HomeMy WebLinkAboutHDP 03-06; Korte Residence; Hillside Development Permit (HDP) (3)May 12,2004
Mr. & Mrs. Korte
2808 Carrillo Way
Carlsbad CA 92009
SUBJECT: HDP 03-06 - KORTE POOL, SPA, FIREPLACE, AND RETAINING WALL
Dear Mr. and Mrs. Korte:
The Planning Department is in receipt of the revised grading plans, as requested by staff, for the
pool located at 2808 Carrillo Way. At this time, the Planning Department requests that a formal
application for a Consistency Determination be submitted pursuant to Planning Department
Policy 35, attached. Per the policy, please submit the written statements, or other information
as may be required, to explain and justify the request. Please refer to the Policy for the
consistency determination criteria. The determination for consistency will be based on the
ability to make the findings as listed within the policy. A fee of $130.00 is to be collected by the
City upon submittal of the application. Please also find attached the submittal application.
If a determination of consistency is approved, the grading plan DWG 413-48 shall be
construction changed to accurately reflect the revised HDP exhibit. The revisions to the grading
plan shall be submitted, reviewed and approved prior to start of any work in the field reflecting
the revised HDP. The construction change guidelines and submittal requirements can be
obtained from the Engineering Counter. The construction change process typically takes about
30 days to complete.
If you have any questions regarding the above, please feel free to call me at (760) 602-4613, or
John Maashoff, Engineering, at (760) 602-2747.
Sincerely, 1
Van Lynch
Senior Planner
VL: bd
attachments
C: Chris DeCerbo
John Maashoff
John Milbrandt - Building Inspector
Casey Arndt - Engineering Inspector
@ 1635 Faraday Avenue Carlsbad, CA 92008-7314 - (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us