SUBJECT: HDP 96-1 4 - TAYLOR MADE GOLF
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your request for a Hillside Development Permit, application no.
HDP 96-14, as to its completeness for processing.
The application is complete, as submitted. Although the initial processing of your
application may have already begun, the technical acceptance date is acknowledged by the
date of this communication. The City may, in the course of processing the application,
request that you clarify, amplify, correct, or otherwise, supplement the basic information
required for the application. In addition, you should also be aware that various design
issues may exist. These issues must be addressed before this application can be scheduled
for a hearing. The Planning Department will begin processing your application as of the
date of this communication.
Please contact your staff planner, Adrienne Landers, at (61 9) 438-1 161, extension 4451, if
you have any questions or wish to set up a meeting to discuss the application.
SincerAy, n
9 Planning Director
MJH:AML:bk "
C: Gary Wayne
Bobbie Hoder
Bob Wojcik
File Copy
Data Entry
Planning Aide
2075 Las Palmas Dr. - Carlsbad, CA 92009-1 576 (61 9) 438-11 61 - FAX (61 9) 438-0894 @
'
ISSUES OF CONCERN
Application No. HDP 96-14 - Taylor Made Golf
Planning:
1.
2.
3.
4.
5.
The biology report should provide an exhibit indicating the location of discussed
species. An exhibit clearly defining the open space areas, the mitigation areas, and
the acreage amounts should also be included.
The landscape plan appears to introduce ornamental landscaping into the mitigation
area located on the south side of Fermi Court. The mitigation area should be moved
further south and should include only plant species outlined in the biology report.
The landscape plans indicate the removal of 88 trees around the corner of Lot 78.
These trees will be required to remain as they are currently planted. Any tree
proposed for removal would require replacement.
The information submitted in the memo from Todd Borjesson, dated September 9,
1996 indicates that a fence will be installed at the west end of the driving range. The
height of the proposed fence, materials, and specific location should be provided. The
attached exhibit is vague with regard to golf balls being driven towards Salk Avenue.
It appears that the exhibit addresses only the west half of the range. An analysis
assessing this situation should be provided and should include mitigation measures if
necessary.
Although this review does not include Planning review for building permit issuance,
staff did review your architectural elevations. As I previously mentioned to Denny
Smith, both College Boulevard and El Camino Real are designated scenic corridors. As
such, building elevations along these roadways are extremely important from a visual
perspective. Although the proposed building is constrained by its visibility on four
sides, it is for this reason that attention to architectural detailing is so important.
Although it is difficult to visualize a structure from working drawings, it appears that
the south, east, and west elevations have adequate building modulation. The north
elevation of the building lacks architectural detail. This elevation is basically a series
of repetitive windows and tilt-up concrete panels with seam lines. Architectural
interest should be provided in some manner. Although this information is not required
or provided, staff recommends utilizing a soft color palette on the building rather than
white.
Staff continues. to recommend that the loading area at the northwest end be
recessed or screened by landscaping because trucks parked at this location will be
visible from College Boulevard. The north elevation of the building is another reason
why the trees at the northwest corner of Lot 78 are all the more important due to
their screening capabilities for this portion of the structure.