HomeMy WebLinkAboutHDP 90-03; Leigh Residence; Hillside Development Permit (HDP) (2)REPORT OF SITE PREPARATICN AND
POUNDflTICN RECCMMENDflTICNS
PROPOSED SINC3i: FAMILY RESIDENCE
LA COSTA AVENUE
CARLSBAD, CALIFORNIA
PREPARED FOR:
Mr. Bill Leigh
523 Shadow Hills
San Marcos, Califomia 92069
PREPARED BY:
Southem Califomia Soil and Testing, Incorporated
Post Office Box 20627
6280 Riverdale Street
San Diego, Califomia 92120
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6Zaa RIVERDALE ST. SAN DIEBD, CALIF. 92120 • TELE 2aD-4321 • P.O. BOX 20627 SAN OIEGO, CALIF. 92120
67a ENTERPRtSe 3T. ESCONOIOa. CALIF. • TELE 746-45^.4
Noventjer 29, 1989
Mr. Bill Leigh
523 Shadow Hills SCS&T 8921165
San Marcos, Califomia 92069 Report No. 1
SUBJECT: Site Preparation and Foundation Recommendations, Proposed Single
Family Residence, La Costa Avenue, Carlsbad, Califomia.
Dear Mr. Leigh:
In accordance with your request, this report has been prepared to present
site preparation and foundation reconrtendations for a proposed single family
residence, to be located between 2424 and 2440 La Costa Avenue in Carlsbad,
Califomia.
STFE EESCRIPTICN
The subject is legally described as Lot Number 9, La Costa South, Unit
Nunfcer 1; County Assessor's Parcel Number 216-160-09. The lot is a nearly
rectangular parcel with an average width of 76 feet and an average depth of
135 feet. A vacant lot exists to the east, a flag lot exists to the north
with its access on the vvest side of the si±iject lot, and a condominium
conplex exists to the west of the flag lots access way. A house slab that
appears to have been constructed some time ago exists on the flag lot.
The si±)ject lot is vacant of inprovements. It has a relatively level pad
that extends back about 77 feet from the front property line. Numerous piles
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
SCS&T 8921165 Noventser 29, 1989 Page 2
of end-dumped fill exist on the level pad area. North of the level pad, the
lot descends steeply to a lower level that is roughly the same level as the
flag lot. The inclination of this slope varies from about 1.5:1 (horizontal
to vertical) in the upper portion to 1:1 in the lower portion. The height of
this slope is about 28 feet from toe to top. The slope down to the flag
lot's access leg is at a ratio of about 1.5:1.
SOIL DESCRIPTICNS
The subject site has been graded into its present configuration. The upper
portion of the lot contains fill material that appears to have been
imported. This material is located as approximately delineated on the plot
plan included heirewith and consists of a whitish tan, very silty sand/sandy
silt. The maximum depth of the fill appears to be about 10 feet near the
northwest comer of the upper pad. No documentation was provided on the fill
to verify its proper placement, and, our field observations indicated that
it is questionable in regards to being suitable to support structures or to
exist near the face of slopes. Below the fill, as exposed in the natural
portions of the slope below the fill, and on the lot to the east, is a
critically expansive, light chocolate brown, clay topsoil. This material has
desiccation cracks extending at least two feet deep, has a ^popcorn'
texture, and has experienced sloughing and downhill creep v^ere it exists on
sloping ground. This material is very veak vAien wet and does not stand veil
in cut or fill slopes. Below the topsoil are hard mudstones of the Delmar
Formation. This material is exposed in a 1:1 cut made in the lower portion
of the slope. This cut has a maximum height of about 12 to 15 feet. The
mudstones are comprised of light green, sandy to silty clays. These clays
typically do not stand veil in steep slopes and usually require buttressing.
This material is also generally found to be highly expansive. Where these
mudstones exist near the front of the lot, it appears that they may consist
of v^tish tan sandstones.
PROPOSED OCNSTRUCTION
The proposed structure will be a single-story structure with four different
floor levels. The upper two levels will be at elevation 98.94 feet and 95.74
SCS&T 8921165 November 29, 1989 Page 3
feet and will have on-grade concrete floor slabs. The third level down will
be at 91.74 feet and will be a raised wood floor. The fourth and lovrest
level will be at elevation 81.74 feet and will also have a raised wood
floor. An observation deck will be constructed over the lowest level that
will basically be at the same elevation as the third lowest level.
Construction will consist of wood-framing with stucco siding. Shallow
foundations are anticipated and some masonry retaining walls will be
necessary, both for the house and for the east property line. The structure
will cover roughly 50 percent of the lot area.
FPCSPOBED OWDXNS
The proposed grading will basically create three level pads and a 2.5:1
slope extending down from the lower pad to the north property line. All
other slopes will be constructed at a ratio of 2:1 or flatter. The maximum
slope height will be about 20 feet.
CCNCLUSIONS AMD RBCCMMENDATICNS
(324ERAL; Based on our past experience in the vicinity of the subject site
and on the exposed soil conditions as discussed herein, it is our opinion
that the subject site can be developed as proposed, provided the
recommendations presented herewith eure conplied with. Soil conditions that
will create additional construction costs for the proposed residence include
moderately to very highly expansive soils, undocumented fill that will be
required to be recompacted, and relatively weak soils in regards to
foundation and retaining wall design.
SITE PREPARMTCN: Site preparation should begin with the removal of all
vegetation and deleterious materials from the site in the areas to be
graded. The existing fill materials should then be removed and be replaced
as uniformly conpacted fill. Any topsoils, subsoils or disturbed formational
mterial found beneath the fill, or in any other areas on the site, should
SCS&T 8921165 November 29, 1989 Page 4
also be removed and level benches should be cut into the formationcil soils
to support the fills. Further, prior to placing any fill in the lower
portion of the lot, any loose or disturbed soil should be removed and a
level bench mde in the formational soils. The existing cut slope on the
lover portion of the lot should be keyed into in a stair-step manner as the
fill is brought up to finish grade. All areas to support fill should be
scarified to a depth of 12 inches, moisture conditioned and be compacted to
at least 90 percent relative cortpaction.
SDC3PE OCNSTRDCTTON: All slopes should be constructed at an inclination of
two horizontal to one vertical or flatter. All fill slopes should be
backrolled with a sheepsfoot conpacter at vertical intervals of four feet or
less and should be trackwalked v^en conpleted. The very highly ej^)ansive
topsoils should be mixed with the less, expansive soils when placed in fill
slopes such that the mixture will have an expansion index of less than 120.
EARTHWORK: All earthvrork and grading contenplated for site preparation
should be accomplished in accordance with the attached Recormended Grading
Specifications and Special Provisions. All special site preparation
recaimendations presented in the sections above will supersede those in the
Standard Recomnrended Grading Specifications. All errbankments, structiiral
fill and fill should be compacted to at least 90% relative compaction at or
slightly over optimum moisture content. Utility trench backfill within five
feet of the proposed structures and beneath pavements should be conpacted to
minimum of 90% of its maximum dry density. The upper six inches of subgrade
beneath paved areas should be conpacted to 95% of its maximum dry density.
This conpaction should be obtained by the paving contractor just prior to
placing the aggregate base material and should not be part of the ness
grading requirements. The maximum dry density of each soil type should be
determined in accordance with A.S.T.M. Test Method D-1557-78, Method A or C.
DRAINAffi: No surface water should be allowed to pond adjacent to foundations
and surface runoff should not be allowed to flow over the top of the slopes.
SCS&T 8921165 Novenber 29, 1989 Page 5
FOONDflTICNS: Considering the highly expansive soil conditions and a cut/fill
transition within the building pad, all footings that will support the
proposed structure should be founded at least 24 inches below lowest
adjacent grade. When founded on or near slopes, the footings should have a
minimum depth that wDuld result in a horizontal distance of at least seven
feet between the bottom of the footing and the face of the slope. All
continuous footings should have a minimum width of 12 inches and isolated
footings should have a minimum width of 24 inches. Footings may be designed
for an allowable soil bearing pressure of 1500 psf.
FOUMDKnON REINPQRCING: Foundation reinforcing should be determined by the
project structural engineer. Howaver, as a minimum, we reconmend that the
continuous footings be reinforced with at least four No. 5 bars: two located
near the top and two located near the bottom of the footing.
di-GRAIK CCNCREIE SLABS: Slabs-on-grade should be at least five inches thick
and be reinforced with at least No. 3 bars at 12 inches on center each way.
The interior slab reinforcing should be turned down into the perimeter
footings. The reinforcing for exterior slabs that abut footings should be
doveled into the footings. Interior slabs should be underlain by a moistxire
barrier consisting of one inch of clean sand over 6 mil visqueen over four
inches of clean, coarse, poorly graded sand or crushed rock (maximum size
1/2 inch).
MDISTURE CCNDITICNING: The clayey soils should not be allowed to dry out
before placing concrete. They should be kept in a moist condition by
sprinkling when necessary until the concrete is placed. If allowed to dry
out, pre-soaking may be required.
RETAINING WAUJS: Earth retaining walls should be designed for an equivalent
fluid pressure of 50 and 60 pounds per cijbic foot for unrestrained and
restrained walls respectively. These pressures reflect a drained and level
backfill condition. All retaining walls should have a si±drain and have a
12-inch-wide rock or a Miradrain drain that extends up to one foot below the
SCS&T 8921165 November 29, 1989 Page 6
top of the retained soil. A passive pressure of 300 psf per foot of depth
may be used to resist lateral movement. In addition the coefficient of
friction or concrete to soil may be assumed to be 0.30. When carbining
friction and passive pressure, the friction value should be reduced by
one-third.
If you should have any questions after reviewing this report, please do not
hesitate to contact this office.
This opportunity to be of professional service is sincerely appreciated.
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
'7 . ^^,7
Charles H. Christian, R.G.E. #00215
CHC:mw
cc: (4) Submitted
(2) E. Brian Smith
(1) SCS&T, Escondido
i
SCALE 1"=20'
O 10 20 30 40
LEGEND
<C-£2.r5 EXISTING TOPOGRAPHY
APPROXIMATE LOCATION OF DAY LIGHT LME LA COSTA AVENUE
SOUTHIRM CALIFORNIA
^^1^ SOiL A TKSTINQ,INC.
SOUTHIRM CALIFORNIA
^^1^ SOiL A TKSTINQ,INC. ,Y: CHC/WDW DATE: 11-30^89
SOUTHIRM CALIFORNIA
^^1^ SOiL A TKSTINQ,INC.
JOI NUMtER: M21165 PLATE #1
SINC3UE FAMILY RESIDENCE, LA COSTA AVENUE, CARLSBftD
RECCWMENEED GRADING SPBCIFICATICNS - (3MERAL PROVISICNS
GQIERAL nnSSfT
The intent of these specifications is to establish procedures for clearing,
conpacting natural ground, preparing eureas to be filled, and placing and
conpacting fill soils to the lines and grades shown on the accepted plans.
The reconmendations contained in the preliminary geotechnical investigation
report and/or the attached Special Provisions are a part of the Reconmended
Grading Specifications and shall supersede the provisions contained
hereinafter in the case of conflict. These specifications shall only be
used in conjunction with the geotechnical report for which they are a part.
No deviation from these specificatipns will be allowed, except v^ere
specified in the geotechnical report or in other written comnunication
signed by the Geotechnical Engineer.
OBSERVZXnCN AM) TESmC
Southem California Soil and Testing, Inc., shall be retained as the
Geotechnical Engineer to observe and test the earthwork in accordance vdth
these specifications. It will be necessary that the Geotechnical Engineer
or his representative provide adequate observation so that he may provide
his opinion as to whether or not the work was acconplished as specified. It
shall be the responsibility of the contractor to assist the Geotechnical
Engineer and to keep him appraised of work schedules, changes and new
information and data so that he may provide these opinions. In the event
that any unusual conditions not covered by the special provisions or
preliminary geotechnical report are encountered during the grading
operations, the Geotechnical Engineer shall be contacted for further
reconmendations.
(R-9/89)
SCS&T 8921165 November 29, 1989 Appendix, Page 2
If, in the opinion of the Geotechnical Engineer, substandard conditions are
encountered, such as questionable or unsuitable soil, unacceptable moisture
content, inadequate conpaction, adverse weather, etc.; construction should
be stopped until the conditions are remedied or corrected or he shall
recommend rejection of this work.
Tests used to determine the degree of conpaction should be performed in
accordance with the following American Society for Testing and Materials
test methods:
Maximum Density & Optimum Moisture Content - ASTM D-1557-78.
Density of Soil In-Place - ASTM D-1556-64 or ASTM D-2922.
All densities shall be expressed in terms of Relative Compaction as
determined by the foregoing ASTM testing procedures.
PREPARATICN OF AREAS TO RECEIVE FILL
All vegetation, brush and debris derived from clearing operations shall
be removed, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished appearance, free from unsightly
debris.
After clearing or benching the natural ground, the areas to be filled shall
be scarified to a depth of 6 inches, brought to the proper moisture content,
conpacted and tested for the specified minimum degree of compaction. All
loose soils in excess of 6 inches thick should be removed to firm natural
ground v^iich is defined as natural soils wtiich possesses an in-situ density
of at least 90% of its neximum dry density.
(R-9/89)
SCS&T 8921165 NovCTiber 29, 1989 Appendix, Page 3
When the slope of the natural ground receiving fill exceeds 20% (5
horizontal units to 1 vertical unit), the original ground shall be stepped
or benched. Benches shall be cut to a firm conpetent formational soils. The
lower bench shall be at least 10 feet wide or 1-1/2 times the the equipment
width v^chever is greater and shall be sloped back into the hillside at a
gradient of not less than two (2) percent. All other benches should be at
least 6 feet wide. The horizontal portion of each bench shall be conpacted
prior to receiving fill as specified herein for conpacted natural ground.
Ground slopes flatter than 20% shall be benched when considered necessary by
the Geotechnical Engineer.
Any abandoned buried structiires encountered during grading operations must
be totally removed. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of the structure
and properly capped off. The resulting depressions from the above described
procedures should be backfilled with acceptable soil that is conpacted to
the requirements of the Geotechnical Engineer. This includes, but is not
limited to, septic tanks, fuel tanks, sewer lines or leach lines, stojnn
drains and water lines. Any buried structures or utilities not to be
abandoned should be brought to the attention of the Geotechnical Engineer
so that he may determine if any special recommendation will be necessary.
All water wells v^iich will be abandoned should be backfilled and capped in
accordance to the requirements set forth by the Geotechnical Engineer. The
top of the cap should be at least 4 feet below finish grade or 3 feet below
the bottom of footing whichever is greater. The type of cap will depend on
the diameter of the well and should be determined by the Geotechnical
Engineer and/or a qualified Structural Engineer.
(R-9/89)
SCS&T 8921165 November 29, 1989 i^pendix. Page 4
FHii MATERIAL
Materials to be placed in the fill shall be approved by the Geotechnical
Engineer and shall be free of vegetable matter and other deleterious
substances. Granular soil shall contain sufficient fine material to fill
the voids. The definition and disposition of oversized roclcs eind expansive
or detrimental soils are covered in the geotechnical report or Special
Provisions. Ejqansive soils, soils of poor gradation, or soils with low
strength characteristics may be thoroughly mixed with other soils to provide
satisfactory fill material, but only with the explicit consent of the
Geotechnical Engineer. Any import material shall be approved by the
Geotechnical Engineer before being brought to the site.
PLACING AND CCMPACTICN OF FILL
Approved fill material shall be placed in areas prepared to receive fill in
layers not to exceed 6 inches in conpacted thickness. Each layer shall have
a uniform moistiare content in the range that will allow the conpaction
effort to be efficiently applied to achieve the specified degree of
compaction. Each layer shall be uniformly compacted to the specified
minimum degree of compaction with equipment of adequate size to
economically conpact the layer. Conpaction equipment should either be
specifically designed for soil conpaction or of proven reliability. The
minimum degree of conpaction to be achieved is specified in either the
Special Provisions or the recomnendations contained in the preliminary
geotechnical investigation report.
When the structural fill material includes rocks, no rocks will be alloved
to nest and all voids must be carefully filled with soil such that the
minimum degree of compaction recommended in the Special Provisions is
achieved. The maximum size and spacing of rock permitted in structxxral
fills and in non-structural fills is discussed in the geotechnical report,
v^en applicable.
(R-9/89)
SCS&T 8921165 November 29, 1989 i^ppendix. Page 5
Field observation and conpaction tests to estimate the degree of conpaction
of the fill will be taken by the Geotechnical Engineer or his
representative. The location and frequency of the tests shall be at the
Geotechnical Engineer's discretion. When the conpaction test indicates that
a particular layer is at less than the required degree of conpaction, the
layer shall be reworked to the satisfaction of the Geotechnical Engineer and
until the desired relative conpaction has been obtained.
Fill slopes shall be conpacted by means of sheepsfoot rollers or other
suitable equipment. Cotpaction by sheepsfoot rollers shall be at vertical
intervals of not greater than four feet. In addition, fill slopes at a
ratio of two horizontal to one vertical or flatter, should be trackrolled.
Steeper fill slopes shall be over-built and cut-back to finish contours
after the slope has been constructed. Slope conpaction operations shall
result in all fill material six or more 'inches inward from the finished face
of the slope having a relative conpaction of at least 90% of maximum dry
density or the degree of conpaction specified in the Special Provisions
section of this specification. The conpaction operation on the slopes shall
be continued until the Geotechnical Engineer is of the opinion that the
slopes will be stable surficially stable.
Density tests in the slopes will be made by the Geotechnical Engineer during
construction of the slopes to determine if the required conpaction is being
achieved. Where failing tests occur or other field problems arise, the
Contractor will be notified that day of such conditions by written
conmunication from the Geotechnical Engineer or his representative in the
form of a daily field report.
If the method of achieving the required slope conpaction selected by the
Contractor fails to produce the necessary results, the Contractor shall
rework or rebuild such slopes until the required degree of conpaction is
obtained, at no cost to the Owner or Geotechnical Engineer.
(R-9/89)
SCS&T 8921165 November 29, 1989 Appendix, Page 6
CUT SLOPES
The Engineering Geologist shall inspect cut slopes excavated in rock or
lithified formational material during the grading operations at intervals
determined at his discretion. If any conditions not anticipated in the
preliminary report such as perched water, seepage, lenticular or confined
strata of a potentially adverse nature, unfavorably inclined bedding, joints
or fault planes are encountered during grading, these conditions shall be
analyzed by the Engineering Geologist and Soil Engineer to determine if
mitigating measures are necessary.
Unless otherwise specified in the geotechnical report, no cut slopes shall
be excavated higher or steeper than that alloved by the ordinances of the
controlling govemmental agency.
ENGINEERING GBSERVTVTIGN
Field observation by the Geotechnical Engineer or his representative shall
be nade during the filling and conpacting operations so that he can express
his opinion regarding the conformance of the grading with acceptable
standards of practice. Neither the presence of the Geotechnical Engineer or
his representative or the observation and testing shall not release the
Grading Contractor from his duty to compact all fill material to the
specified degree of conpaction.
SEASCN UMITS
Fill shall not be placed during unfavorable weather conditions. When vrork
is interrupted by heavy rain, filling operations shall not be resumed until
the proper moisture content and density of the fill materials can be
achieved. Damaged site conditions resulting from weather or acts of God
shall be repaired before acceptance of work.
(R-9/89)
SCS&T 8921165 November 29, 1989 Appendix, Page 7
RBCOMMENIM) OUTING SPECIFICAnCNS - SPECIAL PROVISICNS
RELftnVE CCMPACTICN: The minimum degree of conpaction to be obtained in
conpacted natural ground, conpacted fill, and conpacted bacJcfill shall be at
least 90 percent. For street and parking lot subgrade, the upper six inches
should be compacted to at least 95% relative conpaction.
EXPANSIVE SOUS: Detrimentally expansive soil is defined as clayey soil
which has an expansion index of 50 or greater v^en tested in accordance with
the Uniform Building Code Standard 29-C.
OVERSIZED MMERIAL: Oversized fill material is generally defined herein as
rocks or lunps of soil over 6 inches in diameter. Oversize materials should
not be placed in fill unless reconmendations of placement of such material
is provided by the geotechnical engineer. At least 40 percent of the fill
soils shall pass through a No. 4 U.S. Standard Sieve.
TRAHBinON LOTS: Where transitions between cut and fill OCCTUT within the
proposed building pad, the cut portion should be undercut a minimum of one
foot below the base of the proposed footings and reconpacted as stmctvural
backfill. In certain cases that would be addressed in the geotechnical
report, special footing reinforcement or a combination of special footing
reinforcement and undercutting may be required.
(R-9/89)