HomeMy WebLinkAboutHDP 96-14; Taylor Made Golf; Hillside Development Permit (HDP) (3)TO : PHOF-M~. : *704380894
FROM : Vincent N. Scheidt, E ogical Consultant
TO:
From:
cc:
Date:
RE:
- JUN. 24.1997 lB:O2fU"l P 1
rUJE NO. : 619 457 1650
Gregg Hmunn, Hornann Construction
Vlnce ScheMt. Consulting Slologkt @
Paul Glese, Hamann Constructlon
Dee Landers. Clty of Carlsbad
June 24, 1997
Revlew of proposed hydroseed mbc for slopes In open space - The Taylor Made
development project, Carlsbad,
1 have reviewed the proposed Taylor Made project hydroseed rnk for slope tredrnent you've provlded and have the following recommendations:
0 Remove Atrlplex semibacctah (Creeping Saltbush) from the seed mlx. Thls is a non-nat(v8, weedy specles whlch occurs prlrnatlly tn disturbed areas. No
substltutlon Is required, as Prantcrgo ImuW (Plantdn - already In the seed mlx) wilt functlon In the same capacity,
0 Remove Adenostoma fwku/atum (Chomlse) from the seed mlx, Thls Is specles
Is not indigenous to the slte. and Is very difficult to establish from hydroseed.
Attempting to plant thls specles In thb non-suitable area would be a waste of resources No substltutlon Is requlred, as varlaus other shrubby species already In the the seed rnlx will function In the same capacity.
With the exceptlon of them changes, I concur that the proposed hydroseed stope rntx
should be effective In establlshlng an appropriate cover, Please contact me If you
have any qlrestlons.