Loading...
HomeMy WebLinkAboutHDP 02-03; Sacada II; Hillside Development Permit (HDP) (13)The MacKenGe Uroup Entitlement Processing Governmental Coordination Project Feasibility Studies Project Management FAX (160)143-0143 September 19, 2002 RECEIVED Saima Qureshy, Staff Planner Planning Division City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008-7314 SEP 23 2302 CITY OF CARLSBAD PLANNING DEPT. SUBJECT: HDP 02-03 - SACADA II The following comments are in response to the March 25,2002, completeness for processing letter. PLANNING: 1. Provide information on total building areakovered area .......... Response: See sheet CI Provide information on total volume of grading ............ Response: See Grading Plan Sheet GI and Architectural Site Plan C1 Lot area = 13,842 square feet Building footprint = 4,079 square feet Lot coverage = 29.59% 2. No grading is proposed outside the building envelop Cut = 100 cubic yards Fill = 130 cubic yards (garage area) Fill = 180 cubic yards (Lower Level) 3. On elevations, depict the existing grade along with the proposed finished grade and dimension height of the building from existing grade ...................... Response: See Sheet A4 Exterior elevations. ENGINEERING: Response: All comments have been addressed on the site plan/COnCeptUal grading plan. FIRE DEPARTMENT: Fire Suppression Plan. Response: See Sheet Site Plan/ Conceptual Grading Plan page 2. 1518 Palornar Drive, San Marcos, CA 92069 c Page 2 SACADA II ISSUES OF CONCERN 1. 2. 3. The City's Hillside Development Regulation state that natural slopes of over forty percent gradient shall be undevelopable. Response: At a meeting on July 3,2002, it was determined that the area in question was, in fact, illegal fill pushed onto the site when the adjacent residence was constructed. Once the illegal fill is remedied, the slope is less than 40 percent and therefore buildable. There needs to be a clear area of 20' x 20' in each garage for car parking. Response: The steps leading to the main entry have been reduced by 1'-0" to give the proper 20' x 20' clear area for car parking. The proposed project also needs to comply with the Neighborhood Architectural Design Guidelines. The project shall Comply with guidelines 4, 5, 7, 73, and 74 and one guideline from number 7 through 3. Documentation is as follows: Response: Guideline 4---Street Elevation, The street elevation has five (5) changes of plane with the furthest plane being twenty-four (24)feet back from the front plane. See enclosed exhibit. Guideline 5---Rear Elevation, The rear elevation has four (4) changes of plane with the furthest plane being twelve feet, six inches (12'6") back from the front plane. See enclosed exhibit. Guideline 7---Exterior Openings, All windows and doors in this project contain extruded foam shapes of two (2) inches in depth. These will be color coated and painted a contrasting color. Guideline 13/14---Design Elements, The four design elements incorporated into this project are a follows: Arched elements, window and door lintels, varied window sizes and shapes, and columns. Guideline 3---The duplex has incorporated a single-story building edge in the front with a depth of not less than 8 feet with a separate roof plane that is approximately 8 feet lower than the upper story. ENGINEERING: 1. All requested changes have been made to the plan. The check print is included in the submittal package. If additional information is needed, please call me immediately. Sinwrely,