Loading...
HomeMy WebLinkAboutHDP 89-22; Banks Pool; Hillside Development Permit (HDP)City of Carlsbad Planning Department May 31, 1989 Pasco Engineering 535 North Hwy. 101 Sol ana Beach, CA 92075 ATTN: WAYNE PASCO SUBJECT: HILLSIDE DEVELOPMENT PERMIT - HDP 89-22/BANKS POOL, 2740 Argonauta Street APN: 215-400-18 The City has completed a review of the application for a Hillside Development Permit to allow grading for a rear yard pool. It is the Planning Director's determination that the project is consistent with the City's Hillside Development Ordinance, Chapter 21.95 of the Carlsbad Municipal Code and therefore APPROVES the request based on the following findings and conditions. Findings: 1. Hillside conditions have been properly identified on the constraints map which show existing and proposed conditions and slope percentages. 2. Undevelopable areas of the project i.e. slopes over 40%, have been properly identified on the constraints map. 3. All development is designed to minimize grading and alignment of the pool will reduce impact on the slope. 4. No development will occur in the undevelopable portions of the site. 5. The grading design minimizes disturbance of hillside areas. 6. The project design substantially conforms to the intent of the concepts illustrated in the Hillside Guidelines Manual as follows: a) Grading volumes per acre are not exceeded. b) The slopes are contoured and cut slopes do not exceed 30 feet in height. 2O75 Las Palmas Drive • Carlsbad, California 92OO9-4859 • (619) 438-1161 Pasco Engineering May 31, 1989 Page 2 Conditions: 1. All newly created cut and fill slopes must be landscaped and screened from adjoining properties to the satisfaction of the Planning Director. 2. Landscape Plans designed in accordance with the City of Carlsbad Landscape Design Manual shall be submitted for approval prior to issuance of the building permits for the crib walls and swimming pool. 3. Crib walls and retaining walls located on the property must not exceed a maximum of 6'-0" in height at any point along the wall measured from the top of the wall to pre-existing grade at the bottom of the wall. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH:JG/lh hdp8922.1tr