric Munoz, 4/13/10, as reflected on site plan-A-1.
5. The parking stalls which front along Palomar Airport Road in front of the Lowe's
building overhang into the sloped landscape area. This overhang conflicts with
the landscape screen planting. Please provide a greater flat area beyond the
parking space for overhang and to provide an area for the screen planting at the
same height as the parking stall. The slope may project down to but not encroach
c.
into the right of way. There is a portion of the slope which may need a short
retaining wall to prevent the slope from encroaching into the right of way. The
use of compact parking spaces may also alleviate the need for overhanging
parking stalls and or retaining walls for a portion of the parking area.
Compact spaces have been added to the site plan; grading has been adjusted to
accommodate overhang by flattening the grades and adding landscaping; a short (30")
retaining wall has also been added, as shown on site plan.
6. Please revise Section 4.2 of the Noise Study prepared by Lnd Consulting to reflect
the 50 CNEL interior attenuated noise level standards established by Figure 3 of
the Airport Land Use Compatibility Plan for McClellan-Palomar Airport. Please
revise any other text or resultant mitigation as a result of the different noise level
standard.
The Noise Study has been revised to reflect the 50 CNEL interior attenuated noise level
standards.
7. Piease review the noise impacts associated with the carwash on the adjacent
outdoor seating/waiting area. Please address any required sound attenuation or
mitigation required.
The Noise Study has been revised to address the noise impacts associated with the car
wash. See page 15 ofthe document
8. The project proposes a "common" outdoor area at the carwash building. This site
is not very "common" nor conducive to use by the center as a whole. The site
plan also provides an alternative design, which if built would be a preferred
design location. Please revise the plan to provide an outdoor gathering/eating
area in proximity to pads A and B (potentially restaurant pads). The project shall
provide for a more certain site and central location and that could be shared by
all. The landscape planting area at the southwestern corner of Pad A may be used
as an outdoor area. The trees may be kept in place and a patio area with tables
and chairs installed. A perimeter landscape hedge and/or seat wall could also be
added. Another option would be at the northern end of the dog run area may
provide for such a site. The area could be separated from the dog run by a low
fence (or revise fill and retaining wall location) and provide a patio area with
benches and tables and a shade structure. If the area provided is larger than 400
square feet, contains more than six tables, and contains more than twenty percent
of the indoor seating provided or twenty seats, the area will need to be included in
the required parking for the project. If the amenities and area of the common area
is less than the threshold above, an Incidental outdoor dining permit will be
required. This is an administrative permit and would be acted upon by the
Planning Director. Please refer to Chapter 21.26.013 of the Carisbad Municipal
Code for more details.
A patio has been added at the southwest corner of Pad A. It is less than 400 sf This
patio location was agreed to in a meeting between our team with Van Lynch and Chris
DeCerbo on 4/8/10 at the City offices. See Sheet A-1.
On Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria, fifth bullet
point, please replace the word "freeway" with "roadways and airport."
Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria, fifth bullet point, has
been revised to "roadways and airport".
10. On Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria and Parking
Lot Lighting, please delete the reference to National City.
The reference to National City has been deleted.
11. A gas pricing sign will not be permitted on El Camino Real as the gas station is
not located at the intersection of the Palomar Airport and El Camino Real
roadways and El Camino Real is identified as a Scenic Corridor.
A stand-alone gas pricing sign is not proposed for El Camino Real. However, as part of
the proposed sign program, a request is made for a combo monument sign along ECR
that will provide center identification along with gas pricing information.
Since the gas station pad/location is completely screened from El Camino Real visibility
due to the Lowes anchor building, passing motorists along ECR will not get the benefit of
having the gas station location disclosed them, as it is part of the overall retail center.
The overall signage allowances, and the components that generate a Variance request,
are reflected in the proposed Sign Program, and Variance justifications, as attached to
this resubmittal package.
12. Please add a location for a bicycle rack and identify it on the plans.
A bicycle rack has been added at the south end of the drug store building, adjacent to
the trash enclosure, tt was confirmed in the same 4/8/10 meeting with Van and Chris
that including one (1) bicycle rack for the project, in this location, would be acceptable.
See Sheet A-1.
13. Additional applications for the variety of Conditional uses (drive thrus) and sign
variance need to be submitted.
Provided with this submittal are "applications" for: (1) CUP for drive thru bank; (2) CUP
for drive thru pharmacy; (3) CUP for gas station/car wash and (4) CUP amendment to
CUP 03-21 for the North County Animal Shelter improvements. Per communication with
Van Lynch, additional application materials were not being required for the additional
CUPs. We have provided a new Land Use Review Application/Hazardous Waste and
Substance Form and Disclosure Statement for the CUP amendment to 03-21.
A variance has been submitted for the project's proposed sign allowances.
14. The City is only supportive of the outdoor sales of Christmas trees in the parking
lot area (Outdoor display area E). No other outdoor storage or display of
merchandise (live nursery, promotions, or occasional vendor display) will be
permitted. The display of sheds and trailers shall be located within the confines
of the building or garden center.
Per meeting with City staff, Tuesday April 6, applicant and staff agreed that no other
outdoor storage or display of merchandise will be permitted. No change to exhibits.
15. Landscape plancheck comments are attached as well as redlined landscape
plans.
See separate response document to city landscape comments.
Engineering:
STORMWATER
1. Effective March 25, 2010, Carlsbad adopted a new Standard Urban Stormwater
Management Plan (SUSMP). Among other things, the new SUSMP affects how
you select/size water quality treatment devices which will impact the design layout
of this project. As a resource, you may review the new Carlsbad SUSMP at the
City's website.
We acknowledge the updated SUSMP requirements by the City of Carlsbad and believe
that the proposed design meets the current standards.
2. EEl's January 13, 2010 Geotechnical Evaluation, Section 9.2 Site Drainage, states
that "runoff should ... not [be] allowed to pond and/or seep uncontrolled into
the ground." Provide an analysis letter from the geotechnical consultant
discussing the impact of the underground stormwater detention and infiltration
system.
An analysis of the subsurface drainage design has been prepared by EEI, the team's
geotechnical consultant, dated April 8, 2010, and has been included with the re-
submission package.
GRADING/EARTHWORK
3. As shown on sheet 04, revise the location of the toe of slope along Palomar
Airport Road or add a retaining wall to maintain a flat parkway within the right of
way.
A low retaining/landscaping wall (30") has been added at the top of the slope to ensure
that he proposed fill slope accommodates a flat parkway within the Palomar Airport
Road ROW. See Sheet C-4.
UTILITIES
4. Provide an analysis letter from the geotechnical consultant discussing the impact
of the proposed fill on the existing sanitary sewer line.
An analysis of the impact of the proposed fill on top of the existing sanitary sewer lines
has been prepared by EEI, the geotechnical consultan,t dated March 3, 2010, and has
been included with the re-submission package.
5. Consider reducing the height of the retaining wall along the south boundary from
Section WX7 west by obtaining a letter of permission from the southerly property
owner allowing offsite grading. As shown, demonstrate how runoff from the
slope along this area is conveyed to the storm drain system.
The developer is in discussions with the adjoining southerly property owner on a number
of issues, one being the obtaining of a "permission to grade" letter. At the time of this re-
submisison, no formal agreement has been reached and therefore the retaining wall
along the southerly property line will remain until such time that the "permission to grade"
agreement has been formalized. The grading at the base ofthe wall has been adjusted
to direct the runoff to the existing brow ditch that will remain.
Portions of the site plan showing the utility access drive and storm drain outlet
details have been routed to Maintenance and Operations. Comments will be
provided by separate letter.
At this time (April 15, 2010) no written comments have been generated by Maintenance
and Operations. We assume that the project as proposed can be serviced until further
notice is communicated.
Show the discharge line for the existing CMWD facility on the southeast corner of
Palomar Airport Road and El Camino Real connected to the proposed storm drain
system. Contact William Plummer at (760) 602-2768.
The CMWD discharge line has been located and labeled on the easterly side of El
Camino Real as shown on civil sheet C5.
Show the location of existing and/or proposed potable, irrigation and/or reclaimed
water meters.
Two existing meters were found along Palomar Airport Road and labeled on the civil
drawings. The first meter is for the North County Animal Shelter and provides water for
landscape irrigation. The second meter is located adjacent to the existing driveway into
the (former) Olympic Club site and provides the irrigation water for the Palomar Airport
Road ROW. Both meters will remain in place.
TRAFFIC
Review of the Traffic Impact Analysis has not been completed. Comments will be
provided by separate letter.
City Traffic staff has provided comments. See Traffic responses in separate response
document attached to this submittal.
STREET IMPROVEMENTS
10. As shown on sheets 04 and 08, revise the Palomar Airport Road and El Camino
Real right of way to provide 10' from face of curb to the future right of way.
The Palomar Airport Road and El Camino Real ROW'S have been adjusted to provide
the required 10' distance from the proposed face of curbs to the new ROW line.
OTHER
11. Discuss how maintenance of the common areas and implementation of the SWMP
for this project will incorporate the portion of CUP 03-21 within this project.
The Developer will undertake the maintenance and operation of all proposed SWMP
within the proposed project A lot line adjustment will be processed to combine the
portion of CUP 03-21, that will now fall under the area of the development of the
Palomar Commons project, to the existing parcel that incorporates the balance of the
Palomar Commons project
12. Provide recommendations from the County of San Diego regarding compliance
with the County's letter of May 8, 2008 from County of San Diego Solid Waste
Management Enforcement Agency.
A meeting was held with the County of San Diego and a subsequent letter has been
provided by the County for submission to the City of Carlsbad.
Two (2) Copies ofthe County letter are being provided with this submittal.
13. Provide a letter from the southerly property owner agreeing in concept to the
proposed off-site improvements shown at the southeast corner of the site
adjacent to El Camino Real.
The Developer has been in contact with the southerly property owner and is in the
process of obtaining the necessary consent letter.
14. Coordinate fire protection and access with Carlsbad Fire Department. Contact
Dominic Fieri at (760) 602- 4664.
Fire protection and access has been coordinated with Carlsbad Fire Department
15. Additional comments may be developed during subsequent review of a compiete
submittal.
Acknowledged.
16. A redlined check print of the site plan, the drainage study and SWMP is enclosed
for the applicants use in making the requested revisions. Please return this check
print and the enclosed copies of the drainage report and SWMP to facilitate
continued staff review.
Redlines are being returned as part of this submittal.
Geotechnical & Environmental Solutions
'(^
April 13, 2010
Mr. Mark Radelow
Vice President/Senior Project Manager
SUDBERRY PROPERTIES, INC.
5465 Morehouse Drive, Suite 260
San Diego, CA 92121
Subject: Geotechnical Response and Considerations
Stormwater Disposal Systems
Proposed Retail Development-Palomar Airport Commons
Palomar Airport Road and £1 Camino Real
Carlsbad, San Diego County, California
EEI Project No. SUD-70986.4
References: 2nd Review for Palomar Commons - GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-
07/SUP 09-08, prepared by the City of Carlsbad Planning Department,
Dated March 29, 2010
Lang Engineering Company, Drainage Study for Palomar Airport Commons, Parcels A
& B, Portion of Lot G, Rancho Agua Hedionda Map No. 823, dated February 24,2010
Geotechnical Evaluation, Proposed Retail Development, Palomar Airport Commons,
Carlsbad, San Diego County, Califomia, prepared by EEI, dated January 13, 2010
Dear Mr. Radelow:
In accordance with your request and authorization, EEI has performed a limited geotechnical evaluation
of proposed stormwater disposal systems at the subject site in Carlsbad, Califomia. This letter is intended
to specifically address Comment No. 2 under engineering section- stormwater- of the referenced review
comments prepared by the City of Carlsbad.
Based on our review of the referenced review comment and our review of the referenced Drainage Study
(prepared by Lang Engineering Co.), we understand that the proposed stormwater disposal system
consists of subsurface storage of larger runoff volumes along with subsurface infiltration of the "first
flush" stormwater collected from the planned retail development at the site.
2195FaradayAvenue, Suite K, Carlsbad, California 92008-7207 Ph: 760-431-3747 Fax: 760-431-3748 www.eeitiger.com
Geotechnical Evaluation of Siomwater Disposal Systems
Palomar Airport Commons, Carlsbad, CA
April 13,2010
EEI Project No. SUD-70986.4
As noted in our referenced geotechnical report, groundwater was encountered in three of our exploratory
borings at depths of 17 to 37 feet below existing ground surface (bgs) in the lower elevations ofthe site.
As such, it is anticipated that groundwater will be at least 10 feet below the bottom of the proposed
stormwater infiltration system, assuming the inflltration system will be installed at depths of 10 feet or
less below comparable existing grades in the particular parts of the site planned for the infiltration system.
Based on the above information, along with that provided in our referenced report, it is our opinion that
the onsite sandy earth materials or import select material can be expected to accommodate the proposed
onsite stormwater detention and infiltration systems and that they will not exhibit instability as a result of
implementing the proposed Best Management Practices (BMPs), provided the recommendations
contained herein and in our referenced report are properly incorporated into the proposed construction.
Structural Setback from Retention Devices
It is recommended that retention/disposal devices be situated at least three times their depth, or a
minimum of 15 feet (whichever is greater), from the outside bottom edge of structural foundations.
Structural foundations include (but are not limited to) buildings, loading docks, retaining walls, and
screen walls.
In instances where due to site constraints the stormwater system cannot be situated a minimum of 15 feet,
but are at least 10 feet from the outside edge of structural foundations for proposed retaining walls (such
as the proposed stormwater detention and inflltration system in the southwest portion of the proposed
development) we recommend that due to the higher potential for foundation soils to become saturated,
retaining walls should be designed with a reduction in allowable bearing capacity to 1500 psf, and a
reduced passive pressure of 150 pcf (due to a descending slope surface at the toe of the wall), along with a
subdrain/backdrain system be incorporated at the heel of the wall that reduces the buildup of hydrostatic
pressures within the retained soils.
Site specific percolation testing may be warranted at the proposed infiltration system areas prior to final
design.
All other recommendations, terms and conditions presented in our referenced report remain applicable to
the project and are included by reference herein.
EEI appreciates the opportunity of continued service to SUDBERRY PROPERTIES, INC. If you have
any questions, please contact the undersigned at (760) 431-3747.
'>-:t «
No. 2468
Exp. IJ/ai/ZC),
William R. Morrison
GE2468 (exp. 12/31/10)
Senior Geotechnical Engineer
Distribution: (2) addressee
(2) Lang Engineering Co.
ffrey P. Blake,
CEG 2248 (exp. 10/31/11)
Senior Engineering Geologist
P:\EEI Projects\SUDBERRY\Carlsbad - Former Olympic Resort\SUD-70986.1 GeotedmicalNMisc CorTespondence\SUD-70986,1 Sudbeny_stonnwater Evaluation rev (FNL WRM JPB cea
04.13.10).doc
"ip" SOLID WASTE LOCAL ENFORCEMENT AGENCY fsS^^fN^DTcTR
9325 HAZARD WAY SAN DIEGO, CA 92123
(858) 694-2888 FAX (858) 495-5004
1-800-253-9933
www.sdcdeh.orQ
CITY OF CARLSBAD
April 8. 2010 APR09OT
Mark K. Radelow, Vice President / Sr. Project Manager Community & Economic
SUDBERRY PROPERTIES, INC. Devetopment Department
5465 Morehouse Drive, Suite 260
San Diego, CA 92121
PALOMAR AIRPORT COMMONS PROJECT
AT PALOMAR AIRPORT/PALOMAR AIRPORT LANDFILL
CARLSBAD, CA
SWIS NO. # 37-AH-0002
APN# 213-020-18-00
Dear Mr. Radelow:
The County of San Diego Solid Waste Local Enforcement Agency (LEA) is certified bythe Califomia
Department of Resources, Recycling and Recovery (CalRecycle) to enforce state solid waste laws
and regulations at solid waste disposal sites including closed landfills. The LEA has been informed
of the proposed "Palomar Airport Commons' development, which will include a Lowe's home
improvement store and several other smaller commercial establishments. This development Is
proposed for a portion ofthe 240+ acre assessor's parcel number 213-020-18, owned bythe County
of San Diego, which is also the same parcel that contains the Palomar Airport landfill. The proposed
development is a post-closure land use activity located within 1,000 feet of buried waste. The
development must comply with Califomia Code of Regulations (CCR) Title 27 Section 21190 to
protect public health and safety and the environment, and must be reviewed and approved by the
LEA.
The proposed construction must comply with the requirements of Title 27 Section 21190, as outlined
in part below.
(a) Proposed post-closure land uses shall be designed and maintained to:
(1) protect public health and safety and prevent damage to structures, roads,
utilities and gas monitoring and control systems;
(2) prevent public contact with waste, landfill gas and leachate; and
(3) prevent landfill gas explosions.
(g) All on site construction within 1,000 feet ofthe boundary of any disposal area shall be
designed and constructed in accordance with the following, or in accordance with an
equivalent design which will prevent gas migration into the building, unless an exemption
has been issued:
Mr. Radelow - 2 - April 8, 2010
(1) a geomembrane or equivalent system with low permeability to landfill gas shall
be installed between the concrete floor slab ofthe building and subgrade;
(2) a permeable layer of open graded material of clean aggregate with a minimum
thickness of 12 inches shall be installed between the geomembrane and the
subgrade or slab;
(3) a geotextile filter shall be utilized to prevent the introduction of fines into the
permeable layer;
(4) perforated venting pipes shall be installed within the permeable layer, and
shall be designed to operate without clogging;
(5) the venting pipe shall be constructed with the ability to be connected to an
induced draft exhaust system;
(6) automatic methane gas sensors shall be installed within the permeable gas
layer, and inside the building to trigger an audible alarm when methane gas
concentrations are detected; and
(7) periodic methane gas monitoring shall be conducted inside all buildings and
underground utilities in accordance with Article 6, of Subchapter 4 of this chapter
(section 20920 et seq.).
Based on site specific information, such as the large size and HVAC requirements ofthe proposed
Lowe's building, the limited environmental testing results provided to the LEA, and additional testing
results that still need to be provided to the LEA, you may be relieved of certain of the above
requirements, such as the need for a geomembrane system. A determination will be made bythe
LEA upon review of the proposed plans and forthcoming testing results.
In order for the LEA to approve the development plans, please ensure the following
information is included in the submittal:
1. The presence of the landfill is disclosed to contractors and identified on
plans.
2. An approved Community Health and Safety Plan will be required. Landfill
gas monitoring for methane and trace gasses during the constaiction phase
of any trenching activity is a mandatory component
3. Any stmctures developed onsite shall include the addition of permanent,
hard-wire methane detectors. A written plan to monitor, maintain and
document the monitoring and maintenance ofthe detectors is also required.
4. A plan for managing expected and unexpected wastes during grading,
trenching and installation of Underground utilities.
5. Trench dams or similar devices to prevent the migration of landfill gas into
site structures from utility lines will be required. Discuss steps that will be
taken to address the potential for landfill gas migration associated with the
abandonment of any existing utilities.
Mr. Radelow - 3 - April 8, 2010
6. Perimeter landfill gas monitoring probes (subsurface) may be required to be
placed on the northern site boundary adjacent to Palomar Airport Road as
an early indicator system for the detection of migrating landfill gas.
7. Provide the LEA with a project time line for implementation of various
aspects of the project.
The LEA will work with you to determine which ofthe gas mitigation requirements outlined in CCR
Title 27 Section 21190 (g) will need to be incorporated into the design plans for the Palomar
Commons development upon receipt of additional sampling results and preliminary design plans for
the buildings.
It would be a violation of state law to proceed with construction before plans are submitted and
approved by this agency. The approval of plans by the local land use agency is not a substitute for
approval by this agency.
If you have any questions, please call me at (858) 694-2801.
Sincerely,
MELISSA PORTER, Environmental Health Specialist
Local Enforcement Agency
cc: Abel Martinez-Centeno, CalRecycle
Robert Morris, RWQCB
Peter Drinkwater, DPW Airports
Leeann Lardy, DPW Airports
Van Lynch, City of Carisbad, Senior Planner
Michele Stress, DPW IWSM
Jason Forga, DPW IWSM
Rodney Lorang, County Counsel
^vtojU/picM Op ^kc||p
City of Carlsbad
Planning Department
March 29, 2010
Hofman Planning and Engineering
3152 Lionshead Avenue
Carlsbad, CA 92010
SUBJECT: 2nd REVIEW FOR PALOMAR COMMONS - GPA 09-07/ZC 09-08/SDP 09-
05/CUP 09-07/SUP 09-08
Thank you for the resubmittal ofthe Palomar Commons project on March 1, 2010. Attached is a
list of items that are needed for further review of the application and items on the plans that
need to be addressed.
If you have any questions regarding the items attached, please feel free to call either myself or
the related department ofthe question.
• Planning Department comments: Van Lynch, Senior Planner, at (760) 602-4613 or
van.lynch@carisabdca.gov.
• Engineering Department comments: Steve Bobbett, Associate Engineer - Engineering
Development Sen/ices, at (760) 602-2747.
• Fire Department comments: James Weigand, Fire Inspections, at (760) 602-4661.
Sincerely,
VAN^LYNCH
Senior Planner
VL:bd
c: County of San Diego, Department of Public Works, Airports. 1960 Joe Crossen Drive, El
Cajon, CA 92020-1236
Chris DeCerbo, Team Leader
Steve Bobbett, Project Engineer
File Copy
Data Entry
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us
GPA 09-07/ZC 09-08/SDP t5^-05/CUP 09-07/SUP 09-08 - PALOM^COMMONS
March 29, 2010
Paqe 2
LIST OF ITEMS NEEDED
Planning:
There are a number of technical studies and reports that have yet to be submitted including:
Economic viability study (Market Study), and
LFMP Zone 5 analysis
Please submit these with your next resubmittal.
ISSUES OF CONCERN
Planning:
1. The office building height is 37 feet tall which exceeds the allowed building height of 35
feet. The building can either be lowered to comply with the 35 foot height limit, or the
project can increase all the required setbacks, including landscaping, an additional two
feet to accommodate the increase in building height.
2. The building elevations of Pad A and B along the entry of the project shall be enhanced
with additional building materials (stone base) and added architectural relief (arched
building elements with color trim) to mirror the front building elevations, including
windows (real or faux). Blank walls shall include additional building relief elements (right
side of west elevation).
3. Does the number of parking spaces provided include parking spaces that have been
identified for cart or outdoor display storage?
4. Please provide a cart storage facility for each of the Lowe's drive aisles.
5. The parking stalls which front along Palomar Airport Road in front of the Lowe's building
overhang into the sloped landscape area. This overhang conflicts with the landscape
screen planting. Please provide a greater flat area beyond the parking space for
overhang and to provide an area for the screen planting at the same height as the
parking stall. The slope may project down to but not encroach into the right of way.
There is a portion of the slope which may need a short retaining wall to prevent the slope
from encroaching into the right of way. The use of compact parking spaces may also
alleviate the need for overhanging parking stalls and or retaining walls for a portion of
the parking area.
6. Please revise Section 4.2 of the Noise Study prepared by Lnd Consulting to reflect the
50 CNEL interior attenuated noise level standards established by Figure 3 of the Airport
Land Use Compatibility Plan for McClellan-Palomar Airport. Please revise any other text
or resultant mitigation as a result of the different noise level standard.
7. Please review the noise impacts associated with the carwash on the adjacent outdoor
seating/waiting area. Please address any required sound attenuation or mitigation
required.
8. The project proposes a "common" outdoor area at the canwash building. This site is not
very "common" nor conducive to use by the center as a whole. The site plan also
provides an alternative design, which if built would be a preferred design location.
GPA 09-07/ZC 09-08/SDrt9-05/CUP 09-07/SUP 09-08 - PALOr^ COMMONS
March 29, 2010 ^ ^
Paqe 3
Please revise the plan to provide an outdoor gathering/eating area in proximity to pads A
and B (potentially restaurant pads). The project shall provide for a more certain site and
central location and that could be shared by all. The landscape planting area at the
southwestern corner of Pad A may be used as an outdoor area. The trees may be kept
in place and a patio area with tables and chairs installed. A perimeter landscape hedge
and/or seat wall could also be added. Another option would be at the northern end of
the dog run area may provide for such a site. The area could be separated from the dog
run by a low fence (or revise fill and retaining wall location) and provide a patio area with
benches and tables and a shade structure. If the area provided is larger than 400
square feet, contains more than six tables, and contains more than twenty percent of the
indoor seating provided or twenty seats, the area will need to be included in the required
parking for the project. If the amenities and area of the common area is less than the
threshold above, an Incidental outdoor dining permit will be required. This is an
administrative permit and would be acted upon by the Planning Director. Please refer to
Chapter 21.26.013 ofthe Carisbad Municipal Code for more details.
9. On Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria, fifth bullet point,
please replace the word "freeway" with "roadways and airport."
10. On Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria and Parking Lot
Lighting, please delete the reference to National City.
11. A gas pricing sign will not be permitted on El Camino Real as the gas station is not
located at the intersection of the Palomar Airport and El Camino Real roadways and El
Camino Real is identified as a Scenic Corridor.
12. Please add a location for a bicycle rack and identify it on the plans.
13. Additional applications for the variety of Conditional uses (drive thrus) and sign variance
need to be submitted.
14. The City is only supportive of the outdoor sales of Christmas trees in the parking lot area
(Outdoor display area E). No other outdoor storage or display of merchandise (live
nursery, promotions, or occasional vendor display) will be permitted. The display of
sheds and trailers shall be located within the confines of the building or garden center.
15. Landscape plancheck comments are attached as well as redlined landscape plans.
Engineering:
STORMWATER
1. Effective March 25, 2010, Carisbad adopted a new Standard Urban Stormwater
Management Plan (SUSMP). Among other things, the new SUSMP affects how you
select/size water quality treatment devices which will impact the design layout of this
project. As a resource, you may review the new Carisbad SUSMP at the City's website.
2. EEl's January 13, 2010 Geotechnical Evaluation, Section 9.2 Site Drainage, states that
"runoff should ... not [be] allowed to pond and/or seep uncontrolled into the ground."
Provide an analysis letter from the geotechnical consultant discussing the impact of the
underground stormwater detention and infiltration system.
0 D
GPA 09-07/ZC 09-08/SDPt59-05/CUP 09-07/SUP 09-08 - PALOMAR COMMONS
March 29, 2010
Paqe 4 ,
GRADING/EARTHWORK
3. As shown on sheet C4, revise the location of the toe of slope along Palomar Airport
Road or add a retaining wall to maintain a flat parkway within the right of way.
UTILITIES
4. Provide an analysis letter from the geotechnical consultant discussing the impact of the
proposed fill on the existing sanitary sewer line.
5. Consider reducing the height of the retaining wall along the south boundary from Section
WX7 west by obtaining a letter of permission from the southeriy property owner allowing
offsite grading. As shown, demonstrate how runoff from the slope along this area is
conveyed to the storm drain system.
6. Portions of the, site plan showing the utility access drive and storm drain outlet details
have been routed to Maintenance and Operations. Comments will be provided by
separate letter.
7. Show the discharge line for the existing CMWD facility on the southeast corner of
Palomar Airport Road and El Camino Real connected to the proposed storm drain
system. Contact William Plummer at (760) 602-2768.
8. Show the location of existing and/or proposed potable, irrigation and/or reclaimed wSiter
meters.
TRAFFIC
9. Review of the Traffic Impact Analysis has not been completed. Comments will be
provided by separate letter.
STREET IMPROVEMENTS
10. As shown on sheets C4 andC8, revise the Palomar Airport Road and El Camino Real
right of way to provide 10' from face of curb to the future right of way.
OTHER
11. Discuss how maintenance of the common areas and implementation of the SWMP for
this project will incorporate the portion of CUP 03-21 within this project.
12. Provide recommendations from the County of San Diego regarding compliance with the
County's letter of May 8, 2008 from County of San Diego Solid Waste Management
Enforcement Agency.
13. Provide a letter from the southerly property owner agreeing in concept to the proposed
off-site improvements shown at the southeast corner of the site adjacent to El Camino
Real.
14. Coordinate fire protection and access with Carisbad Fire Department. Contact Dominic
Fieri at (760) 602- 4664.
GPA 09-07/ZC 09-08/SD^S9-05/CUP 09-07/SUP 09-08 - PALOf^ COMMONS
March 29,2010 ^
Paqe 5
15. Additional comments may be developed during subsequent review of a complete
submittal.
16. A redlined check print of the site plan, the drainage study and SWMP is enclosed for the
applicants use in making the requested revisions. Please return this check print and the
enclosed copies of the drainage report and SWMP to facilitate continued staff review.
If you have any engineering questions, please call Stephen Bobbett at 602-2747.
w
(D^^ Geotechnical & Environmental Solutions
March 3,2010
Mr. Mark Radelow
Vice President/Senior Project Manager
SUDBERRY PROPERTIES, INC.
5465 Morehouse Drive, Suite 260
San Diego, CA 92121
Subject: Geotechnical Evaluation of Earth Loads on Existing Utilities
Proposed Retail Development-Palomar Airport Commons
Palomar Airport Road and £1 Camino Real
Carlsbad, San Diego County, California
EEI Project No. SUD-70986.1
References: I"* Review for Palomar Commons - GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-07/SUP
09-08, prepared by the City of Carlsbad Planning Department,
dated December 22,2009.
Site Development Plan, Palomar Airport Commons, Parcels A &B, Portion of Lot G of
Rancho Agua Hedionda, Map No. 823, City of Carlsbad, California, prepared by Lang
Engineering Co., Sheets C4 and C6, dated November 19, 2009.
Geotechnical Evaluation, Proposed Retail Development, Palomar Airport Commons,
Carlsbad, San Diego County, California, prepared by EEI, dated January 13,2010.
Dear Mr. Radelow:
In accordance with your request and authorization, EEI has performed a geotechnical evaluation of
proposed loading of the existing sanitary sewer pipeline at the subject site in Carlsbad, Califomia. This
letter is intended to specifically address Comment No. 39 of the referenced review comments prepared by
the City of Carlsbad.
Based on our review of the referenced review comments, we understand that the existing sanitary sewer
pipeline consists of 15-inch vitrified clay pipe (VCP). EEI is not aware ofthe procedures employed to
construct the existing sanitary sewer pipeline. Our review of the referenced site development plan
(prepared by Lang Engineering Co.) indicates that proposed grading at the site associated with the
planned retail development could result in up to 28 feet of overburden above the existing pipe.
2193 Faraday Avenue, Suite K, Carlsbad, California 92008-7207 Ph: 760-431-3747 Fax: 760-431-3748 www.eeitiger.com
APPENDIX - EVALUATION OF DEAD LOAD ON RIGID CONDUIT
Reference: Naval Facilities Engineering Command, 1982, Design Manual 7.1 - Soil Mechanics, pp.
7.1-184 and 7.1-185.
Assumptions: Unit weight of soil (y) = 115 pcf
Clayey soil
Maximum height of overburden (H) = 28 ft.
Inside diameter of pipe = 15 in. = 1.25 ft.
Average outside diameter of pipe = 18 in. = 1.5 ft.
Width oftrench = 3ft.
Governing Equation:
W = Cw V
Where,
W =
Cw =
B =
V =
total dead load per unit length of conduit
Correction coefficient
Width of trench at top of pipe, or pipe outside diameter (if
under embankment)
Un it weight of backfill
Trench Backfill Load:
From Figure 18b (attached).
For H/B = 28 ft./3 ft. = 9.3 and clayey soil,
Cw = 3.5
W = (3.5) (115 pcf) (3 ft.)^
W = 3.622.5 lb./ft.
Embankment Load:
From Figure 18a (attached).
For H = 28 ft. and y = 100 pcf, W = 6,500 lb./ft.
For H = 28 ft. and y = 115 pcf, W = (6,500 lb./ft.) (1.15)
W = 7.475 lb./ft.
2195 Faraday Avenue, Suite BC, Carlsbad, Califomia 92008-7207 Ph: 760-431-3747 Fax: 760-431-3748 www.eeitiger.com
Geotechnical Evaluation of Earth Loads on Existing Utilities
Palomar Airport Commons, Carlsbad, CA
March 3,2010
EEI Project No. SUD-70986.1
It has been our experience that vitrified clay pipe is considered to be a rigid conduit. As noted above, EEI
does not know the methods that were used to install the existing pipe (i.e., whether the pipeline was
buried within an embankment, or if it was placed in a trench and subsequently backfilled). In light of this,
EEI has estimated the dead load on the pipe (following proposed grading at the site) for two conditions: 1)
assuming that the pipe was buried in an embankment; and 2) assuming the pipe was installed and
backfilled in a trench.
Review of our referenced geotechnical evaluation report indicates that the existing soils that overlie the
pipeline are generally clayey with an average moist unit weight on the order of 115 pounds per cubic foot
(pcf). Results of our calculations (Appendix) indicate the following dead load pressures under each
condition:
Estimated Dead Load Pressures for 15-inch VCP With 28 feet of Overburden
Method of Pipeline Installation Dead Load Pressure
Embankment Burial 7,475 lb./ft.
Trench Burial 3,623 lb./ft.
While EEI is not aware of the specifications of the existing vitrified clay pipe (VCP) that was placed at
the site, it has been our experience that the crushing strength of 15-inch VCP that is currently
manufactured is typically on the order of 2,800 lb./ft. to 3,000 lb./ft.
In light of the above information, it appears that the estimated dead load pressures that could result from
the planned earthwork at the site will likely exceed the VCP's crushing strength. As a result,
reinforcement of the existing pipe (using such measures as concrete encasement), relocation of the
existing pipe, reinforcement of the existing pipe using encasement, or replacement with higher strength
pipe (such as ductile iron pipe, reinforced concrete pipe, etc.) appears to be warranted.
EEI appreciates the opportunity of continued service to SUDBERRY PROPERTIES, INC. If you have
any questions, please contact the undersigned at (760) 431-3747.
Sincerely,
EEI
William R. Morrison
GE 2468 (exp. 12/31/10)
Senior Geotechnical Engineer
Jeffrey P. Blake, CE^«^
:EG 2248 (exp. 10/31/11)
Senior Engineering Geologist
Attachment: Appendix - Evaluation of Dead Load on Rigid Conduit
CITY OF VISTA
F 0 R N i A
CITY OF CARi,.S3AD
FEB 1 9 2010
PUNNING DtPART;.;Liiirj
February 16, 2010
City of Carlsbad
Planning Department
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Subject: Palomar Airport Commons
The Buena Sanitation District has met and is coordinating with Mark Radelow of Sudberry
and Dick Lang of Lang Engineering regarding the relocation ofthe 18-inch Buena Outfall
Sewer Line and the 12-inch Buena Ocean Outfall Excess Effluent Line to facilitate the
Palomar Airport Commons development proposed for the southwest corner of Palomar
Airport Road and El Camino Real.
The City does not object to relocation ofthe above mentioned pipelines provided the usual
pipeline relocation conditions are met, including but not limited to the following:
1. The pipeline relocations are designed to meet or exceed the City of Vista Design
Standard;
2. The design, location, route and specifications are subject to approval by the
City/District Engineer through a plan check process;
3. Prior to construction the Developer and Buena Sanitation District enter into a written
relocation agreement; and
4. The Developer provides a plan check and inspection deposit to be determined at a
later date.
If there are any questions or comments please call or email me at (760) 726-1340 xl332 or
lpierce@citvofvista.com.
Sincerely,
Lawrence D. Pierce, P.E.
Director of Engineering
Cc: Steve Jepsen, Sewer Program IVIanager
P; 760-726 1340 www.cityofvista.com F: 760-639-6132
600 Eucalyptus Avenue, Vista, California 92084-6240
02/08/2010 17:30 FAX 916 657 5390 NAHC 121001
NATIVE AMERICAN HERITAGE COMMISSION
915 CAPrrOL MALL, ROOU M«
SACRAMINTD, CA ttMh«
PW(»16)<S7.BM0
WOb Slto wuror nahe aa gnv
••mM: 4t;_naMOpaebslLne(
February 8, 2010
Mr. Van Lynch
CITY OP CARLSBAD
1635 Faraday Avwiue
Carisbad, CA 92008
Sent by FAX to 760-602-4613
No. Pages: 2
Re: Tribal Consultation Per SB 18 fGovamment Code 65352.3. 6S352.4. 65S60 and 65562.5^
and Saerad Lands Rte Search ft>r General Plan Aiwndmant far tha Paiomar Commons Proitct:
located in the Citv of Carlsbad: San Dieoo Countv. Caiifomia
Dear Mr, Lynch;
Oovemment Code §65352.3 requires local govemments to consult with California Native American
tribes Identlfted by the Native American Heritage Commission (NAHC) for the purpose of protecting,
and/or mitigating impacts to cultural places. Attached is a Native American Tribal Consultation list of
tribes with traditional lands or culturai places located within the requested plan txxjndaries.
Furthermore we suggest that you contact the Caiifomia Historic Resources Information
System (CHRIS) at the nearest information Center (contact 916- 653-7278) to detemiine if there are
any reconded CHRIS sites within or near the APE.
A NAHC Sacred Lands File search was conducted kiased on the coordinates of this properfy or "area
of potential effecf (APE) and Nath^ American CuHural Resources sites were not found within one-half
mile, within the 'area of potential effiecf (e.g. APE) you identified. Local govemments should be aware,
also that records maintained by Oie NAHC and CHRiS are not exhaustive, and these searches do not
preclude the existence of other cultural resources. A tribe may be the only source of information
regarding the existence of a cultural place, i suggest you consult with all of those on the accompanying
Native American Contacts list, which has been included separately, if they cannot supply Infonnation,
they might recommend others with speciUc knowledge about cultural resources in your plan area. If a
response has not been recent within two weeks of notification, the Commission requests that you
follow-up with a telephone call In about two weeks to ensure that the project information has been
received.
If you receive notification of change of addressee and phone numbers from Tribes, piease notify me.
/our assistanbb we are a|$te to assure that our consultation list contains current informatfon.
IfVou have any questiors; please contact me at (916) 653-6251.
Attachment Native American Tribal Consuttation List
02/08/2010 17:30 FAI 916 657 5390 NAHC
N'^^e American Tribal Consultation Lli^
San Dlego County
February 8, 2010
11002
San Pasqual Band of Mission Indians
Allen E. Lawson, Chairperson
PO Box 365 Diegueno
Vailey Center > CA 92082
(760) 749-3200
Kwaaymii Laguna Band of !\/lission Indians
Carmen Ijjcas
P.O. Box 775 Diegueno - Kwaaymii
Pine Valley . CA 91962
(619)709-4207
Santa Ysabei Band of Diegueno Indians
Johnny (Fernandez, Spokesman
PO Box 130 Diegueno
Santa Ysabel > CA 92070
brandletaylor@yahoo.com
(760) 765-0845
Inaja Band of Mission Indians
Rebecca Osuna, Spokesperson
2005 S. Escondido Blvd. Diegueno
Escondido , CA 92025
(760) 737-7628
Mesa Grande Band of Mission Indians
Mart< Romero, Chairperson
P.O Box 270 Diegueno
Santa Ysabel . CA 92070
mesagrandeband@msn.com
(760) 782-3818
La Jolla Band of Mission Indians
ATTN: Rob Roy,Environmental Director
22000 Highway 76 Luiseno
Pauma Valley , CA 92061
lajolla-sherry@aol.com and
(760) 742-3790
Pala Band of Mission Indians
Tribal Historic Preservation Offlce
35008 PalaTemecula Rd, PMB 446 Luiseno
Pala ) CA 92059 Cupeno
(760) 891-3500
Mel Vernon, Chairperson
San Luis Rey Band of Mission Indians
1044 North Ivy Street
Escondido > CA 92026
melvem@aol.com Luiseno
(760) 746-8692
(760) 703-1514-cell
Pauma & Yuima
Chrlstobal C. Devers, Chairperson
P.O. Box 369 Luiseno
Pauma Valley . CA 92061
paumareservation @aoi-com
(760) 742-1289
This list ta current only as of ttw date of this document
DIatrlbutiQn of this lUt OOM not nitovs any person of altrtutoiy rcsponsltdlily as doflned in Sactlon 7060.5 of the Haalth and
Safaiy Code. Section 5097.94 of tha PuHie Rasourcea Code and SacUon $097,98 of the Public Reeoureaa Coda.
This list Is appiicaMa only tor eonawitatkm with Native Amarlean tribes under Govenment Code Sectton 66352.3.
LOCkWOOd - Carisbad CA 92008
A black & white approach to professionalism.
Commercial ^725 Jefferson Street, Suite 1
Realty p^one 760.730.9100 Fax 760.730.9200
www.lockwooclcommercial.com
CITY OF CARLSBAD
JAN 04 2010
December 30,2009
Mr. Van Lynch
Planning Department
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Palomar Commons
Dear Van;
I am the Association Manager for the Landing Business Park which sits "downstream" for the
new proposed Palomar Commons project on the site of the former Olympic Resort. The prior
project had the building development portion limited to the eastem side of the property and much
of tiie westem portion was in a natural run off state, but even then there were a number of
instances where the Landing experienced major flooding problems with building and site damage
caused by excessive run off and landscape debris that moved xmto this property.
While the Association is not opposed to this new development major steps will need to be taken
to properly channel the runoff water from this site inot the Creek and not unto this property.
Based upon the plans this new development appears to be 80% or more non natural surfaces to
inciude building roofs and asphalt parking areas. If these steps are not taken the nmoff water
will increase and there could be significant damages during heavy storms. The other challenge is
that the natural creek bed that starts at the comer and runs along the eastem edge ofthe Landing
is probably inadequate to handle more runoff water. This Association ends up spending large
amounts of money each year to maintain the vegetation in this creek and the removal of misc
items. This new development will only increase these costs so there will need to be an
agreement wdth the City or the project owner to share in these costs moving forward and this
needs to be addressed in any project development agreements.
Please call me at your convenience to discuss any of these issues and we all want to support well
planned commercial development as we can all benefit from the amenities this new project will
provide.
Sincerely,
Charles D. Currey, SIGR
Executive Vice President
Lockwood Commercial Realty Inc.
c o FILECOPY
City of Carlsbad
Planning Department
December 22, 2009
Hofman Planning and Engineering
3152 Lionshead Avenue
Carlsbad, CA 92010
SUBJECT: 1*' REVIEW FOR PALOMAR COMMONS - GPA 09-07/ZC 09-08/
SDP 09-05/CUP 09-07/SUP 09-08
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Land Use development permit applications, application nos. GPA 09-07/ZC
09-08/SDP 09-05/CUP 09-07/SUP 09-08, as to its completeness for processing.
The General Plan Amendment (GPA) and Zone Change (ZC) legislative applications are
complete as submitted. The remaining development applications consisting of a Site
Development Plan, Special Use Permit, and Conditional Use Permit are deemed to be
incomplete. Since the legislative actions (GPA and ZC) are being processed concurrently with
the other quasi-judicial actions, the other development permit applications must remain
incomplete until these legislative actions are approved by the City Council. Staff will continue to
concurrently process and take the development applications to the decision-making bodies
together and in an order by which the applications can be decided upon. The City may, in the
course of processing the application, request that you clarify, amplify, correct, or othenwise,
supplement the basic information required for the application. In addition, you should also be
aware that various design issues may exist. These issues must be addressed before this
application can be scheduled for a hearing.
Notwithstanding the above, attached are two lists. The first list is information which must be
submitted to othervvise complete your applications. This list of Items must be submitted
directly to your staff planner by appointment. All list items must be submitted
simultaneously and a copy of this list must be included with your submittals, including
five (5) sets of plans.
If you would like to schedule a meeting to discuss this letter or your application, please contact
your staff planner Van Lynch at the phone number listed below. You may also contact each
commenting department individually as follows:
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.cl.carlsbad.ca.us ^
GPA 09-07/ZC Og-OS/SDPtlQ-OS/CUP 09-07/SUP 09-08 - PALOM/S!^ COMMONS
December 22, 2009
Paqe 2
• Planning Department comments: Van Lynch, Senior Planner, at (760) 602-4613 or
van.lynch(gcarlsabdca.gov.
• Engineering Department comments: Steve Bobbett, Associate Engineer - Engineering
Development Services, at (760) 602-2747.
• Fire Department comments: James Weigand, Fire Inspections, at (760) 602-4661.
Sincerely,
CHRIS DeCERBO
Principal Planner
GTB:VL:sm
Enclosures: Redline copy, CUP 09-07 Site Plan dated November 19, 2009
Redline Landscape plan dated November 12, 2009
Drainage Study dated November 19, 2009Baffle box cross section
Stormwater Management Plan dated November 19, 2009
County of San Diego Solid Waste Local Enforcement Agency
Letter dated May 8, 2008
c: County of San Diego, Department of Public Works, Airports. 1960 Joe Crossen Drive, El
Cajon, CA 92020-1236
Chris DeCerbo, Team Leader
Steve Bobbett, Project Engineer
File Copy
Data Entry
GPA 09-07/ZC 09-08/SDflQ-05/CUP 09-07/SUP 09-08 - PALOI\^ COMMONS
December 22, 2009
Paqe 3
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
Planning:
1. Please provide on the plans the name and address of the owner (County of San Diego)
whose property is proposed to be developed.
2. Please add the Project application types and project numbers in the upper right hand
corner (i.e. GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-07/SUP 09-08).
3. Please add to the summary table (T-1 and C-1) the assessor's parcel number 213-020-
18-00. The other number used (760-221-015) is a possessory interest (lease) number
and may be kept in parentheses for additional information.
4. Please provide the area of the site which is undevelopable per Zoning Ordinance
Section 21.53.230 (include the acreage in each category). If not applicable, please state
so on the plans.
5. Please provide the Average Daily Traffic generated by the project to the T-1 and C-1 title
sheets.
6. Please provide one (1) copy (plan view) of the project's roof design to include ridges,
hips, slope direction, etc. Show location of roof appurtenances, mechanical equipment
and screening. Show all roof top equipment, appurtenances, stairways or other access
provisions, including those required by the applicable building, plumbing, electrical and
mechanical codes. All roof mounted equipment shall be installed in accordance with
Building Department Policy 80-6. Sections shall be provided to show how rooftop
mechanical units will be screened as viewed from Palomar Airport Rd and El Camino
Real.
7. The project application includes one Conditional Use Permit for four different conditional
uses i.e.; drug store drive thru, bank drive thru, gas station, and car wash. Staff is
concerned with including four separate uses under one Conditional Use Permit and
suggests that the applicant apply for four separate Conditional Use Permit applications.
8. Please apply for an amendment to the existing Conditional Use Permit (CUP 03-21) for
the animal shelter to realign the driveway and modify the dog run area.
9. Please add building height dimensions to the Lowe's building. Please include height
measurements to all architectural features and building elements.
10. The title sheet T-1 references a Noise Study and Biological Study and Report. Please
provide copies of the Noise and Biological reports prepared for the site. The biological
study shall include an analysis of the offsite drainage located to the south of the site to
determine if there are any riparian of wetlands that may require buffers. . The report
shall assess the project impacts in accordance with the City of Carlsbad Habitat
Management Plan (HMP). The noise study shall include an analysis for the car wash.
These studies will be used to assess the impacts associated with the site during the
CEQA review.
GPA 09-07/ZC 09-08/SDP ^-05/CUP 09-07/SUP 09-08 - PALOM/^R COMMONS
December 22, 2009
Paqe 4 -
Engineering:
11. Submit a geotechnical report addressing the development of this site as proposed.
Include discussions of proposed remedial grading (if any) to remove and replace
undocumented fill, the depth of proposed fill in areas of the proposed stormwater
detention/infiltration systems, the infiltration rate of underlying material for the first 10'
below the bottom of the systems, infiltration rate and soil type for compacted fill, and the
depth to groundwater.
12. Complete all discretionary application Project ID numbers in the upper right corner of the
title sheet.
ISSUES OF CONCERN
Planning:
1. Please revise the parking space dimensions to satisfy the minimum area (170 square
feet) and width (minimum 8.5 feet) per Section 21.44.050, Table B, of the Carlsbad
Municipal Code.
2. Please resolve the difference in acreage of the site (Sheet T-1 acreage vs. Sheet C-1
(tota! acres and APN) acreage).
3. In the Civil plans, please add the curve data "C4" to the "Boundary Table".
4. Please review the terms applied to the east and west parcels (Sheet A-1). It appears as
this is intended to be a parcel subdivision. What is the purpose of this line? If it is a
subdivision, a tentative parcel map will need to be submitted. If it is other than a parcel
boundary, please label it something else or eliminate it if it is information the City does
not need.
5. On Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria, please provide a
reference to the particular "Dark Sky" standards that the project would be subject to
comply with.
6. On Sheet A-1, Exterior Lighting Concepts, Lighting Design Criteria and Parking Lot
Lighting, please delete the reference to National City.
7. On Sheet A-1, Exterior Lighting Concepts, Landscape Concept Lighting, please add the
word "aviation" to the sentence: "Landscape lighting shall be located such that glare is
minimized for vehicular, pedestrian, and adjacent aviation traffic".
8. On the Color and Materials Board, please note on the actual building elevation the
number to represent what color and finish the building will have (i.e. IA on portion of
building to have a plaster finish with new colonial yellow color).
9. The wall mounted lights "Centurion - Sconce - Pompey" (item 9 on materials legend of
Color and Materials Board) should be replaced or shielded to eliminate glare. All
exterior lighting shall be directed downward.
10. On sheet A-1, please review the dimension of the setback line showing the parking lot
setback from El Camino Real. The setback shall be measured from the property line.
GPA 09-07/ZC 09-08/SDRQ-05/CUP 09-07/SUP 09-08 - PALOIV^ COMMONS
December 22, 2009
Paqe 5
not curb line. Please add a setback line for all other parking areas or add the dash line
representing the setback line (25 feet for parking per the El Camino Real Corridor
Development Standards) to show compliance with the required setback as done along
Palomar Airport Rd.
11. Please add the footprints of columns and outlines of any canopy structures (Patio, drive-
thru, and detail area) to the site plan, A-1 (as done for the gas station).
12. Please revise the building plans to show the building heights as measured from finish
grade, not finish floor.
13. Please show the architectural projection (Arch with sign) on the west elevation of the
Lowe's building on the site plan.
14. Please identify the purpose and use of the "staging" portion of the Lowe's building.
15. Please add the footprint of the "detail area" structure and provide a dimensioned setback
from the property line.
16. Pursuant to Commercial Policy C.6 of the General Plan Land Use element, corporate
architecture is not allowed. Please revise the Lowe's building store front to not resemble
the Lowe's corporate architectural design. Suggested redesign includes incorporation of
a hip roof structure to add mass and depth to the building front. Furthermore, the
architectural feature exceeds forty-five feet in height. Pursuant to Section 21.28.030(d)
of the Carlsbad Municipal Code, architectural protrusions above forty-five feet shall
require City Council approval of the Site Development Plan.
17. Pursuant to Commercial Policy C.7 of the General Plan Land Use element, commercial
development shall provide a variety of courtyards and pedestrian walkways. Please
redesign the site plan to provide more public gathering places and pedestrian friendly
uses.
18. The outdoor sales/garden center proposed along the El Camino Real Scenic Corridor
elevation should be fully screened with architectural elements and features whereby the
uses are not visible from El Camino Real. Furthermore this elevation should emulate the
quality and type of architectural features incorporated into the proposed storefront.
19. Please consider the visibility of the Lowe's roof from adjacent industrial office buildings.
A raised parapet or short screen wall should be included to effectively screen the entire
roof.
20. Site plan A-1 does not reflect the grading as shown on sheet C-1 in the area of the dog
run and detention area. Please revise as necessary.
21. Please provide the Lowe's outdoor display sheet (OD) referenced on the title sheet T-01
and a seasonal sales plan for the Lowe's site (if different). Please note that the outdoor
storage of goods and products in shopping centers is expressly not allowed.
22. Please revise the plans to show the required corner sight distance lines and
demonstrate that the proposed monument signs do not obstruct vision.
23. Please show the location of the existing County Animal Shelter monument sign.
GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-07/SUP 09-08 - PALOMM COMMONS
December 22, 2009
Paqe 6
24. The City of Carlsbad Sign Ordinance (21.41.095) only permits one monument sign per
street frontage. The project has two street frontages (Palomar Airport Road and El
Camino Real); therefore only two monument signs are permitted. The Sign ordinance
further states that said monument signs maximum sign area is 50 square feet, including
the frame, cabinet, monument, monument base or fixture. The sign provisions of Area
Four of the El Camino Real Corridor Development Standards do not apply to commercial
development. Double faced signs which have parallel faces shall be computed as one
sign face. Conceptual plans of the proposed monument signs shall be provided. A
Variance application is required to deviate from the requirements ofthe sign ordinance.
25. The signs for the Lowe's building exceed the letter height allowance (4 feet/48 inches)
for commercial buildings. An application for a sign variance will be required. Please
submit adequate justifications to vary from the Sign Ordinance Standards. The western
elevation sign is close to following the sign provisions and shall be modified to a
maximum sign height of 4 feet (48 inches). The overall sign allowance to the Lowe's
building is one (1) square foot of signage per lineal foot of building frontage. Since the
building fronts onto Palomar Airport Road and El Camino Real, both these elevations
apply towards the sign area. Please provide the overall length of the buildings on the
elevation plans. The project shall comply with the overall sign area allowance.
26. Please show the proposed location of the gas station price signs.
27. Pursuant to C.I of the Commercial Land Use Program of the General Plan, the project
shall be required to submit an Economic Viability study (Market Study) for this new
commercial land use.
28. A Local Facilities Management Zone (Zone 5) facilities analysis will need to be prepared
to determine if there are any increased demands on services to the site with the
proposed land use changes.
29. Please verify the plotting of the "Existing Airport f/KA Limit Line". It appears that the line
should be plotted further to the south than its present position.
Engineering:
Stormwater:
30. Together with all other Cities in the San Diego region, earty next year (estimated
March 2010) Cartsbad will be adopting a new Standard Urban Stormwater
Management Plan (SUSMP). Among other things, the new SUSMP will affect how
you select/size water quality treatment devices which will also impact the design
layout of this project. As a resource, you may review the 'model' SUSMP at:
http://www.Droiectcleanwater.orq/pdf/susmD/final updated model susmp 2009.Ddf.
Although the 'model' SUSMP will be revised to fit each city's needs, the new LID
standards will still be a requirement. We suggest you review the information, select
the method(s) of how you satisfy the new water quality standards and revise this
project (plans and SWMP) as necessary with the next submittal. Delaying
compliance with these upcoming standards may result in further project redesign and
processing delays that staff hopes to avoid. Please see the redlines for
alternatives/opportunities that may help you meet upcoming standards.
GPA 09-07/ZC 09-08/SDRQ-05/CUP 09-07/SUP 09-08 - PALOIV^ COMMONS
December 22, 2009
Paqe 7
31. The CDS units shown are not preferred structural BMPs. Consider as an alternative,
the baffle box on the 8 V2 x 11 attachment.
32. Revise the routing of the 12" diameter storm drains from the four biofiltration areas
north of the easterly stormwater detention/infiltration system to connect upstream of
the baffle box. See comment above.
33. Provide a 3" diameter outlet from the bottom of both stormwater detention/infiltration
systems to the storm drain system to provide positive drainage of the storage
system.
34. Revise the finish grading, basin ridges, and SWMP to drain all of the outdoor sales
area to the biofiltration area A34.
Grading/Earthwork:
35. Revise the finish grading, basin ridges, and SWMP create a ridge along the easteriy
side of the fuel islands and so that all runoff drains into the biofiltration area to the
west (Drainage Study Exhibit DM-2).
36. Revise the finish grading of the biofiltration area west of the fuel islands. The curb
break and C2 inlet (Drainage Study Exhibit DM-2) locations as shown, do not utilize
the north half of the biofiltration area.
37. Revise earthwork quantities as needed to include any remedial grading to address
potential settlement ofthe existing undocumented fill.
Utilities:
38. Provide a letter from the City of Vista acknowledging the proposed relocation of the
Buena Sanitation District 12" ocean outfall line. Contact Larry Pierce (760) 726-1340
Ext. 1332.
39. Show the existing 15" sanitary sewer pipeline, in addition to the portion of the
existing sewer proposed for relocation, and indicates the depth of cover over the
sewer pipeline. The existing sewer is constructed of vitrified clay pipe which may
need replacement if the depth exceeds the limit of vitrified clay pipe. Calculations
showing earth load over the existing pipe shall be submitted. If the cover depth is
shown to be detrimental to the existing sewer pipeline then recommendations shall
be submitted on how this will be handled.
40. Show or call out a casing pipe around the sewer pipelines for a distance of at least
10' on either side of the retaining wall footing along the south boundary of the site.
41. Add typical section(s) as needed to show the vertical and horizontal relationship
between the proposed retaining wall footing in the southwest corner of the site and
the existing sewer line, parallel with and southeriy of the retaining wall, within the
property.
42. Demonstrate access for maintenance purposes to the existing sewer manhole south
of the proposed retaining wall along the south boundary of the site.
GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-07/SUP 09-08 - PALOMAR COMMONS
December 22, 2009
Paqe 8
43. Provide details and cross sections as needed showing how the proposed 66" storm
drain terminates at the south boundary of the site. Reference San Diego Regional
Standard Drawings D-40 and/or D-41A. Demonstrate access for maintenance
purposes. See comment above regarding access to sewer manhole. If any work is
proposed off-site in this area, provide a letter from the southeriy property owner
agreeing in concept to the proposal.
44. Show the discharge line for the existing CMWD pressure reducing station located on
the southeast corner of Palomar Airport Road and El Camino Real connected to the
proposed storm drain system. Contact William Plummer at (760) 602-2768.
45. Show the location of existing and proposed recycled water pipelines and meters from
the existing 20" and 18" recycled water pipeline in El Camino Real. A recycled water
service line was installed to the property. Landscaping will need to use recycled
water for irrigation which will require approved plans from CMWD and the County
Department of Environmental Health.
46. Show the location of existing and proposed potable water pipelines and meters in El
Camino Real and Palomar Airport Road and onsite for fire service and potable uses.
Traffic:
45. Figure 2-2 (page 2-4): The lane configuration should be revised for the west approach
(eastbound traffic) for the intersection of Palomar Airport Road (PAR) and Loker Avenue
West.
46. Figure 2-4 (page 2-8): The traffic volumes should be revised for the north approach
(southbound traffic) for the intersection of PAR and Faraday Avenue.
47. Table 2-2 (page 2-11): ICU results for the intersection of PAR and Melrose Drive should
be consistent with 2009 Traffic Monitoring Program. The volumes in this document are
adjusted for the southbound right turn movement to reflect overiap phasing that serves
this southbound right turn traffic. No mitigation is necessary for the existing conditions
with the revised ICU results reflecting adjusted volumes.
48. Figure 3-2 (page 3-5): The trip distribution looks defensible. However, the report should
consider re-distributing trips off of 1-5 and east on PAR while allocating more trips in the
residential neighborhood to the southwest section ofthe study area.
49. Figure 3-4 (page 3-7): The title should be revised to state Average Daily Traffic Volumes
50. Table 4-2 (page 4-6): ICU results for the intersection of PAR and Melrose Drive should
be consistent with 2009 Traffic Monitoring Program. The volumes in this document are
adjusted for the southbound right turn movement to reflect overiap phasing that serves
this southbound right turn traffic. No mitigation is necessary for the existing conditions
with the revised ICU results reflecting adjusted volumes.
51. Table 5-2 (page 5-12): Delay results for the intersection of PAR and Melrose Drive
should be revised to reflect the proposed eastbound right turn lane. All future scenarios
should have this right turn lane included in the analyses. The note at the bottom of the
page should be reflected to eliminate the need to mitigate existing conditions.
GPA 09-07/ZC 09-08/SDF^-05/CUP 09-07/SUP 09-08 - PALOI\^ COMMONS
December 22, 2009
Paqe 9
52. Table 5-3 (paqe 5-13): Delay results for the intersection of PAR and Melrose Drive
should be revised to reflect the proposed eastbound right turn lane. All future scenarios
should have this right turn lane included in the analyses. The note at the bottom of the
page should be reflected to eliminate the need to mitigate existing conditions. The note
will need to include a mitigation measure for the proposed southbound dual right tum
lane if this project has a significant traffic impact to this intersection.
53. Fiqure 6-5 (paqe 6-10): No mitigation is needed for existing conditions at the
PAR/Melrose intersection, so this graph should be re-labeled Near-Term with
appropriate mitigation identified. The Buildout scenario for the PAR/Melrose intersection
should include a dual right-turn lane.
54. Table 6-2 (paqe 6-11): Note 2 at bottom of page should be revised to reflect any Near-
Term mitigation measures that are required.
55. Table 6-3 (paqe 6-12): Note 2 at bottom of page should be revised to reflect any Near-
Term mitigation measures that are required.
56. Page 8-1: The Conclusions and Recommendations section of the report should be
revised to reflect the Near-Term and Buildout mitigation measures needed at the
intersection of PAR/Melrose.
57. Page 8-2: The LOS analysis performed on PAR/ECR should be revised to reflect Arrival
Type=1 for existing conditions. This may lead to mitigation measures required to operate
this intersection in coordinated mode to reflect Arrival Type=6. Specifically, traffic signal
telecommunications equipment is needed to link the PAR/ECR intersection to the Traffic
Management Center (TMC) at the Faraday Center. The equipment is basically a CCTV
camera and wireless transreceiver.
58. Page 8-3: Identify the dual right-turn lane at the intersection of PAR/Melrose as a Near-
Term mitigation measure if necessary.
59. ICU Analvsis (several pages): The worksheets need to be revised for intersection #11
(PAR/Melrose) to reflect the notes above.
60. HCM Analvsis (several pages): The worksheets need to be revised for intersection
#8 (PAR/ECR) to reflect the notes above. Specifically, the intersection at PAR/ECR
is currently operating in FREE (un-coordinated) mode. Since platoons at all
approaches to this intersection arrive from coordinated traffic signals the progression
through this intersection is very poor. This situation reflect Arrival Type 1: Dense
platoon, containing over 80% of the lane group volume, arriving at the start of the red
phase (represents very poor progression quality). The Arrival Type 5 would reflect
this intersection if it was operated in coordinated mode. Before this can be done, this
intersection needs to be linked to the proposed TMC located in the Faraday Center.
Staff proposes using a wireless link and closed circuit television (CCTV) camera to
monitor traffic flow before operating this intersection in coordination.
Street Improvements:
61. Revise the Palomar Airport Road and El Camino Real right of way to provide 10'
from face of curb to the future right of way. Add additional right of way at entrances
GPA 09-07/ZC 09-08/SDP 09-05/CUP 09-07/SUP 09-08 - PALOMAR COMMONS
December 22, 2009
Paqe 10
as necessary to include curb ramps. Revise the grading as needed to provide 4.5' of
parkway behind the sidewalk within the right of way.
62. Revise the site plan to show the proposed northbound El Camino Real dual left turn
lanes.
63. Add a note referencing in general the proposed traffic signal upgrade at El Camino
Real ad Palomar Airport Road.
64. Add a note referencing in general the proposed traffic signal installation at the project
entrance along Palomar Airport Road.
Other:
65. Revise callouts to Parcel A and Parcel B on all documents and plans. Parcel A and
Parcel B are described in the title report as being a portion of Lot G of Rancho Agua
Hedionda Map No. 832, not Parcels A and B of Map 832, or Parcels A and B of
Parcel Map 832.
66. Clarify what portion of the North County Animal Shelter CUP 03-21, Parcel B
described in the title report, is proposed for inclusion in this project and what portion
is excluded. Discuss how maintenance of the common areas and implementation of
the SWMP for this project will be accomplished for any portion within CUP 03-21.
67. See the enclosed letter of May 8, 2008 from County of San Diego Solid Waste
Management Enforcement Agency regarding the previously proposed project.
Please address and comply with appropriate requirements outlined in that letter.
68. Provide a letter from the southeriy property owner agreeing in concept to the
proposed off-site improvements shown at the southeast corner of the site adjacent to
El Camino Real.
69. Provide cross sections approximately every 100 feet along the southeriy property line
showing the relationship of the proposed retaining wall to the existing off-site slope
and or retaining wall. If any work is proposed off-site in this area, provide a letter
from the southeriy property owner agreeing in concept to the proposal.
70. Coordinate fire protection and access with Carlsbad Fire Department. Contact
Dominic Fieri at (760) 602- 4664.
71. Additional comments may be developed during subsequent review of a complete
submittal.
72. A redlined check print of the site plan, the drainage study and SWMP is enclosed for
the applicants use in making the requested revisions. Please return this check print
and the enclosed copies of the drainage report and SWMP to facilitate continued
staff review.
Landscape:
Please make the following corrections to the plans so that they will meet the requirements of the
City of Carlsbad's Landscape Manual.
GPA 09-07/ZC 09-08/SDF^-05/CUP 09-07/SUP 09-08 - PMOU^ COMMONS
December 22, 2009
Page 11
Numbers below are referenced on the red line plans where appropriate for ease in locating the
area of the comment concern.
1. Plans are too conceptual to provide an appropriate review. One symbol is used for all
shrubs and ground covers which may be very different in size and character and one
symbol is used for many trees. Please provide a separate symbol for each type of shrub
and tree (i.e. large evergreen shrub/tree, medium size shrub/tree, small flowering accent
shrub/tree, etc.) and ground covers. Final comments are reserved pending receipt of
more complete plans.
2. Please address landscaping of all graded off-site areas. Check all sheets.
3. Please coordinate landscape plans with civil and architectural plans (show and address
landscaping of retaining walls along the south property line, coordinate grades/slopes at
retention system at the southwest corner of the site, coordinate tree wells in parking lot,
etc.).
4. Please show and label all easements on the landscape plans. Insure no trees are
located within the easements.
5. A retail building appears to be proposed at the west end of the site outside of the
property line. Please explain and show where the new property line will be established
on the west.
6. Please show and label any outdoor public and employee break/eating areas on the
plans.
7. Generally identify all existing woody plant material to be removed or retained. Trees
over 12" in caliper diameter shall be identified on the plan individually as to caliper size
and type and labeled to be retained or removed. It is noted that there are many existing
trees and palms on site. Please fully address.
8. Please indicate the approximate proposed quantities of shrubs.
9. The water conservation plan shall demonstrate to the City how the proposed
development will use all practical means available to conserve water in the landscape.
Landscape design shall include water conservation as a primary criterion. Plans
propose the use of zone 1 and 2 plantings with no zone 3 or 4 plantings. Please revise
plans addressing water conservation as a primary concern by incorporating large areas
of zone 3 and 4 plantings.
10. Please show bio-swale plantings in the biorswale.
11. Landscaping consipting of ground cover, shrubs, and trees shall be used to screen
elements of unsightliness and screen/soften new improvements. Landscaping shall be
used to accentuate and enhance architecture. Planting to include screen trees and
shrubs is needed along the south side of the project to soften, screen and enhance
views of the large Lowe's building from the south. Additional plantings are also needed
in the areas as outlined below to meet the above requirements:
a. North, east, and west sides of Lowe's building.
GPA 09-07/ZC 09-08/SDPt5?-05/CUP 09-07/SUP 09-08 - PALOMXR COMMONS
December 22, 2009
Paqe 12
b. North, east and south sides of the retail building on sheet L-1.1.
c. West side of the drug store building.
Please address all areas.
12. A project of this scale should incorporate specimen size box trees to enhance the overall
project site; site and building entries; and other focal points. It is strongly recommended
that 36", 48", and 60" box trees be used at strategic points to enhance the project.
Please address.
13. Landscape elements over 30" in height (including planting measured at maturity) are not
allowed at street corners within a triangular zone drawn from two points, 25' outward
from the beginning of curves and end of curves. (See Appendix C.4 of the Landscape
Manual). The same height limitation applies at driveways 25' from the edge of the apron
outward along the curb then 45-degrees in toward the property. Please show and label
all sight lines and insure no conflicts with requirements.
14. The proposed palms are very different in character. Please provide a different symbol
for each so it is clear where each type might be used. See comment number 1 above.
15. It is not clear where accent paving is proposed. Please clarify with more differentiating
symbols and plan labeling.
16. All utilities are to be screened. Please show and label all known utilities and provide
appropriate screening. Please also locate all light poles on the landscape plans and
insure that there are no conflicts with trees.
17. Provide a minimum of one tree for every 40' of street frontage. Trees may be planted on
center or grouped. Locate street trees:
a. A minimum of 3' outside the public right-of-way.
b. A minimum of 5' from paving.
c. A minimum of 7' from any sewer line.
d. Not in conflict with public utilities.
e. Not to be allowed on street corners within a triangular zone drawn from two
points, 25' from the beginning of curves and end of curves or within sight lines as
described under "Sight Distance" above. (See Appendix C.4).
18. The specific trees creating a streetscape theme have been pre-selected by the City.
Each theme shall be made up of four (4) types of trees: "Theme", "support", "Median",
and "Project Identity/Accent Trees". (See Appendix C)
Tree Type % of Total Streetscape Trees
(includes street tree requirement plus adjacent setbacks):
a. Median Island Trees N/A
(These trees shall be installed as part ofthe required street improvements)
b. Theme Trees 50%
(These trees set the overall character of the streetscape and are located along the
roadside but outside the right-of-way (See D.3-1.2-3)
c. Support Trees 30%
GPA 09-07/ZC 09-08/SDf^-05/CUP 09-07/SUP 09-08 - PALOM^ COMMONS
December 22, 2009
Paqe 13
(These trees were selected to complement the theme tree. Select trees from those
listed which fit the project site conditions.)
d. Project Identify/Accent Trees 20%
(These trees are not pre-selected; rather the applicant can choose the best tree for their
project and submit it for City approval. The project shall incorporate a theme similar to
the southeastern corner of Palomar Airport Road and El Camino Real to provide
continuity.)
See the appendix of the Landscape Manual for specific trees to be used on Palomar
Airport Road and El Camino Real. Due to problems with anthracnose, Platanus
acerifolia is not to be used on El Camino Real. Please specify Platanus racemosa.
19. Trees shall be provided at the minimum rate of one per every four parking stalls. Trees
pertaining to this requirement shall be located within the parking area, exclusive of
parking lot setbacks. The trees shall be located in close proximity to the spaces they
are to shade. Please provide additional trees to meet this requirement.
20. There are very tall retaining walls on parts of the site. Plan notes indicate that 75% of
the walls will be screened at plant maturity. Please further address how this will be
accomplished by showing a typical detail of the proposed plantings at walls. It is
recommended that plantable walls be installed.
21. Planting or any combination of planting, mounding, and decorative walls shall be used to
provide screening from adjacent property or streets of the parking area to a height of 3'.
Please cleariy show locations of screen shrubs that address this requirement on the
plans.
22. At least three percent of parking areas shall be planted and maintained with trees or
approved shrubs. The plantings shall be contained in planting areas with a minimum
dimension of 4' and bounded by a concrete or masonry curb of a minimum of 6" in
height. The plantings shall be located throughout the off-street parking areas in order to
obtain the maximum amount of dispersion. Please provide a calculation proving the
percentage of landscape area provided in the parking area.
23. The recycled water exhibit has been forwarded to Public Works Maintenance and
Operations for review. Any comments will be returned to the applicant.
24. Please add the following notes to the plans and address the requirements on the plans:
Slopes 6:1 or steeper requiring erosion control measures as specified herein shall be
treated with one or more of the following planting standards:
a. Standard 1 - Cover Crop/Reinforced Straw Matting:
Cover crop shall be a seed mix typically made up of quick germinating and fast
covering grasses, clovers, and/or wild flowers. Submit the specific seed mix for
City approval prior to application. The cover crop shall be applied at a rate and
manner sufficient to provide 90% coverage within thirty (30) days.
Type of reinforced straw matting shall be as approved by the city and staked to
the slope as recommended by the manufacturer.
GPA 09-07/ZC 09-08/SDP'D^-05/CUP 09-07/SUP 09-08 - PALOMM COMMONS
December 22, 2009
Paqe 14
Reinforced straw matting shall be required when planting occurs between August
15 and April 15. The cover crop and/or reinforced straw mat shall be used the
remainder of the year.
b. Standard 2 - Ground Cover:
One hundred (100%) percent of the area shall be planted with a ground cover
known to have excellent soil binding characteristics (planted from a minimum
size of flatted material and spaced to provide full coverage within one year).
c. Standard 3 - Low Shrubs:
Low spreading woody shrubs (planted from a minimum of 2-3/4 inch liners) shall
cover a minimum of seventy (70%) percent of the slope face (at mature size).
d. Standard 4 - Trees and/or Large Shrubs:
Trees and/or large shrubs shall be (planted from a minimum of 1 gallon
containers) at a minimum rate of one (1) per two hundred (200) square feet.
Slopes-6:1 or steeper and:
a. 3' or less in vertical height and are adjacent to public walks or streets require at
minimum Standard #1.
b. 3' to 8' in vertical height require Standards #1, #2 and #3.
c. In excess of 8' in vertical height require Standards #1, #2, #3, and #4.
Areas graded flatter than 6:1 require Standard #1 (cover crop) with temporary irrigation
when they have one or more of the following conditions:
a. Sheet graded pads not scheduled for improvements within 6 months of
completion of rough grading.
b. A potential erosion problem as determined by the City.
c. Identified by the City as highly visible areas to the public or have special
conditions that warrant immediate treatment.
25. RETURN REDLINES and provide 2 copies of all revised plans (concept, water
conservation, and colored water use plan) for the next submittal.
Police Department:
Please see attached correspondence from the Police department.
o o
Hofman
Planning & Engineering
Planning Civil Engineering Fiscal Services Coastal RECEIVED
NOV 2 0 2009
November 19, 2009 CITY OF CARLSBAD
Don Neu PLANNING DEPT
Planning Director
City of Carlsbad
1635 Faraday Avenue
Carisbad, CA 92008-7314
Dear Mr. Neu:
The following submittal for a General Plan Amendment (GPA), Zone Change (ZC), Site
Development Plan (SDP), Special Use Permit (SUP) and Conditional Use Pemiit (CUP)
at 6111 El Camino Real is being made without the signature of the County of San
Diego, the lands owner. The signed applications will be submitted to the City of
Carisbad no later than Tuesday November 24, 2009. If at that time the final application
cannot be provided, all submittal materials will be picked up.
Sincerely,
Bill Hofman
President
3152 Lionshead Avenue • Carlsbad • CA 92010 • (760) 692-4100 • Fax: (760) 692-4105
c Q FILE COPY^.,
City of Carlsbad Planning Department
July 7, 2009
Hofman Planning and Engineering
3152 Lionshead Avenue
Carlsbad, CA 92010
SUBJECT: PRE 09-05 - PALOMAR AIRPORT COMMONS
APN: 213-020-18-00
Thank you for submitting a preliminary review for a 105,543 square foot home improvement
store and 35,000 square feet of retail space in four separate buildings a commercial project
proposed at the southwestern corner of Palomar Airport Road and El Camino Real. The 16.1
acre project site was previously occupied by the Olympic Resort and is currently under
demolition.
In response to your application, the Planning Department has prepared this comment letter.
Please note that the purpose of a preliminary review is to provide you with direction and
comments on the overall concept of your project. This preliminarv review does not represent
an in-depth analvsis of vour proiect. It is intended to give vou feedback on critical issues
based upon the information provided in vour submittal. This review is based upon the
plans, policies, and standards in effect as of the date of this review. Please be aware that
at the time of a formal application submittal, new plans, policies, and standards mav be
in effect and additional issues of concern may be raised through a more specific and
detailed review.
Planning:
General
1. General Plan and Zoning designations for the property are as follows:
a. General Plan: Travel/Recreation Commercial (T-R).
b. Zoning: Tourist Commercial with a Qualified Development Overiay zone (C-T-
Q).
c. The property is not located within the Coastal Zone.
2. The project requires the following legislative and discretionary permits:
a. General Plan Amendment to change the Land Use designations of the property
from Travel/Recreation Commercial (TR) to General Commercial. The General
Commercial Land Use designation does not presently exist and will ;need to be
created through a General Plan Amendment application.
b. Zone Change from Tourist Commercial, Qualified Development Overiay Zone
(CT-Q) to General Commercial with a Qualified Development Overiay Zone (C-2-
Q).
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us
PRE 09-05 - PALOMAR AIRPORT COMMONS
July 2, 2009
Paqe 2
c. Local Facilities Management Zone Plan Amendment (Zone 5) (if it is determined
that the proposed land use would increase demands on facilities). A facilities
analysis to determine if there are any increased demands on services to the site
with the proposed land use change will need to be provided.
d. Site Development Plan (because the project site would be zoned with a Qualified
Overiay Zone (Q) and is located within the Airport Influence Area)
e. Special Use Permit because the property is located in Area 4 of the El Camino
Real Scenic Corridor.
f. Conditional Use Permits for drive-through facilities.
Project issues:
1. Please be advised that in order to make a more in-depth review of the proposed
development, a more complete design of the project is required. The exhibits submitted
are incomplete and staff is unable to perform a complete review. Once complete
information is presented, staff may identify additional comments or concerns.
2. Because of the proposed Land Use change, the project will need to be submitted to the
San Diego Regional Airport Authority for review and determination of consistency with
the Airport Land Use Compatibility Plan, McClellan-Palomar Airport (ALUCP). Unless
the project is submitted to the City and determined to be a complete application prior to
the adoption of new proposed Airport Land Use Compatibility Plan by the Regional
Airport Authority, the project will be subject to the new Airport Land Use Compatibility
Plan. This plan may be more restrictive relative to the permitted land uses on the
subject property. City Staff will submit the application to the Authority once a formal
application is filed. Per the current Airport Land Use Compatibility Plan, commercial
development is determined to be "compatible" within the 60-65 dB CNEL noise contours
which affect the site.
3. The project shall coordinate with the County of San Diego Solid Waste Local
Enforcement Agency and comply with California Code of Regulations Title 27, Section
21190 as the project site is located within 1,000 feet of a landfill.
4. Pursuant to C.I of the Commercial Land Use Program of the General Plan, the project
shall be required to submit an Economic Viability study (Market Study) for this new
commercial land use.
5. A Lowe's is defined as a community anchor tenant by the Land Use Element of the
General Plan. Pursuant to the Commercial Land Use Policy C.6 of the General Plan, no
community "anchor" tenant may be built as a stand-alone building. It must share (or
appear to share) walls and its building facade with other tenants in the center.
Accordingly the project must be designed to address this requirement, or the General
Plan Amendment to create a new General Commercial Land Use designation must
address this issue.
6. Neither community "anchor" tenants nor secondary tenants may feature corporate
architecture or logos (excluding signs).
7. Outdoor storage of goods and products in shopping centers is expressly not allowed.
PRE 09-05 - PALOMAR AWORT COMMONS W
July 2, 2009
Page 3
8. All commercial developments shall provide a variety of courtyards and pedestrian ways,
bicycle trails, landscaped parking lots, and the use of harmonious architecture in the
construction ofthe buildings (comprehensive design theme).
9. The City is very concerned about the aesthetics of the proposed Lowe's building and
particulariy the eastern elevation (Garden side). The screening of this elevation at other
Lowes sites varies from open fencing to a solid stucco wall depending on location.
Some locations even have materials on pallets stacked higher than the height of the
building. This elevation also includes the loading area which will need to be screened as
viewed from El Camino Real. This elevation will need to be of superior architectural
design and all uses appropriately screened as it faces El Camino Real, a designated
scenic corridor.
10. The building design and architecture should also take into account the adjacent Viasat
buildings to the south. All building elevations should be architecturally enhanced and
rooftop mechanical equipment screened to reduce the visual impacts to adjacent
properties.
11. The required minimum parking setback along the El Camino Real frontage is 25 feet as
measured from the property line. Please provide dimensioned setbacks on the plans.
12. The preliminary site plan does not show grading, yet the inclusion and notes to retaining
walls and sloped driveway transitions identifies potential grading issues. The site shall
be designed to eliminate or minimize the need for retaining walls and sensitivity to
adjacent properties shall be considered in perimeter retaining wall heights and materials
if needed.
13. Planning has a concern regarding the appropriateness of the proposed tire store use at
this visually prominent location and encourages the reconsideration of this proposed
use.
14. The shopping center appears to be requesting a reduction in parking for common
parking facilities. The Zoning Ordinance (Section 21.44.050(a)(5)) does provide a
process to obtain up to a 15% reduction of parking for common facilities.
15. The parking plan does not show the requisite number of trees per sparking space
pursuant to the City's Landscape Manual. Please revise the site plan to include
additional landscape islands with trees and landscaping within the parking field to
visually enhance and screen the parking area. A landscape planter should be provided
for every 12 to 15 parking stalls along the perimeter parking area and planters dispersed
throughout the parking lot.
16. The area noted on the plans for 10x20 parking will not provide 20 foot deep parking
stalls.
17. Compact parking shall be located in close proximity to the facility they serve so as to
encourage their maximum usage (CMC 21.44.110). The compact spaces shown are
located furthest from the building which does not encourage their use. Up to 25% of
required parking spaces may be compact spaces.
18. The site plan does not show the location of trash enclosures. Trash enclosures shall
meet the Engineering GS-16 design standard.
z o
PRE 09-05 - PALOMAR AlRPORT COMMONS
July 2, 2009
Page 4
19. There is an existing trail easement on the property to the south, CT 80-27 (Map No.
9973) which could be utilized to provide pedestrian access to the site. The easement
should be researched to determine the disposition of the easement.
All necessary application forms, submittal requirements, and fee information are available at the
Planning counter located in the Faraday Building at 1635 Faraday Avenue or on line at
www.carisbadca.qov. You may also access the General Plan Land Use Element and the
Zoning Ordinance online at the website address shown; select Department Listing; select
Planning Home Page. Please review all information carefully before submitting.
Engineering:
Engineering Department staff has completed a preliminary review of the above subject. Prior to
formal application submittal, it is suggested the following items are adequately
resolved/addressed:
1. Please be advised that in order to make a more in-depth review of the proposed
development, a more complete design of the project is required. The exhibits submitted
are incomplete and staff is unable to perform a complete review. Once complete
information is presented, staff may identify additional comments or concerns.
2. Please clarify if a subdivision is proposed as part of this application. The exhibits callout
"parcel" areas, but staff is unsure if these will be lease boundaries or proposed lots as
part of a subdivision. This will impact the type of discretionary applications required for
this project. Please coordinate further with staff prior to submittal.
3. Circulation is a significant staff concern on this project. Along Palomar Airport Road, the
proposed signalized intersection does not meet City standard intersecfion spacing
requirements for a prime arterial. In order to address this, please consider shifting the
signalized entry west and possibly incorporating the signalized entrance with the animal
shelter entryway. Refer to comments from traffic for more information. Staff supports the
deceleration lane for the signalized entry, however, the acceleration lane appears to
raise conflicts for merging/weaving vehicles so close to the intersection of El Camino
Real (ECR) and Palomar Airport Road (PAR). Please evaluate operational impacts of
the proposed acceleration lane with existing PAR. Please redesign the frontage access
for this project along PAR and coordinate with staff prior to submittal.
4. The two new driveways along ECR are not supported as they do not meet City driveway
spacing standards. The existing driveway may remain, however, due to the proximity to
the intersection of two prime arterials, no left turns will be permitted on northbound ECR
into this project. The existing left turn pocket must be removed with this project. On
southbound ECR, consider installing a deceleration lane for the project entry driveway
so traffic can pull off and enter the project without impacting traffic flow on ECR. Please
redesign the frontage access for this project along El Camino Real and coordinate with
staff prior to submittal.
5. Revise the exhibits to show the proposed dual-left turn lanes that are required for
northbound ECR at the intersection with PAR. Please refer to the previous discretionary
application for these improvements.
ORT COMMONS W
July 2, 2009
Paqe 5
6. Indicate the line-of-sight at the driveway entrance looking west onto PAR using Caltrans
guidelines (corner sight distance). Revise the exhibits to address conflicts that result
from the entry monuments. Refer to engineering redlines.
7. Refer to the attached June 23, 2009 City Engineer memo and the June 16, 2009 Doug
Bilse memo for additional comments on traffic and circulafion.
8. Revise the exhibits to show existing and proposed sidewalk improvements along the
frontage with ECR and PAR. It appears the proposed monument signs along PAR
would conflict with sidewalk improvements. Refer to engineering redlines.
9. Prepare and submit the Storm Water Standards Questionnaire to determine project
status as it relates to water quality. From staff cursory review, this project may be
deemed a priority development project. If so, as part of the discretionary applications,
the applicant must prepare a Preliminary Storm Water Management Plan (SWMP) per
the City of Carisbad Standard Urban Stormwater Management Plan (SUSMP). The
SWMP must address all elements per the SUSMP to the satisfaction of the City
Engineer.
10. Revise the exhibits to incorporate all water quality measures (treatment control and Low
Impact Design (LID) measures), identified in the Preliminary Storm Water Management
Plan (SWMP). Please note that up-coming hydromodification requirements may result in
additional onsite infiltration/detention compared to current standards. Prior to submittal
please check on current water quality requirements. Please visit
www.proiectcleanwater.orq and the City website for more information.
11. There are significant internal traffic circulafion issues identified on the engineering
redlines. Please redesign what appears to be a 6-way intersection with excessive
conflicts for motorists. Please consider relocating the loading area for the Lowes so it
does not interfere with the internal intersection. Also redesign the bank ATM exit so it
does not compete as another intersection movement. The intemal circulation must
operate efficiently to limit unnecessary congestion. Additional comments may arise
upon submittal of a revised layout.
12. Revise the exhibits to provide topography so staff can evaluate changes in grade and
drainage patterns for the project. Show storm drains, inlets, LID, detention areas, etc.
Since there is no grade information, the feasibility of the project layout cannot be
evaluated by staff.
13. Revise the exhibits to show the existing storm drains that discharge near the northwest
corner of the property. Show the drainage improvements necessary to convey this water
and revise site design layout as necessary.
14. Identify the grade changes over the existing sewer trunk main and provide evidence the
service agency does not object to this project.
15. Prepare and submit, as part of the discrefionary applicafions, a preliminary hydrology
study that identifies the development discharge flows and preliminary recommendations
on the anticipated storm drain infrastructure required as part of the development.
16. Provide a preliminary Geologic/Geotechnical study, as part of the discretionary
applications, that identifies feasibility and recommendations for the proposed
PRE 09-05 - PALOMAR AIRPORT COMMONS
July 2, 2009
Paqe 6
development as it relates to the site. Include measures necessary to stabilize the site for
development including limits/extent of remedial grading required, if any.
17. Indicate the volume of grading (cut, fill, import, export, remedial) proposed for the project
in cubic yards. Based on staff preliminary review, a grading permit will be required for
this project.
18. Revise the exhibits to cleariy show the both existing and proposed street improvements,
plus transitions, required for PAR and ECR per Engineering Standards. The exhibits
indicate that some offsite road improvements may be required, but are not cleariy
shown. Refer to engineering redlines for clarification.
19. Revise the exhibits to show the size and type of drainage facility required to collect and
convey storm runoff through this project. Refer to the previous discretionary application
plans for design flow informafion. The preliminary hydrology study for this new project
should address the sizing and design criteria for this facility.
20. Revise the plans to include a typical street section of PAR and ECR that indicate
exisfing and proposed improvements (pavement, curb, gutter, sidewalk, centeriine,
street lights, fire hydrants, etc.).
21. Revise the exhibits to indicate all exisfing and proposed ufilities along PAR and ECR
(i.e., storm drain, water, recycled water, sewer, etc.) that will serve the development.
Indicate gravity flow of sewer facilities via invert elevations. The submitted plan does not
depict any facilities; therefore, the feasibility of the project layout cannot be evaluated by
staff.
22. Depict a preliminary alignment for all proposed onsite sewer, water and storm drain
facilities and all their appurtenances (access holes, valves, fire hydrants, blow-offs, air-
release valves).
23. Meet with the Fire Department to identify the necessary fire protection measures
required for this project (access, fire hydrants, sprinklering, etc.). All proposed fire
hydrants must be served by public water mains.
24. It appears that outdoor storage or loading for Lowes is located on the south side of the
building and that it will also be controlled by gates. If this will not be open for general
circulation, obtain approval from Fire Department that using gates will be permitted as
they tend to impede emergency, fire and day-to-day vehicular access.
25. Revise the exhibits (or provide a separate exhibit, if it makes it too cluttered) to show the
loading truck circulation into, through and exiting the site. Show turning radii (inside and
outside tracks) for 60-ft trucks per Caltrans design standards (Figure 404.5B). Revise
the exhibits to address any conflicts that result from the truck turning movements.
26. In addition to the 60-ft truck radii, for the remainder of the project, show (fire/trash) truck
turning radii (per Caltrans 404.5F) with a 42-foot turning radius will circulate throughout
the site. Show the inside and outside tire tracks. Revise the exhibits to address any
conflicts that result from the truck turning movements.
27. Ensure the corner parking stalls include a 5-foot offset to allow cars to back-up in the
event the other car overhangs the stall.
ORT COMMONS W
July 2, 2009
Paqe 7
28. A public improvement plan will be required for the public street and onsite waterline
improvements and any other improvements proposed within City right-of-way or public
easements.
29. Provide multiple cross-sections of the site to demonstrate differences in grade,
especially as it relates to adjacent properties.
30. Add symbols to the plans to identify the difference between existing and proposed
improvements. Revise the exhibits to depict the location of existing adjacent buildings
and surface improvements.
31. Indicate all exisfing and proposed surface improvements (curb, gutter, sidewalk, paving,
access-holes, inlets, power poles, street lights, adjacent driveways, vaults, transformers,
etc.) along the property fronting PAR and ECR, and verify that no conflicts exist.
32. Revise the exhibits to show sidewalk improvements for pedestrian circulation from the
public roads into the project amenifies.
33. Indicate the slope of the proposed driveways as they approach PAR and ECR. Revise
the design to incorporate vertical curves at all significant grade breaks to ensure
vehicular clearances are maintained.
34. Meet with NCTD to determine any required facilities they may require to serve this
project (i.e.: bus turn-outs, etc.).
35. Please provide evidence that the adjacent County Animal Shelter does not object to the
rearrangement of access proposed with this project.
36. Identify the distance from the driveway along ECR to the intersection of PAR.
37. Revise the exhibits to indicate the ADT (traffic), EDU's (sewer), GPM (potable water),
and GPM (reclaimed water) generated or required by the proposed development.
38. Depict the location of trash enclosures required to serve the development. Call-out
enclosures per Carlsbad Standard drawing GS-16. Identify how refuse • trucks will
maneuver throughout the site.
39. As part of discretionary submittal, a recent Preliminary Title Report (PR) issued within 6
months of formal application submittal will be required for the proposed project. If there
are exisfing easements that are not plotted on these plans, there may be significant
changes to this proposed concept in order to avoid conflicts. All easements and
encumbrances as identified in Schedule "B" of the PR must be indicated on the site plan.
The future disposition of any easements and encumbrances must also be identified.
40. Revise the exhibits to show the complete property boundary including all bearings
distances, and curve data.
An engineering redlined check print is enclosed for the applicants use in making the requested
revisions. This check print should be returned with the formal application submittal to
facilitate continued staff review.
PRE 09-05 - PALOMAR AIRPORT COMMONS
July 2, 2009
Page 8
Please see attached Fire Department comments.
If you would like to schedule a meeting to discuss this letter with the commenfing departments,
please contact van Lynch at the number below. You may also contact each department
individually as follows:
• Planning Department comments: Van Lynch, Senior Planner, at (760) 602-4613.
• Engineering Department comments: Jeremy Riddle, Project Engineer - Engineering
Development Services, at (760) 602-2737
• Fire Department comments: Greg Ryan, Fire Inspections, at (760) 602-4663
iincerely.
DON NEU
Planning Director
GTB:VL:sm
Pacific Sports Resort, c/o Brian Elliot, One Lombard Street,San Francisco CA 92111
County of San Diego, Department of Public Works, Airports, 1960 Joe Crosson Drive,
El Cajon, CA 92020-1236
Don Neu, Planning Director
Chris DeCerbo, Team Leader
Jeremy Riddle, Project Engineer
Greg Ryan, Fire Prevention
Bill Plummer, PW - Engineering
File Copy
Data Entry