Loading...
HomeMy WebLinkAboutLCPA 90-02; Price Club; Local Coastal Program Amendment (LCPA)c -4 APPLICAT. A4 COMPLETE DATE: Januarv 4. 1991 DATE: TO: FROM: SUBJECT: 1. STAFF REPORT APRIL 3, 1991 PLANNING COMMISSION PLANNING DEPARTMENT GPA 90-1/LCPA 90-2/ZC 90-1/SDP 90-5/ CUP 90-3MDP 90-9ms 837 - PRICJZ CLUB - Request for approval of a General Plan and Local Coastal Plan Amendment from PI to RRE on 23.6 acres, a Zone Change from P-M-Q to C- 2-Q on 23.6 acres, a Site Development Plan, Conditional Use Pennit, and Hillside Development Permit for a 121,388 sq. ft. Price Club Discount Store containing a tire center, optical center and a small exterior eating establishment. Also proposed is a graded pad for a hture 15,000 sq. ft. office building and a 5,000 sq. ft. retail building. A minor subdivision to create four parcels out of the entire 62 acre property is also proposed. The project site is located on the south side of Palomar Airport Road east of Paseo Del Norte in the Coastal Zone and Local Facilities Management Zone 5. REC0M"DATION That the Planning Commission ADOPT Planning Commission Resolution No. 3205 RECOMMENDING APPROVAL of the Conditional Negative Declaration issued by the Planning Director, and ADOPT Planning Commission Resolution No.'s 3206, 3207, 3208, 3209,3210,3211, and 3212 RECOMMENDING APPROVAL of GPA 90-1, LCPA 90-2, ZC 90-1, SDP 90-5, CUP 90-3, HDP 90-9 and MS 837, based on the findings and subject to the conditions contained therein. II. PROJECX DESQUPnON AND BACKGROUND The applicant is requesting several discretionary approvals for a 62 acre property located on the south side of Palomar Airport Road east of Paseo Del Norte. This property is the site of a previously approved nine lot business park (CT 87-2) containing eight industrial lots, one open space lot and one remainder parcel. A signalized intersection was approved on Palomar Airport Road to provide access to the site. Access was also approved on Paseo Del Norte. The proposed Price Club project would gain access at both of the previously approved locations. The area of the site to be developed has been graded in conformance with the approved business park plans. Regrading of the site will be necessary for the proposed project. c GPA 90-1/LCPA 90-2/ZC 90-,/SDP 90-5/CUP 90-3/HDP 90-9/Mw d37 - PRICE CLUB APRIL 3, 1991 Discretionary approvals required for the proposed Price Club project include: (1) adoption of a Conditional Negative Declaration, (2) a General Plan Amendment from PI (Planned Industrial) to RRE (Extensive Regional Retail) on 23.6 acres, (3) a Local Coastal Plan Amendment from PI (Planned Industrial) to RFE (Extensive Regional Retail) on 23.6 acres, (4) a Zone Change from P-M-Q (Planned Industrial, Qualified Development Overlay Zone) to C-2-Q (General Commercial, Qualified Development Overlay Zone) on 23.6 acres, (5) a Site Development Plan, Conditional Use Permit, and Hillside Development Permit for the development of the property, and (6) a Minor Subdivision to create four parcels out of the entire 62 acre property. The proposed project consists of a 121,388 sq. ft. Price Club Discount Store containing a tire center, optical center and a small exterior eating establishment (pizza, hot dogs, etc.). Also proposed is a graded pad adjacent to Paseo Del Norte for a future 15,000 sq. ft. office building and a graded pad adjacent to Palomar Airport Road west of the signalized access to the site for a future 5,000 sq. ft. retail building. Development of these pads will require approval of an amendment to the site development plan for the property. The Price Club Discount Store building contains a ground floor area of 1 17,188 sq. ft. and a mezzanine level with an area of 4,200 sq. ft. The ground floor area contains 87,588 sq. ft. of retail area, a 21,600 sq. ft. receiving area with ten roll-up doors, a 600 sq. ft. food concession area, six autocenter senrice bays totalling 3,600 sq. ft., a 3,000 sq. ft. tire storage area, and an 800 sq. ft. tire sales/display area. The 4,200 sq. ft. mezzanine contains administrative offices, two employee break rooms, and employee lockers. The building will be constructed of tilt up concrete panels. The base of the building will contain an exposed aggregate finish. A series of eight inch accent reveals are also proposed along each elevation of the building to further enhance the structure. The accent reveals will be dark gray, with sections of the walls separated by the reveals being either light or medium gray in color. Adjacent to the main entrance in the northeast comer of the building is an entry canopy which reaches a width of 20 feet. Wall signage for the Price Club is proposed to be bright blue in color. An outdoor employee eating area is proposed adjacent to the southeast comer of the building. The eating area will have a shade trellis with a concrete frame and wood infill. Concrete screen walls Varying in height from 7-6” to 11’-6’ are proposed on the south side of the building to screen the truck area, pallet yard and trash compactors from view to the east and west. A 12’ high chain link fence with saran screen and vines is proposed to screen this area from view to the south. The building height will vary from 28’ to 32’ based on the adjacent ground elevations. The entry canopy has a maximum height of 22’. - - GPA 90-1/LCPA 90-2/ZC 9C -/SDP 90-5/CUP 90-3/HDP 90-9/M. (337 - PRICE CLUB APRIL 3, 1991 The size of the parking area for the Price Club has resulted in the need to provide a considerable amount of landscaping to help lessen the impact of a large asphalt surface. A total of six percent of the parking area will be landscaped in comparison to the Zoning Ordinance requirement for three percent. Six foot wide landscape planters border the main circulation aisles. Intermediate landscape islands are 5 feet by 18 feet long and are offset throughout the parking area. A 50 foot landscaped setback is provided adjacent to Palomar Airport Road. A three foot high berm is proposed along the Palomar Airport Road frontage of that area of the site to be developed at this time. Planter widths of 6, 15, and 20 feet are provided adjacent to the north and west building elevations to allow enough room for landscaping which will compliment the structure to grow to maturity. All trees to be used on the site will be a minimum size of 24 inch box and all shrubs will be a minimum size of five gallon. Parking lot cart storage areas will be provided and will be located adjacent to intermediate landscape islands in most cases. As stated in the Environmental Impact Assessment - Part 11 completed for this project, approximately 21.99 acres of the site will be graded. This affects the area previously graded and currently fenced. The grading is necessary to create a pad to accommodate the proposed building. The section of this staff report dealing with the Hillside Development Permit addresses grading for the site in more detail. The proposed minor subdivision will create four parcels on the 62 acre property. Parcel 1 totalling 23.6 acres will contain the area for the Price Club Store and the pad for the future retail building adjacent to Palomar Airport Road. Parcel 2 will contain a 15 acre open space parcel on the southern portion of the site. Parcel 3 will contain 3.4 acres and a building pad adjacent to Paseo Del Norte for future development consistent with the existing TWO (Travel Services CommerciaVProfessional and Related) General Plan Designation and R-P (Residential Professional) Zone. Parcel 4 will contain a 20 acre remainder parcel. As stated previously, the area of the project site proposed to be developed has been previously graded in conformance with approval for a business park project. The area north of Palomar Airport Road is used for agriculture. Adjacent property to the south is developed With the Sea Gate Village 286 condominium unit project. Property to the east is undeveloped. To the west is Nurseryland, a Caltrans storage yard and an office building. Approximately 20 letters of opposition to the project as well as a signed petition have been received to date. The letters and petition are on file in the Planning Department. The letters are primarily from the residents in the Alta Mira Project. It should be noted that the signatures on the petition date from December 1989 to May 1990 which is prior to project redesign so that it is not known whether the level of project opposition still exists. Also on file are 560 post cards from Carlsbad Price Club members indicating support for the project. . A - GPA 90-l/LCPA 90-2/ZC 9C /SDP 90-5/CUP 90-3/HDP 90-9/h. a37 - PRICE CLUB APRIL 3, 1991 PAGE 4 Traffic The Price Club property is fronted on the north by Palomar Airport Road and on the west by Paseo Del Norte. Palomar Airport Road is classified in the circulation element as a prime arterial road with a total of six travel lanes. Paseo Del Norte is classified as a secondary arterial with four travel lanes. Currently, both roads are fully improved to City standard requirements along the project frontage with the exception of sidewalks, street lights and median landscape treatment on Palomar Airport Road. Access to the Price Club site is proposed at three locations. The primary access is proposed along Palomar Airport Road at the east end of the project site. This access would be fully signalized and provide for left turn movements into and out of the site. The signalized access coincides with the signalized intersection location approved by City Council for the previously approved Carltas Ranch Industrial Park. This signalized intersection will ultimately provide access to the undeveloped properties to the north of Palomar Airport Road, A second right in/out only access is proposed along Palomar Airport Road at the west end of the project site. The second access is needed to facilitate truck access to the Price Club loading bays and to more evenly distribute traffic to the interior of the project. In the future, this second access will potentially be utilized as access for the existing Nurseryland property as well as the Caltrans maintenance facility should it ever be converted to development. The third access point is from Paseo Del Norte. This access will not be signalized but will allow for both left and right turns into and out of the project site for automobiles once the interchange improvements are completed. The purpose of this requirement is to reduce the potential traffic impacts associated with customers impacting Paseo Del Norte south of the project in advance of I-S/Palomar Airport Road/Paseo Del Norte improvements. Until the interchange improvements are completed, access will be limited to delivery trucks only. Since Paseo Del Norte south of the Price Club site is not an approved truck route, truck traffic will only be allowed north of the service driveway. Internal site traffic will be distributed throughout the parking lot area along several core isle ways which are free of parking stalls. Vehicular access from Palomar Airport Road to Paseo Del Norte through the parking lot is possible; however, it involves making numerous turning movements. For this reason, short circuiting of traffic through the site should not be a major concern. The primary traffic issues raised by this project are as follows: 1. Conformance with circulation standards of the Growth Management Program. Specific problem areas include the Palomar Airport Road/I-5 interchange, Paseo Del Norte/Palomar Airport Road intersection, Palomar Airport Road/El Camino Real intersection and Palomar Airport Road east of El Camin0 Real. . GPA 90-1/LCPA 90-2/ZC 9L r/SDP 90-S/CUP 90-3/HDP 90-9/&~ 837 - PNCE CLUB APRIL 3, 1991 PAGE 5 2. Conflict of Price Club generated traffic with existing traffic volumes to be routed through the construction zone on Palomar Airport Road when the bridge widening project over I-5 begins. 3. Temporary and long term increase of traffic on Paseo Del Norte through the Alta Mka residential area, especially truck traffic. 4. Disruption of progression of through traffic on Palomar Airport Road. 5. Provision of traffic access to adjacent properties. 6. Potential relocation of Paseo Del Norte through the Price Club property. Each of these issues will be discussed separately in the following paragraphs. The proposed Price Club project will significantly increase the amount of traffic on adjoining City streets over the previously approved industriaVoffice uses. The traffic study prepared for the project estimates that all proposed uses on the project site will generate an average daily traffic (ADT) of 8,410 vehicles into and out of the site. This compares with 4,800 ADT which was projected for the existing approved industrial project at this same site. The traffic study provides details on the estimated distribution of this traffic onto the City street system and calculates the impacts to the street network and various intersections in accordance with the requirements of the growth management program. Regardless of this project, there are two previously identified locations where the adopted performance standard is not met for roads or intersections impacted by traffic generated by Zone 5 of which this project is included. The adopted performance standard is not met for the Palom& Airport Road/El Camino Real intersection and Palomar Airport Road east of El Camino Real. Both of these locations were previously identified as not meeting the adopted performance standard and an appropriate financing mechanism to correct the deficiencies was approved by the City Council. The proposed conditions of approval include provision for the Price Club project to contribute to financing the improvements needed to bring the intersection and road segment that do not meet the adopted performance standard into conformance with the adopted performance standard. This project is expected to generate additional traffic sufficient to cause the intersection of Palomar Airport Road and Paseo Del Norte to not meet the adopted performance standard. The traffic study contains recommended improvements to mitigate the intersection to bring it into conformance with the adopted performance standard. These recommended improvements essentially include the addition of dual left turn lanes on all legs of the intersection. A condition to accomplish this mitigation is included in the proposed conditions of approval. GPA 90-1/LCPA 90-2/ZC 96 A/SDP 90-5/CUP 90-3/HDP 90-9/ML d37 - PRICE CLUB APRIL 3, 1991 PAGE 6 The traffic study for this project, as well as the recently completed traffic circulation monitoring report prepared by JHK & Associates, indicates that the intersection of Palomar Airport Road and the 1-5 on/off ramps has dropped below the adopted performance standard. The City is well along in process of preparing improvement plans for the widening of the freeway overpass and ramps including installation of traffic signals; however, financing of the interchange project is not yet guaranteed to be in place when needed. The currently proposed financing mechanism is the Mello Roos District which will be voted upon by the property owners in the near future. Should the Mello vote fail, no building permits, grading permits or final maps will be issued for this project or any other project in Zone 5 until an alternate financing plan for the interchange is approved by City Council in accordance with the Growth Management Program. In the event that the Price Club is approved and the Mello Roos District or other financing mechanism for the interchange is also approved, it is probable that the Price Club could open at some point in time before construction of the interchange is 100% complete. This would expose the interchange construction site to additional traffic. The Price Club traffic study proposes several mitigation measures to mitigate this impact. It is the opinion of staff that most of the proposed mitigation would not be effective due to the complexity of the construction detouring. The Price Club applicant has proposed alternative mitigation which consist of closing the Price Club store during the peak traffic loading periods. Because the Price Club does not open during the AM peak hour, the closure would be limited to the afternoon peak period which occurs between 4 PM and 6 PM on weekdays. Staff agrees that such a closure would have some benefit and has included the daily two hour closure as a proposed condition of the project. The afternoon closure would remain in effect until the City Engineer determines that the interchange constmction has provided adequate capacity to accommodate the increased traffic. Another identified traffic issue is the proposed Price Club access to Paseo Del Norte. There is some concern that the Price Club traffic will adversely affect the nearby residents south of the project site specifically with regard to construction and truck traffic. Paseo Del Norte has previously been designated as a non-truck route south of the project site. Staff believes the Paseo Del Norte access will not unduly attract additional traffic to Paseo Del Norte after completion of the 1-5 bridge improvements. The traffic study indicates that only 5% of the Price Club traffic would ultimately use this access. To reduce truck traffic at this location, the applicant has proposed the addition of the previously discussed secondary Palomar Airport Road right turn Wout access. This secondary access point provides a reasonably direct truck access to the Price Club loading area off Palomar Airport Road from 1-5. The existing truck prohibition on the southerly portion of Paseo Del Norte would remain in effect. Staff is recommending that the project be conditioned to install an automatic gate across the Paseo Del Norte entrance to prohibit customer access into the Price Club from this direction until after the interchange construction is completed. This will help reduce the likelihood of vehicles using Paseo Del Norte to access the Price Club in order to avoid the Palomar Airport Road interchange construction zone. c 4 GPA 90-1/LCPA 90-2/ZC 9C -/SDP 90-S/CUP 90-3/HDP 90-9/M. 337 - PRICE CLUB APRIL 3, 1991 Another project concern is that the Price Club access on Palomar Airport Road could potentially obstruct eastbound through traffic. To mitigate this impact, an additional combined acceleration/deceleration lane is proposed to be constructed on the south side of Palomar Airport Road along the project frontage. The boundary lines of the project site wrap around several properties which have limited access to Palomar Airport Road and Paseo Del Norte requiring staff to consider how this project relates to the ultimate development of these adjacent properties. After reviewing the potential needs, it was determined that the best method to provide for any future development would be to condition the project to provide reciprocal access rights to the adjacent properties through the private parking lot. Such reciprocal access rights provide additional justification for installation of the right turn idout on Palomar Airport Road and for the proposed traffic signal. The ha1 traffic issue raised was the potential relocation of Paseo Del Norte easterly through the project site. The previous project approval for the Carltas Ranch industrial project included a condition to reserve a portion of the site in the event it was determined to realign Paseo Del Norte. The City Council recently commissioned JHK & Associates to investigate this alternative design as part of an overall program to investigate the operational characteristics of Palomar Airport Road adjacent to the 1-5 interchange. The report did indicate that overall traffic flow would improve slightly with such a realignment; however, the incremental improvement was not expected to raise the service level. Considering the potential negative impact of cutting off existing businesses and the financial and environmental impacts of constructing the realigned road, staff recommends not pursuing the matter with this application. No conditions to retain any future access for the realignment of Paseo Del Norte on the Price Club site is included in the proposed conditions of approval for this project. III. ANALYSIS GENERAL PLAN AND LOCAL COASTAL PLAN AMENDMENTS - GPA 90-1/LCPA 90-2 Planninn Issues 1. Is the proposed land use designation appropriate for the site and consistent with the policies of the General Plan? 2. Is the proposed land use consistent and compatible with surrounding land uses? 3. Is the proposed land use designation consistent with applicable policies of the Mello 11 Local Coastal Program? - rc GPA 90-1/LCPA 90-2/ZC 5 l/SDP 9O-S/CUP 90-3/HDP 90-9/1 . 837 - PRICE CLUB APRIL 3, 1991 PAGE 8 DISCUSSION Development of the proposed Price Club Store on this site requires the approval of a General Plan and Local Coastal Plan Amendment on the 23.6 acre "parcel 1" to be created. The applicant is requesting that the designation on that proposed parcel be changed from Planned tndustrial (PI) to Extensive Regional Retail (RRE). Because the Local Coastal Plan land use designation for the site is the same as the General Plan designation, an amendment to the Mello I1 Local Coastal Plan is also required. The existing General Plan designation of PI would allow industrial development including manufacturing, warehousing, storage, research and development, and utility use. The proposed RRE designation allows a wide range of commercial establishments dealing in large, low volume items. Because of the types of items sold and the infrequency of purchase, customers are willing to travel greater distances to compare price and quality. Uses falling into this classification seek locations accessible to a large population because they have a relatively low patron frequency. The General Plan Land Use Element states that the location of these uses should be at the intersections of primary streets, or near these intersections along a major arterial. The proposed site meets this requirement as it is located adjacent to Palomar Airport Road, a Prime Arterial approximately 1,740 feet east of its intersection, with Paseo Del Norte a Secondary Arterial. In addition, the site is approximately 2,240 feet east of Interstate 5. The proposed change in land use is supported by numerous policies found in the Land Use Element of the General Plan. The most applicable policies are as follows: A) Permit the development of land only after adequate provision for services such as transportation, water, sewerage, utilities and public facilities. €3) Arrange land uses so that they preserve community identity and are orderly, functionally efficient, healthful, convenient to the public and aesthetically pleasing. C) Discourage strip commercial development. D) Locate major commercial and industrial centers in areas which are easily accessible to major transportation facilities. K) Encourage the types of commercial and industrial activities which will supply the city with a broad economic base, provide for the social need and reflect all environmental constraints. The proposed change in land use designation is appropriate as necessary services are currently provided to the site and will be improved as required such as circulation system improvements that will be made a condition of the associated Site Development Plan. The proposed site contains adequate separation from residential land uses and will be located in an area with easy access to a large population. Properties east of the site on Palomar c I - GPA 90-1/LCPA 90-2/ZC 9\ /SDP 9O-S/CUP 90-3/HDP 90-9/h 337 - PRICE CLUB APRIL 3, 1991 PAGE 9 Airport Road are presently designated PI which results in the conclusion that the proposal is not creating strip commercial development. In regard to policy "D", the site is located in an area which is accessible to major transportation facilities, thereby complying with that policy. Finally, the proposed land use designation would allow for a commercial use that would add to the economic base of the city while reflecting environmental constraints as specified in policy 'W. The proposed "parcel 2" to be created adjacent to the property to be amended is designated as Open Space and contains 15 acres. Goal C. 1.2. of the Circulation Element states, "Develop the Circulation System concurrent with need. Wherever possible, the adverse impacts of new development on the Circulation System should be mitigated." Specific project conditions of the associated Site Development Plan detail circulation system improvements to be made before the project would be allowed to open for business. A detailed discussion of traffic conditions and required improvements is included in the preceding "Project Description and Background1 section of this report. The following policies of the Circulation Element also apply to this project: C.3.1. Operational efficiencies of streets should be improved by using modem design standards and latest available technology. C.3.2. Adequate traffic safety measures should be provided at all intersections. Once again the proposed land use designation change will comply with the above policies due to circulation system improvements made a condition of development. Some of these required improvements are specified as traffic mitigation measures in the Conditional Negative Declaration proposed for the project. The proposed land use is consistent with and compatible with surrounding land uses which are also non-residential land uses. The proposed use is compatible with the commercial, office, industrial, and agricultural uses in the immediate vicinity. The nearest residential area is located to the south of the site. The area of the site to be developed is separated from the residential area to the south by General Plan designated open space. The project site is also lower in elevation as much as 60 feet in some areas. The project site has been designed to facilitate the flow of traffic from Palomar Airport Road as the primary access point to the property. The land use change also complies with "Commercial Guidelines" number 12 and 15. Those guidelines specify the area southeast of the intersection of the San Diego Freeway and Cannon Road as being one of the few areas of the city intended for regional commercial development. Commercial activities which will supply the city with a broad economic base are also to be encouraged. . GPA 90-1/LCPA 90-2/ZC 9b-l/SDP 9O-S/CUP 90-3/HDP 90-9/h 837 - PRICE CLUB APRIL 3, 1991 The proposed land use designation is consistent with applicable policies of the Mello 11 Segment of the Local Coastal Program. Policies regarding slopes and preservation of environmentally sensitive vegetation are being complied with as they are presently designated as open space and will not be affected. Drainage and runoff control measures are being required of the specific development project including the removal of urban pollutants from drainage waters before they are allowed to exit the site. The Soils Report prepared for the site did not identify any landslides or other areas of possible slope instability. The area of the site affected by the proposed amendment has been graded and drainage improvements required by the Engineering Department will prevent problems of accelerated soil erosion. The area of the property within the 100 hundred year floodplain will remain as open space. In summary, the proposed amendment complies with all policies of the MeUo I1 Segment of the Local Coastal Program. ZONE CHANGE - ZC 90-1 Planning Issues 1. Is the proposed Zone Change consistent with the Land Use Element of the General Plan and the sites proposed land use designation? 2. Would the uses allowed by the proposed Zone Change be compatible with the sup-ounding land uses? DISCUSSION The proposed zone change will change the zoning from Planned Industrial, Qualified Development Overlay Zone (P-M-Q) to General Commercial, Qualified Development Overlay Zone (C-2-Q) on 23.6 acres. This is the area designated as "parcel 1" on the Tentative Parcel Map and coincides with the area proposed to be amended on the General Plan Map. Under the "General Guidelines" section of the Land Use Element, item 10 indicates that zoning should be made consistent with the General Plan. The proposed C-2- Q zone implements the RRE General Plan designation and will achieve consistency between the General Plan and Zoning. The proposed General Plan Amendment to RRE was determined to be consistent with the Land Use Element as described in the preceding section dealing with that application. Therefore, the corresponding implementing zone for that General Plan Designation is also consistent with the Land Use Element. The uses allowed by the C-2-Q zone would be compatible with the adjacent non-residential land uses. The proposed Qualified Development Overly Zone made a part of the zone change requires that a Site Development Plan be approved before building permits or other entitlements are issued for the property. There are only minor exceptions listed to the requirement for a Site Development Plan. They are found in Section 21.06.040 of the Zoning Ordinance. As a result, the Q-Overly Zone provides the City with discretionary review over development of the site to assure that allowed uses are compatible with surrounding land uses. - GPA 90-1/LCPA 90-2/ZC 90- ,/SDP 90-5/CUP 90-3/HDP 90-9/Me d37 - PRICE CLUB APRIL 3, 1991 Planning Issues 1. Can the four findings required of the Q Overlay Zone, required for the approval of the Site Development Plan, be made which are as follows? A) That the requested use is properly related to the site, surroundings and environmental settings, is consistent with the various elements and objectives of the General Plan, will not be detrimental to existing uses or to uses specifically permitted in the area in which the proposed use is to be located, and will not adversely impact the site, surroundings or traffic circulation; B) That the site for the intended use is adequate in size and shape to accommodate the use; C) That all of the yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use to existing or permitted future uses in the neighborhood will be provided and maintained; D) That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use. 2. Does the project comply with the Scenic Corridor Guidelines? 3. Is the proposed project consistent with the Comprehensive Land Use Plan for McClellan-Palomar Airport? 4. Is the proposed project consistent with the Mello I1 Segment of Carlsbad’s Local Coastal Program? DISCUSSION The site is located along Palomar Airport Road, a designated Scenic Corridor by the Scenic Corridor Guidelines. The area along this roadway presents the City of Carlsbad to a great number of persons entering and passing through the City. As a result of its location and concerns that land use compatibility be achieved, staff recommended and the applicant agreed that the Q-Overlay be placed on the property. Therefore, all four findings of the Qualified Development Overlay Zone must be made. All four findings can be made for the project as proposed and discussed below. GPA 90-1/LCPA 90-2/ZC 90-1/SDP 90-5/CUP 90-3/HDP 90-9/Ms 637 - PRICE CLUB APRIL 3,1991 PAGE 12 Finding number 1 required for the Site Development plan can be made as the structure is located an adequate distance from the access points to the property allowing for good on- site circulation and vehicle queuing so as to not impact adjacent roadways. The truck area which has the greatest potential to impact adjacent uses is located on the south side of the building adjacent to the open space area. In addition, it is screened from view by walls, fencing, and landscaping. The main entrance to the building is oriented to draw patrons in from the main vehicle entrance to the property which supports the present site design as being properly related to the site. Finding number 2 can also be made as the project proposes 977 parking spaces while the Zoning Ordinance requires 450. This equates to 46 percent more parking than required by code and is evidence that the site is adequate in size and shape to accommodate the use. In addition, six percent of the parking area will be landscaped in contrast to the Zoning Ordinance requirement of three percent. All necessary yards, setbacks, walls, fences, landscaping and other necessary features have been provided to assure compatibility with existing and permitted future uses. The truck area containing the receiving area, trash compactors, and pallet yard will be screened by the use of concrete walls, fencing utilizing saran screen, and landscaping. The building at its closest point is 160 feet from the western property line and 80 feet from the Caltrans property in the northwestern area of the site. A 50 foot landscaped setback will be provided from Palomar Airport Road which will be landscaped in accordance with the Scenic Corridor Guidelines. The street system serving the proposed use has been determined to be adequate to properly handle all traffic generated by the use contingent on circulation system improvements which have been required. A detailed discussion of traffic conditions and required improvements is. included in the "Project Description and Background" section of this report. Improvements to the I-S/Palomar Airport Road interchange are estimated to be completed by early 1993. Because timing of the interchange improvements are out of the control of the City, actual construction of the improvements do not have to be completed before the applicant is permitted to obtain occupancy of the project pursuant to the Growth Management Program. The Growth Management Program does, however, require that financing for the improvements to the interchange be guaranteed prior to the issuance of any grading or building permits. Representatives of the Price Company have made a proposal to further reduce traffic impacts in the vicinity of the project while the interchange improvements are under construction. The Price Club doors would be voluntarily closed for business from 4 P.M. to 6 P.M. Monday through Friday until the improvements to the I-S/Pdornar Airport Road interchange are completed to the satisfaction of the City Engineer. Traffic counts taken on February 5, 1991 by the City's Traffic Division confirm that this closely matches the afternoon peak period. The following is wording to accomplish the proposed closing which has been included as a condition of the project: 1 - GPA 90-1/LCPA 90-2/ZC 90- ; /SDP 90-S/CUP 90-3/HDP 90-9/ML ~37 - PRICE CLUB APRIL 3, 1991 The Price Club shall be closed for business from 4 P.M. to 6 P.M. Monday through Friday until the improvements to the I-S/Palomar Airport Road interchange are completed to the satisfaction of the City Engineer. Signage shall be posted at the entrance and exit to the store to inform patrons of the business hours. Notification of the special business hours of the Carlsbad store shall also be made to Price Club members in any newsletters or advertisements published. Signs to notify patrons of the 4 P.M. to 6 P.M. Monday through Friday closure shall be approved by the City Engineer and Planning Director and be installed prior to the issuance of an occupancy permit. This proposal has benefits as the Price Club is a membership store enabling it to notify its members of the special business hours. Also of concern are the hours at which delivery trucks will be entering and exiting the site as well as the number of deliveries which will be made. The attached letter from Kathy Nishihira of the Price Company, dated January 14,1991 details the hours of delivery, number, and type of trucks that will be transporting merchandise to the store. Scenic Corridor Guidelines The project is in compliance with the Scenic Corridor Guidelines as they apply to Palomar Airport Road. The guidelines recommend maintaining substantial, heavily-landscaped setbacks along the roadway to visually soften the impact of adjacent buildings. The guidelines also recommend that parking areas be screened from traffic on Palomar Airport Road by a combination of berms and landscaping. The project design includes a 50 foot wide landscaped setback adjacent to Palomar Airport Road with a three foot high berm adjacent to the proposed right-of-way. The parking area is a minimum of 15 feet lower in elevation than Palomar Airport Road. Oak, which is the corridor theme tree, and Holly Oak, the specified median tree, will be utilized as shown on the Landscape Plan. Abort Land Use Plan Plans for the proposed project were sent to the staff of the San Diego Association of Governments (SANDAG) as they serve as staff to the County Airport Land Use Commission. SANDAG staff, in the attached letter dated January 30, 1991, found the project to be consistent with the McClellan-Palomar Airport Comprehensive Land Use Plan. Mello I1 Local Coastal Promam As discussed in the section of this staff report on the proposed Local Coastal Plan Amendment, the project complies with all resource preservation policies of the Mello 11 Segment of the Local Coastal Program. Environmental mitigation has been required for the project dealing with removing urban pollutants from drainage waters prior to them leaving the site. Conditions number 1 and 2 of the EIA Part I1 contain the specific wording I GPA 90-1/LCPA 90-2/ZC 90*1/SDP 9O-S/CUP 90-3/HDP 90-9/L 837 - PRICE CLUB APRIL 3, 1991 PAGE 14 for this requirement. Generally they require that all parking and driving areas be swept and vacuumed on an established weekly schedule to prevent the accumulation of dirt/oil/grease. Also, pollutant traps to remove storm water based pollutants have been required. CONDITIONAL USE PERMIT 90-3 Planning Issues 1. Can the four findings required for granting a Conditional Use Pennit for food concessions (take-out restaurants where food is not served within a dining area) be made? Specifically: a) That the requested use is necessary or desirable for the development of the community, is essentially in harmony with the various elements and objectives of the General Plan, and is not detrimental to existing uses or to uses specifically pennitted in the zone in which the proposed use is to be located; b) That the site for the intended use is adequate in size and shape to accommodate the use; c) That all of the yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use to existing or permitted future uses in the neighborhood will be provided and maintained; d) That the street system senring the proposed use is adequate to properly handle all traffic generated by the proposed use. DISCUSSION The proposed food concession consists of a 600 sq. ft. area within the structure which has service windows on the building exterior and a food cart to be located near the main entrance to the Price Club building. Pizza, hot dogs and other foods would be sold from these concessions. Six patio tables with chairs are proposed to be located near the food cart under the entry canopy to the store. Because of the limited outdoor seating to be provided for this accessory use to the Price Club, it has been determined to function along the lines of a take-out restaurant. The food concession is considered to be a desirable use as it compliments the Price Club retail function and provides a convenient service to shoppers. The parking requirements for the site have included the area devoted to food concessions to anticipate the largest possible parking demand. The location of the food concession is not expected to cause a detrimental impact on existing uses as it is near the entrance to the store in an area where store management can monitor the operation closely. .- 4 GPA 90-1/LCPA 90-2/ZC 90-</SDP 9O-S/CUP 90-3/HDP 90-9/Mu 437 - PRICE CLUB APRIL 3, 1991 The site design has always included the proposed food concessions so that the additional parking demand created has been provided for. The site is adequate in size and shape to accommodate the use as evidenced by the provision of the necessary parking and its location far from neighboring uses. Because the food concessions are located under the entry canopy to the store, all setback requirements have been met. A 30 to 50 foot wide concrete pedestrian area has been provided in this area to accommodate users of the store and food concessions, thereby preventing pedestrian circulation problems, The street system serving the site was discussed in detail under the "Project Description and Background' section of this report. The food concession use is not expected to generate vehicle trips by itself. It is an accessory use to the Price Club Store and will benefit from vehicle trips made for the purpose of patronizing the store. Therefore, based on the circulation system improvements required for the store, the street system has been determined to be adequate to properly handle all traffic that can in any way be attributed to the food concession use. HILLSIDE DEVELOPMENT PERMIT - HDP 90-9 Planning Issues 1. Does the proposed Site Development Plan and Minor Subdivision comply with the development and design standards of the Hillside Development Regulations (Chapter 21.95 of the Zoning Ordinance)? DISCUSSION The project design is in conformance with the development and design standards of the Hillside Development Regulations. The 21.99 acre area of the site proposed to be graded was graded for the project previously approved on the site. The proposed grading plan will require the cut grading of 109,000 cubic yards of soil over a 10.25 acre area closest to Palomar Airport Road. Also required is the fill grading of 96,000 cubic yards of soil over an 11.1 7 acre area immediately south of the cut area. A total of 13,000 cubic yards of soil will be exported from the site. The grading quantity resulting per acre of 4,960 cubic yards is well within the acceptable range of grading volume allowed by the Hillside Development Regulations. The northern portion of the site closest to Palomar Airport Road will be lowered in elevation approximately seven to ten feet in height. The soil will be placed on the previously graded southern portion of the site causing it to be raised in elevation approximately 13 feet at the greatest point to create a level building pad for the structure. No slopes greater than 30 feet in height will be created. Only minor areas of the site that contain slopes over 25 percent will be developed. These areas are exempt from the I - 4 GPA 90-1/LCPA 90-2/ZC 90~-1/SDP 90-5/CUP 90-3/HDP 90-9/M. 537 - PRICE CLUB APRIL 3, 1991 PAGE 16 requirements of the ordinance by Section 21.95.090(1) as they are areas previously disturbed by authorized grading. The building's closest point to the top of slope is at the southeast comer where it is 15 feet from the top of slope. MINOR SUBDMSION - MS 837 Planninn Issues 1. Does the proposed Tentative Parcel Map satisfy all requirements of the Zoning Ordinance, Subdivision Ordinance and the State Map Act? DISCUSSION The proposed Tentative Parcel Map would create four parcels (two buildable parcels, one open space parcel and one remainder parcel) out of this 62 acre site as described in the Project Description section of this report. Each lot in the proposed Tentative Parcel Map complies with all requirements of the zone which is applicable to the individual parcel. The C-2-Q, R-P, 0-S, and L-C zones apply to the property. Each parcel will have a different zoning classification. All proposed lots will front on publicly dedicated streets. GROWTH MANAGEMENT Planninn Issues 1. Is the project in conformance with the Local Facilities Management Plan for Zone 5? DISCUSSION The project is located in Local Facilities Management Zone 5 in the southwest quadrant. Because the project is proposing a General Plan Amendment and Zone Change, addnistrative revisions to the Zone 5 plan will need to be made to keep the plan up to date. The impacts on public facilities created by the project and compliance with the adopted performance standards are summarized below: 1 I 4 GPA 90-1/LCPA 90-2/ZC 90=i/SDP 90-5/CUP 90-3/HDP 90-9/Mu d37 - PRICE CLUB APRIL 3, 1991 PAGE 17 City Administration Facilities Library Wastewater Treatment Capacity N/A N/A N/A N/A 12,892 g.p.d. Yes ~ ~~ ~ Parks Drainage Circulation Fire ~ $.40 sq. ft. req. Yes N/A N/A 8,411 ADT See discussion below Station #4 Yes Circulation Schools Sewer Collection System Water Distribution System Open Space A discussion of the circulation system impacts caused by the project and compliance with the growth management standard is included in the "Project Description and Background' section of this report under the heading of traffic. N/A N/A 58.6 EDU Yes 12,892 g.p.d. Yes N/A N/A The Planning Director has determined that the project could have a significant effect on the environment, however, there will not be a significant effect in this case since the mitigation measures described in the initial study have been added to the project. A Conditional Negative Declaration was issued on February 28, 1991. This decision was based on the findings of the Environmental Assessment, traffic report, and a field survey by staff. The area of the site proposed to be developed was previously graded pursuant to a prior environmental analysis. The Conditional Negative Declaration was sent to the State Clearinghouse and a notice was published in the newspaper. No comments have been received to date. ,- - GPA 90-1/LCPA 90-2/ZC 90- -/SDP 90*5/CUP 90-3/HDP 90-9/ML ,37 - PRICE CLUB APRIL 3, 1991 PAGE 18 SUMMARY The proposed project is consistent with all policies and ordinances governing the subject site. The land use plan amendments and zone change comply with all applicable policies of the General Plan and Local Coastal Program. The project design includes provisions for the future development of two building pads, thereby providing a comprehensive framework for development of the site. Staff therefore, recommends approval of all the previously mentioned actions. ATTACHMENTS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 1s. 16. 17. Planning Commission Resolution No. 3205 Planning Commission Resolution No. 3206 Planning Commission Resolution No. 3207 Planning Commission Resolution No. 3208 Planning Commission Resolution No. 3209 Planning Commission Resolution No. 3210 Planning Commission Resolution No. 3211 Planning Commission Resolution No. 3212 Location Map 1 - GPA and LCPA Location Map 2 - Zoning Location Map 3 - General Location Background Data Sheet Disclosure Form Local Facilities Impacts Assessment Form Letter from Kathy Nishihira of the Price Company dated 1-14-91 Letter from SANDAG dated 1-30-91 Exhibits "A" - "N", dated April 3, 1991 Februq 28, 1991 DN:rvo . NOTICE OF COMPLETION - Mail to: State Clearinghouse, 1400 Tenth et, Rm. 121, Sacramento, CA 95814 - 916/445-% !be NOTE Eelon: I I Project Title: Price Clb - Lead Agency: -artment City of Contact Person: Don Neu Street Address: 2075 L as Pal Drive Phone: (619) 438-1161. ext. 4446 City: Carlsbad Zip: 92009 County: San Dieao WECT LOUTIOI: County: San Dicno City/Nearest Conmnity: Carlsbad Cross Streets: Palanar Airport Roed/Paseo Del Norte Total Acres: 62 Assessor's Parcel No. 211-040-08. 09. 12 Section: 20 8 21 Twp. 12s Range: Base: S.B.B.M. Within 2 Miles: State Hwy #: 1-5 Uateruays: Pacific Ocean & Agua Hedid Lagoon ___________.________~---------------.----------------------.---.------------.---------------------------.---------------------- Airports: Palaner Railways: ATLSF Schools: -______-_____-___-__-----------------------------------------------.------------------------------------------.-------------.---- WQlEYT TYPE Suppl anwnt/Subscqwnt YEPA: - NO1 OTHER: - Joint Docwnt Final Docwnt QQA: - MOP - - Early Cons - EIR (Prior SCH No.) - EA - - X Neg Dec - Other - Draft EIS - Other - Draft EIR - FONSI -_____--__-____--_______________________------------------------------------.----------------------------.---------------------- LOCAL m1al TYPE - General Plan Update - Specific Plan - X Rezone - Annexation - X General Plan Amednent - Master Plan - Prezane - Redevel opnent - Conmmity Plan - X Site Plan - X Land Division (SuWivision, J- Other Coastal Plan Coastal Permit - General Plan Elmnt - Planned Unit Development X Use Permit - ParcelMap,TractMap, etc.) AmeKtnnt,HillsideDev. Permit _______--____-____-_____________________---------------------------------------------.------------------------------------------ DMLaPllEYT TYPE Residential: Units Acres - Uater Facilities: Type MGD - - X Office: Sq. Ft. 20.000 Acres 27 Employees - Transportation: Type - X Comnercial: Sq. Ft. 131.700 Acres 27 Employees - Uining: Mineral Industrial: Sq. Ft. Acres Emp 1 Oyeefi - Power : Type Uatts - Educational - Uaste Treatment: Type Recreational - - Hazardous Uaste: Type - - - Other: _____-___-__-_______-------------------------------.-------------------------------------------------------------..-------------- PROJECT ISSUES DISWSSED. IN WQlEYT - X Aesthetic/Viswl - Agricultural Land - Air Quality - Archaeological/Historical - X Drainage/Absorption - Ecmic/ Jobs - x Coastal zone Fiscal - - Flood Plain/Flooding - Sc hoo 1 s/Uni vers i t i es - Forest Land/Fire Hazard - Septic Systems - X Geologic/Seismic - Sewer Capcity - Minerals - X Soi 1 Erosion/CanpcKtion/Grding - X Noise - Solid Uaste - Poptlation/Hwsing Balance - Toxic/Hazardoucr - Public Services/Faci lities X Traffic/Circulation - Recreat ion/Parks - Veget at i on __X Water Quality - Uater Supply/ - Uildlife - Growth Inducing J- Landuse - Other Ground Uater Uetland/Riparian - Cunulative Effect - ........................... Undeveloped/Planned Inchtrial, Qualified Develqanent Overlay Zone (P-M-01, Residential Professional (R-P) and Open Space (0- S)/Planncd Industrial (PI), Open Space (OS), Travel Services Commercial (TS), and Professional and Related (0). ___--_----___-__-___--------.------.---------------------------------------.-----------------------------------------.---------- Project Descriptim A 121,338 square foot Price Club Discount Store containing a tire center, optical center and a small exterior eating establishment (pizza, hot dogs, etc.). Also proposed is a graded pad for a future 15,000 square foot office building and a 5,000 square foot retail building. The proposal rcqulres a General Plan and Local Coastal Plan Amendnmt fran Planned Industrial (PI) to Extensive Regional Retail (RRE) on 23.65 acres. A zone change from Planned Industrial, Qualified Developncnt Overlay Zone (P-M-9) to General Cumnercial, Qualified Develqanent Overlay Zone (C-2-0) on 23.65 acres is also required. Additional permits necessary for the use are a Site Developnmt Plan, Conditional Use Permit, Hillside Developnent Permit and a Minor Subdivision to create four parcels out of the entire 62 acre property. NOTE: Clearinghouse will assign identification Mmbers for all new projects. frm a Notice of Preparation or previous draft docunent) please fill it in. If a SCH tuber already Exists for a project (e.9. Revised October 1989 CONDITIONAL NEGATIVE DECLARATION PROJECT ADDRESS/LOCATION: On the south side of Palomar Airport Road east of Paseo Del Norte. PROJECT DESCRIPTION: A 121,338 square foot Price Club Discount Store containing a tire center, optical center and a small exterior eating establishment (pizza, hot dogs, etc.). Also proposed is a graded pad for a future 15,000 square foot office building and a 5,000 square foot retail building. The proposal requires a General Plan and Local Coastal Plan Amendment from Planned Industrial (PI) to Extensive Regional Retail (RRE) on 23.65 acres. A zone change from Planned Industrial, Qualified Development Overlay Zone (P-M- Q) to General Commercial, Qualified Development Overlay Zone (C-2-Q) on 23.65 acres is also required. Additional permits necessary for the use are a Site Development Plan, Conditional Use Permit, Hillside Development Permit and a Minor Subdivision to create four parcels out of the entire 62 acre property. The City of Carlsbad has conducted an environmental review of the above described project pursuant to the Guidelines for Implementation of the California Environmental Quality Act and the Environmental Protection Ordinance of the City of Carlsbad. As a result of said review, a Conditional Negative Declaration (declaration that the project will not have a significant impact on the environment) is hereby issued for the subject project. Justification for this action is on file in the Planning Department. A copy of the Conditional Negative Declaration with supportive documents is on file in the Planning Department, 2075 Las Palmas Drive, Carlsbad, California 92009. Comments from the public are invited. Please submit comments in writing to the Planning Department within 30 days of date of issuance. If you have any questions, please call Don Neu in the Planning Department at 438-1 161, extension 4446. DATED: February 28,1991 CASE NO: GPA 90-1/LCPA 90-2/ZC 90-1/SDP SeS/ CUP yO-3/HDP 90-9/MS 837 APPLICANT: The Price Company PUBLISH DATE: February 28,1991 2075 Las Palmas Drive - Carlsbad. California 92009-4859 - (619) 438-1 161 ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART TI (TO BE COMPLETED BY THE PLANNING DEPARTMENT) CASE NO. GPA 90-1/LCPA 90-2/ZC 90-1/SDP 90-5/CUP 90-3/HDP 90-9/MS 837 DATE: Januarv 8. 1991 BACKGROUND 1. CASE NAME: Price Club 2. APPLICANT: The Price ComDanv 3. ADDRESS AND PHONE NUMBER OF APPLICANT: P.O. Box 85466 San Dieno. CA 92138 (619) 581-4699 4. DATE EIA FORM PART I SUBMITED: Februarv 13. 1990 5. A 121,388 sauare foot Price Club Discount Store containinn a tire center, o~tical center and a small exterior eatinn establishment (Dizza, hot doas. etc.). Also DroDosed is a graded pad for a future 15.000 muare foot office buildinn and a 5,000 square foot retail building. The proDosa1 reauires a General Plan and Local Coastal Plan Amendment from Planned Industrial (PI) to Extensive Regional Retail (FtRE) on 23.65 acres. A zone channe from Planned hdus trial, Oualified DeveloDment Overlav Zone (P-M-01 to General Commercial. Oualified DeveloDment Overlav Zone (C-2-01 on 23.65 acres is also reauired. Additional Dennits necessarv for the use are a Site DeveloDment Plan, Conditional Use Permit. Hillside DeveloDment Permit and a Minor Subdivision to create four Darcels out of the entire 62 acre DroDertv. PROJECT DESCRIPTION: ENVIRONMENTAL IMPACTS STATE CEQA GUIDELINES, Chapter 3, Article 5, section 15063 requires that the City conduct an Environmental Impact Assessment to determine if a project may have a significant effect on the environment. The Environmental Impact Assessment appears in the following pages in the form of a checklist. This checklist identifies any physical, biological and human factors that might be impacted by the proposed project and provides the City with information to use as the basis for deciding whether to prepare an Environmental Impact Report or Negative Declaration. * A Negative Declaration may be prepared if the City perceives no substantial evidence that the project or any of its aspects may cause a significant effect on the environment. On the checklist, "NO" will be checked to indicate this de termination. * An EIR must be prepared if the City determines that there is substantial evidence that any aspect of the project may cause a sidcant effect on the environment. The project may qualify for a Negative Declaration however, if adverse impacts are mitigated so that environmental effects can be deemed insidcant. These findings are shown in the checklist under the headings "YES-sign and "YES-insig" respectively. A discussion of potential impacts and the proposed mitigation measures appears at the end of the form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention should be given to discussing mitigation for impacts which would otherwise be determined significant. PHYSICAL ENVIR0”T WILL THE PROPOSAL DIRECTLY OR INDIRECTLY YES (si@ YES NO (insig) 1. Result in unstable earth conditions or increase the exposure of people or property to geologic hazards? X X X Appreciably change the topography or any unique physical features? 2. 3. 4. Result in or be affected by erosion of soils either on or off the site? Result in changes in the deposition of beach sands, or modification of the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? X - X - X X 5. 6. Result in substantial adverse effects on ambient air quality? Result in substantial changes in air movement, odor, moisture, or temperature? 7. Substantially change the come or flow of water (marine, fresh or flood waters)? Affect the quantity or quality of surface water, ground water or public water supply? 8. X - 9. Substantially increase usage or cause depletion of any natural resources? X X - - Use substantial amounts of fuel or energy? 10. 11. Alter a significant archeological, paleontological or historical site, structure or object? -2- / BIOLOGICAL ENVIRONMENT WILL THE PROPOSAL, DIRECTLY OR INDIRECTLY 12. 13. 14. 15. 16. Affect the diversity of species, habitat or numbers of any species of plants (including trees, shrubs, grass, microflora and aquatic plants)? Introduce new species of plants into an area, or a barrier to the normal replenishment of existing species? Reduce the amount of acreage of any agricultural crop or affect prime, unique or other farmland of state or local importance? Affect the diversity of species, habitat or numbers of any species of animals (birds, land animals, all water dwelling organisms and insects? Introduce new species of animals into an area, or result in a banier to the migration or movement of animals? HUMANENVIRONMENT WILL THE PROPOSAL DIRECTLY OR INDIRECTLY 17. 18. Substantially affect public utilities, Alter the present or planned land use of an area? schools, police, fire, emergency or other public services? YES (si& YES NO (insig) X - X - X - X - X - YES NO (insig) -3- HUMANENVIRONMENT WILL THE PROPOSAL DIRECTLY OR INDIRECTLY 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Result in the need for new or modified sewer systems, solid waste or hazardous waste control systems? Increase existing noise levels? Produce new light or glare? Involve a significant risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radiation)? Substantially alter the density of the human population of an area? Affect existing housing, or create a demand for additional housing? Generate substantial additional traffic? Affect existing parking facilities, or create a large demand for new parking? Impact existing transportation systems or alter present patterns of circulation or movement of people and/or goods? Alter waterborne, rail or air traffic? Increase traffic hazards to motor vehicles, bicyclists or pedestrians? Interfere with emergency response plans or emergency evacuation plans? Obstruct any scenic vista or create an aesthetically offensive public view? Affect the quality or quantity of existing recreational opportunities? YES big) YES NO (insig) X - X - X X - X - X - X X - X - X - X - -4- MANDATORY FINDINGS OF SIGNIEICANCE WILL THE PROPOSAL DIRECTLY OR INDIRECTLY 33. Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wild- life species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or en- dangered plant or animal, or eliminate important examples of the major periods of California history or prehistory. 34. Does the project have the potential to achieve short-term, to the dis- advantage of long-term, environmental goals? (A short-term impact on the environment is one which occurs in a relatively brief, definitive period of time while long-term impacts will endure well into the future.) 35. Does the project have the possible environmental effects which are in- dividually limited but cumulatively considerable? ("Cumulatively con- siderable" means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) 36. Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? YES YES (si& (insig) NO X - X - X - -5- DISCUSSION OF ENVIRONMENTAL EVALUATION Physical Environment 1. 2. 3. 4. 5. 6. 7. A report titled "Foundation Investigation Carlsbad Price Club Lots 6-8, Carlsbad Ranch Business Park Carlsbad, California" was prepared for the project by ICG Incorporated. The report is dated February 8, 1990. The report concludes that no credible risk of surface rupture exists at the project site. No known active faults or potentially active faults cross the site. The site was previously graded for the construction of a nine lot business park approved in 1988. Additional grading will be necessary to construct the proposed project. All grading will be required to comply with the recommendations of the soils report. Approximately 21.99 acres of the site will be graded. The proposed grading plan will require the cut grading of 109,000 cubic yards of soil over a 10.25 acre area. Also required is the fill grading of 96,000 cubic yards of soil over a 11.1 7 acre area. A total of 13,000 cubic yards of soil will be exported from the site. The grading quantity resulting per acre of 4,960 cubic yards is well within the acceptable range of grading volume allowed by the Hillside Development Regulations. The northern portion of the site closest to Palomar Airport will be lowered in elevation approximately seven to ten feet in height. This soil material will be placed on the southern area of the site which has been previously graded causing it to be raised in elevation approximately 13 feet at the greatest point to create a level building pad for the structure. These changes to the topography of the site are not considered to be environmentally significant. A storm drain system is proposed to collect all runoff from the site. Runoff from the parking area will be directed through a pollutant trap to remove pollutants from drainage waters before they enter the floodplain to the south. Landscaping of all slopes is required to prevent erosion of soils. The proposed project will not modify the channel of a river or stream or the bed of the ocean as water will be deposited into the floodplain within the southern area of the site after being routed through an energy dissipator. A change in the land use designations applicable to the site and the number of vehicle trips generated by the proposed uses will result in a greater impact to ambient air quality than expected from uses permitted under the present designations. However, because of the project's location in close proximity to Interstate 5 as opposed to other locations previously considered, the proposed site is located so as to minimize the length of vehicle trips from geographical target areas to be served. The Price Club has destination oriented vehicle trips since it is a membership store and the new location will reduce the distance coastal residents will have to travel to patronize a Price Club store. A total of 10.34 percent of the 27 acres to be disturbed will be covered by the Price Club building. The remainder of the site excluding the two future building pads will not have obstructions to air movement with the exception of landscaping. Trash generated by the use is proposed to be processed through the use of trash compactors that will be emptied on a regular basis to prevent odor problems. Landscaping is proposed throughout the parking areas to reduce the impact of large asphalt areas which cause an increase in onsite temperatures. Refer to responses to numbers 3 and 4 above. -6- I DISCUSSION OF ENVIRONMENTAL EVALUATION Icont'dl 4 8. 9. 10. 11. Runoff from the project site will be conveyed to the floodplain on the southern portion of the site. AU parking and driving areas shall be swept and vacuumed on an established weekly schedule to prevent the accumulation of dirt/oil/grease which could be washed into the storm drain system. Parking lot runoff will be collected in the proposed storm drain system onsite and be directed through a pollutant trap prior to being discharged into the floodplain. These requirements intended to remove pollutants from waters leaving the site will be environmental mitigation measures for the project. The area of the site proposed to be developed has been previously graded for the construction of the business park approved for the property. Therefore, no natural resources will be affected. Construction of the proposed use will not by itself create a significant demand on energy sources. A cultural resource survey was completed for the business park approved for the site in 1988 which found no cultural resources within the subject property. Biolonical Environment 12. 13. 14. 15. 16. The area of the site proposed to be developed as a result of the project was previously graded pursuant to a prior environmental analysis. Therefore, the diversity of species of plant life will not be affected. Areas of the site will be landscaped including slopes to prevent erosion. Perimeter areas to be landscaped will utilize Zone 3 naturalizing plant species to provide a transition to areas which will not be disturbed. The project site has been approved for the construction of a business park and been graded in conformance with that plan. No agricultural crops are grown on the site which is presently designated for industrial development. Because the project site has been graded pursuant to a previous environmental analysis, it does not presently provide habitat for wildlife. The commercial uses proposed will not result in the introduction of domestic animals to the area. Human Environment 17. Necessary for the approval of the proposed use is an amendment to the General Plan and Local Coastal Plan as well as a zone change to redesignate the site from industrial to commercial. The project vicinity contains both co'mmerCial and industrial uses which the proposal is compatible with. All necessary public facilities for the use will be provided in conformance with the Local Facilities Management Plan and the requirements of the Engineering Department. 18. All necessary public utilities and services will be provided in conformance with the Local Facilities Management Plan for Zone 5. -7- DISCUSSION OF ENVIRONMENTAL EVALUATION (cont'dl 19. 20. 21. 22. 23. 24. 25. 26. 27. The project will result in the need for a system of removing oil fkom onsite drainage prior to it being discharged into the existing floodplain. A system to remove oils left in the parking areas by automobiles has been required and will be approved by the Engineering Department. The proposed project will cause an increase of 5,528 average daily vehicle trips to and from the site in comparison to the business park approved for the site. The additional vehicle trips will not significantly increase ambient noise levels as the site is adjacent to a prime arterial and within close proximity to Interstate 5. The site is within the 60 CNEL noise contour for McClellan-Palomar Airport. Lighting fixtures are proposed to be attached to the Price Club building and will direct light downward. A lighting plan will be required for the project to ensure that lighting is designed to reflect downward and avoid impacts on adjacent properties. The goods and services offered at the proposed store will not involve a significant risk of an explosion. The potential for the release of oil and grease into the floodplain will be mitigated by weekly sweeping and vacuuming of all parking and driveway areas in addition to the construction of a pollutant trap to remove parking lot oils and grease from drainage before waters exit the site. The change from a business park to commercial uses has the potential to increase the density of the human population of the site during business hours. The population onsite will vary based upon the day of the week and will not create a significant impact as all necessary public facilities and services will be provided to meet demand. The project, if approved, could cause a demand for additional housing as new jobs will be created. Housing is presently or will be available within the City to satisfy the demand that may be created by the project. The Price Club and uses proposed for the future building pads will generate a total of 8,411 average daily vehicle trips. A traffic study was prepared for the project by Urban Systems Associates. Improvements necessary to mitigate the impacts caused by the project are listed under item number 27. The proposed development will create a large demand for new parking which will be satisfied on the project site. A total of 450 parking spaces are required by the City's Zoning Ordinance. A total of 977 spaces are proposed recognizing the demand generated at other Price Club facilities. As stated previously, the project will generate a substantial number of average daily vehicle hips. The City presently has a project in the design phase to widen the Palomar Airport Road bridge over Interstate 5 as well as to improve the on and off ramps. A traffic signal is proposed for the project's access point to Palomar Airport Road. A Traffic Study was prepared by Urban Systems Associates for the proposed project. The City's Traffic Engineer is requiring that the following mitigation measures be implemented: -8- - DISCUSSION OF ENVIRONMENTAL EVALUATION (cont'dl a) Widen and reconstruct the improvements at the intersection of Palomar Airport Road and Paseo Del Norte in order to provide dual left turns on the north, south and east legs of the intersection including appropriate transitions to the satisfaction of the City Engineer. Include modifications of the traffic signal at the intersection of Palomar Airport Road and Paseo Del Norte including appropriate traffic signing and striping. All improvements and work shall be coordinated with the improvements to the interchange at 1-5. b) Construct an appropriate acceleratioddeceleration lane along Palomar Airport Road for the proposed right-in/right-out driveway. c) Close the access to Paseo Del Norte until the improvements to 1-5/Pdomar Airport Road interchange are completed to the satisfaction of the City Engineer. d) Construct full signalized intersection on Palomar Airport Road at the east entrance of the Price Club site including the addition of an added eastbound right turn lane on Palomar Airport Road into the project. 28. 29. 30. 31. 32. The site is not located so as to impact waterways or rail lines. The property is within the airport influence area for McClellan-Palomar Airport but is located far enough to the west of the airport so as to not create a compatibility problem with the airport. SANDAG staff has reviewed the project and found it to be consistent with the McClellan-Palomar Airport Comprehensive Land Use Plan. All necessary street improvements and a traffic signal will be constructed along the project's Palomar Airport Road frontage to create a circulation system that has adequate traffic controls to function in a safe manner. The project will not interfere with emergency response plans as street improvements on adjacent streets will be completed to ensure that access is available. The project will not obstruct a scenic vista as views to the open space area on the southern part of the site will still be retained. An aesthetically offensive public view will not be created as the truck loading, trash compactor and pallet yard area will be screened by the use of walls, fencing and landscaping. In addition, old tires removed at the tire center will be stored in the section of the building containing the service bays. Conditions will be imposed on the project to guarantee that the above mentioned screening and method of storing used tires is maintained. No roof equipment is proposed because of the difficulty in screening the equipment from residences to the south. The building exteriors are proposed to contain areas having a rough aggregate finish to further enhance the visual appearance of the project. These items will also be addressed in the conditions for the project. This proposed commercial project will not create a large demand for recreational facilities. An onsite indoor and outdoor eating area is proposed. All projects within Local Facilities Management Zone 5 are required to pay a park-in-lieu fee of $.40 per square foot of non-residential building area. That fee will offset the demand created for park facilities in Zone 5 by this project. -9- ANALYSIS OF VIABLE ALTERNATrVES TO THE PROPOSED PROJECT' SUCH AS: a) Phased development of the project, b) alternate site designs, c) alternate scale of development, d) alternate uses for the site, e) development at some future time rather than now, f) alternate sites for the proposed, and g) no project alternative. a) The project proposes to phase development by leaving two pads for future buildings. The majority of the parking areas and landscaping will be constructed with the Price Club building so as to minimize future disturbances to the site. b) Alternate site designs have been considered including various access arrangements and building orientations. The proposed design provides the best solution to all concern identified. c) An alternate scale of development would not have significant environmental advantages on this previously graded site. d) Alternate uses for the site include the previously approved business park which would have the benefit of generating less traffic. Circulation system improvements planned will cause the roadways in the project vicinity to operate at levels which meet the performance standards of the City's Growth Management Program even with the traffic generated by the proposed project. e) Development at some future time would leave this previously graded site with a temporary perimeter fence in its present condition with no environmental advantages. f) Alternate sites for the project have been considered. An application was previously filed to construct a Price Club store and additional commercial buildings at the southwest comer of El Camino Real and College Boulevard. Previous sites have been rejected in favor of the proposed site due to its location which has benefits from a circulation standpoint. g) The no project alternative would not be environmentally superior as the project site contains no significant environmental resources and is located adjacent to a prime arterial in close proximity to Interstate 5. -10- DETERMINATION (To Be Completed By The Planning Department) On the basis of this initial evaluation: - I find the proposed project COULD NOT have a significant effect on the environment, and a NEGATNE DECLARATION d be prepared. - x I find that although the proposed project could have a significant effect on the environment, there will not be a Significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A Conditional Negative Declaration will be proposed. - I find the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. 2-2z-9/ Date 9- .A+- nn c // Date DN:rvo:km LIST MITIGATING MEASURES (IF APPLICABLE] 1. All parking and driving areas shall be swept and vacuumed on an established weekly schedule to prevent the accumulation of dirt/oil/grease which could be washed into the storm drain system. 2. Urban pollutants such as oils that are deposited on the parking lot surface by automobiles shall be removed from waters leaving the site by directing drainage through an oil trap subject to the approval of the City Engineer. The oil trap shall be shown on the grading/improvement plans for the project and be operational prior to occupancy of any permanent building on the site. The developer shall provide conclusive proof that the proposed pollutant trap will be effective in removing storm water based pollutants. In lieu of providing the required supporting documentation, a 3 year mo&toring program to evaluate the effectiveness of the proposed pollutant trap shall be established to the satisfaction of the City Engineer and paid for by the developer. -11- 4ST MITIGATING MEASURES [IF APPLICABLE) (cont'dl 3. The following traffic mitigation measures shall be implemented for this project: Widen and reconstruct the improvements at the intersection of Palomar Airport Road and Paseo Del Norte in order to provide dual left turns on the north, south and east legs of the intersection including appropriate transitions to the satisfaction of the City Engineer. Include modifications of the traffic signal at the intersection of Palomar Airport Road and Paseo Del Norte including appropriate traffic signing and striping. All improvements and work shall be coordinated with the improvements to the interchange at 1-5. Construct an appropriate acceleration/deceleration lane along Palomar Airport Road for the proposed right-Wright-out driveway. Close the access to Paseo Del Norte until the improvements to IWPalomar Airport Road interchange are completed to the satisfaction of the City Engineer. Construct full signalized intersection on Palomar Airport Road at the east entrance of the Price Club site including the addition of an added eastbound right turn lane on Palomar Airport Road into the project. 4. To mitigate any aesthetic impacts that development on this site could create, the following measures are required as part of this project: a) The truck loading, trash compactor and pallet yard area shall be screened by the use of walls, fencing and landscaping as shown on the project plans. b) Old tires removed at the tire center shall be stored inside the building. No outdoor tire storage will be permitted. c) No roof eqbipment other than skylights shall be permitted as is shown on the project plans because of the difficulty in screening equipment from residences to the south and from view of travelers on Palomar Airport Road. d) The exterior of the Price Club building shall have a rough aggregate finish in those areas indicated on the project plans in addition to the proposed accent reveals to provide an aesthetically pleasing building in the Palomar Airport Road scenic corridor. ATTACH MITIGATION MONITORING PROGRAM (IF APPLICABLE) -12- APPLICANT CONCURRENCE WITH MITIGATING MEASURES / STATE OF CALIF^ COUNTY OF I THIS IS TO CERTIFY THAT I HAVE REVIEWED THE ABOVE MITIGATING MEASURES AND CONCUR WITH THE ADDITION OF THESE MEASURES TO THE PROJECT. -1 3- PROJECT NAME: Price Club FILE NUMBERS: GPA 90-1/LCPA 90-2/ ZC W-l/SDP 90-5/CUP 90-3/HDP 90-9/MS 837 . APPROVAL DATE: EIR OR CONDITIONAL NEG. DEC.: conditional Nemtive Declaration The following environmental mitigation measures were incorporated into the Conditions of Approval for this project in order to mitigate identified environmental impacts to a level of insignificance. A completed and signed checklist for each mitigation measure indicates that this mitigation measure has been complied with and implemented, and fulfills the City's monitoring requirements with respect to Assembly Bill 3180 (Public Resources Code Section 21081.6). m Shown on Modtoring Ongoing Engineering No Submit proposed schedule prior to occupancy All parking and driving areas shall be swept and vacuumed on an established weekly schedule to prevent the accumulation of dirt/oil/grease which could be washed into the storm drain system. Construct a pollutant trap approved by the City Engheer to remove urban pollutants from drainage waters leaving the site. Submit conclusive proof that the proposed pollutant trap will be effective or establish a monitoring program to the satisfaction of the City Engineer. Ongoing Engineering Grading/ Improvement Plans Prior to occupancy of any permanent building on the site Project Engineering Improvement Plans Prior to occupancy of the Price Club Store Widen and reconstruct the improvements at the intersection of Palomar Airport Road and Paseo Del Norte as specified in the mitigation measures contained in the EIA Part 11. Includes traffic signal modification and coordination with the improvements to 1-5 interchange. Construct an appropriate acceleratioddeceleration lane along Palomar Airport Road for the proposed right-in/right-out driveway Project Engineering Improvement Plans Prior to occupancy of the Price Club Store Project Engineering Improvement Plans Verify Paseo Del Norte access is closed prior to occupancy Close the access to Paseo Del Norte to automobiles until the improvements to I-S/Palomar Airport Road interchange are completed to the satisfaction of the City Engineer. Construct full signalized intersection on Palomar Airport Road at the east entrance of the Price Club site including the addition of an added eastbound right turn lane on Palomar mort Road into the project. Project Engineering Improvement Plans Prior to occupancy of the Price Club Store PROJECT NAME: Price Club FILE NUMBERS: GPA 90-1/LCPA 90-2/ ZC W-l/SDP WS/CUP ")-3/HIIP 90-9/MS 837 APPROVAL DATE: EIR OR CONDITIONAL NEG. DEC.: Conditional Nenative Declaration The following environmental mitigation measures were incorporated into the Conditions of Approval for this project in order to mitigate identified environmental impacts to a level of insignificance. A completed and signed checklist for each mitigation measure indicates that this mitigation measure has been complied with and implemented, and fulfills the City's monitoring requirements with respect to Assembly Bill 3180 (Public Resources Code Section 21081.6). No roof equipment other than skylights shall be Project Building/ Yes permitted. Planning The exterior of the Price Club building shall Project Planning Yes contain areas having a rough aggregate finish in addition to the proposed accent reveals. Emlanation of Headinns Type = Project, ongoing, cumulative. Monitoring Dept. = Department, or Agency, responsible for monitoring a particular mitigation measure. Shown on Plans = When mitigation measure is shown on plans, this column will be initialed and dated. Verified Implementation = When mitigation measure has been implemented, this column will be initialed and dated. Remarks = Area for describing status of ongoing mitigation measure, or for other information. RD- AppendxP Prior to occupancy of the Price Club Store Verify existence of old tire storage bin prior to occupancy Verify at Building Plancheck and prior to occupancy Verify at Building Plancheck DN:rvo:km:lh L EXSING MAL PLAN/ PI LOCAL COASTAL PLAN - - 4 April 3,1991 City of Cirt~ r PRICE CLUB GPA 90-VLCPA 90-2 PROQOSEDGEERALPLAN/ LOCAL COAST'' PLAN ', __ 4 city d Clrhkl PRICE CLUB GPA QO-l/LCPA 90-2 1 EXlSTHOGPERALPLAN/ p~ LOCM COASTAL PLAN PROOOSEDOPORALPLAN/ a LOCAL COASTAL PLAN ’, t EXHIBIT “2” 4 April 3,l991 city of blrhd PRICE CLUB zc 90-1 LOCATION MAP 1 PRICE CLUB EXISl'NG MAL PLAN/ LOCAL COASTAC PLAN GM QO-l/LCPA 90-2 1 PI PWPOmOPERALPLAN/ LOCAL COASTAL PLAN 4 - - LOCATION MAP 2 PRICE CLUB zc 90-1 i 4 LOCATION MAP 3 4 tity ~f CI~ISW SOP 90-WCUP 90-31 HDP 90-9/MS 837 PRICE CLUB - BACKGROUND DATA SHEET - CASE NO.: GPA 90-1/LCPA 90-2/ZC 90-l/SDP 90-5/CUP 90-3/HDP 90-9/MS 837 CASE NAME: Price Club APPLICANT: The Price ComDanv REQUEST AND LOCATION: GPA and LCPA from PI to RRE on 23.6 acres. Zone Change from P-M-0 to C-2-0 on 23.6 acres, Site Develoument Plan, Conditional Use Permit. and Hillside Development Permit for a 121.388 sauare foot Price Club Store and two fume building Dads. Also proposed is a Minor Subdivision to create four parcels out of the entire 62 acre Drouem. LEGAL DESCRIPTION: Parcel "A" of Parcel MaD No. 2949. tonether With a uortion of Lot "H" of the Rancho Ama Hedionda. MaD No. 823. in the Citv of Carlsbad. Countv of San Dieno. State of California APN: 211-040-08. 09. 12 (Assessor's Parcel Number) Acres 622 Proposed No. of Lots/UNts Four lots GENERAL PLAN AND ZONING Land Use Designation PI/TS-O/O-S Density Allowed N/A Density Proposed N/A Existing Zone P-M-O/R-P/O-S/L-C Proposed Zone C-2-O/R-P/O-S/L-C Surrounding Zoning and Land Use: zoning Land Use Site P-M-O/R-P/O-S/L-C Graded site for a business Dark & undevelowd North E-NO-S/L-C Arniculture south 0-S/P-c Open Space & Condominiums East L-C Vacant West C-T/R-A-1 O/R-P Nurse rvland/ C a1 tr ans s t or a ne yard/Office buildinn PUBLIC FACILITIES School District Carlsbad Water District Carlsbad Sewer District Carlsbad Equivalent Dwelling UNts (Sewer Capacity) 58.6 Public Facilities Fee Agreement, dated Februarv 13. 1990 ENVIRONMENTAL IMPACT ASSESSMENT - Negative Declaration, issued - Certified Environmental Impact Report, dated Other, Conditional Nenative Declaration dated Februarv 28. 1991 DN:rvo CPAWI .bds -. DISCLOSURE STATEMENT \ 1 (Please Print) The following information must be disctosed: I. Aaolicrnf List the names and addresses of all persons having a financial interest in the application. sae ATTwn I IST 2. Owner List the names and addresses of all persons having any Thp Prirn Wnv ownership interest in the property involved. 4649 MarPna Blvd- San Dieao. CA 92117 . 3. If any person identified pursuant to (1) or (2) above is a corporation or paftnership, list the names and addresses of all individuals owning more than 1096 of the shares in the corporation or owning any partnership interest in the partnership. Sol Price c/o The Price Company 4649 Morena Blvd. San Diego, CA 92117 4. If any person idmtiilod pursuant to (1) or (2) above is a non-profft organization or a trust, list the names and addresses of any person sewing as officer or director of the non-protlt organization or as trustee or beneficiary of the trust. FRM00013 8/90 2075 Las Palmas Drive Carlsbrd. California 920094859 (819) 438-1161 -. (Over) Page 2 5. Have you had more than $250 worth of business transacted with any member of City staff, arcs Commissions2 ornmittees and Council within the past twelve months? Yes - No If yes, please indicate person(s) FRM00013 8/90 THE PIdCE COMPANY GENERAL INFORhU A 10N DIRECTORS AND ExECuflVE OFFICERS Sol Price Chairman Emeritus Theodore Wallace Director and Executive Vice President Chief Operating Officer (East Coast) F. Anthony Kurtz Robert E. Price Chairman of tbe Board of Directors President and Chief Executive Officer Gilcs H. Bateman Vice Chairman Executive Vice President Chief Financial Officer Director and Executive Vice President Dennis R. Zook Jacklyn M. Horton Director and Executive Vice President General Counsel Richard M. Libenson Director Paul A. Peterson Director and Secretary Attorney at Law Jerome S. Katrin Invest men t Banker ' Director Executive Vice President Chief Operating Officer (West Coast) Neal B. Harris Executive Vice President Don H. Lewis Executive Vice President Mitchell G. Lynn Executive Vice President CoRPoIUTEOmrrS 2657 Ariane Drive P.O. Box 85466 San Diego, CA 921 38 (619) 581-4600 Hans W. Schoepflin Director Investor OTHER PRXQ COMPANY OPERAllONs Photo Processing-National City, CA ' SEUREHOLDSR/INVES~OR REunoNs Meat Processing-National City,-CA Optical Lab-National city, CA Automotive Centers Price Club Optical Price Club Pharmacy Price Club Furnishings Price Club Packaging Club Distribution INDEPENDENT AUDKORS Ernst & Young 501 West Broadway, Suite 1 lo0 San Diego, CA 92101 Daniel T. Carter THE PRICE COMPANY P.O. Box 85466 San Diego, CA 92138 (619) 581-4741 TIUNSFERAC~EHTAND Rrcrsnu~ First Interstate Bank 707 Wilshire Boulevard (W 1 1-2) Los Angeles, CA 9001 7 (2 1 3) 6 14-2362. The Company was incorporated under the laws of California on Febmary 13, 1976. Its offices are located at 2657 Ariane Drive, San Diego, California 921 17; its telephone number is (619) 5Sl- 4600. GROW MANAGFMEN" PROGRAM LOCAL FAclLlTIEs IMPACE ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO.: Price Club-GPA 90-1/LCPA 90-2/ZC 90-VSDP 9OWCUP 90-3/HDP 90-9/ MS 837 LOCAL FACILITY MANAGEMENT ZONE: 5 GENERAL PLAN: PVTS-O/O-S ZONING: P-M-O/R-P/O-S/L-C DEVELOPER'S NAME: The Price ComDanv ADDRESS: P.O. Box 85466. San Dieno. CA 92138 PHONE NO.: 581-4699 ASSESSOR'S PARCEL NO.: 211-040-08.09. 12 QUANTITY OF LAND USWDEVELOPMENT (AC., SQ. FT., DU): 62 acres. 121.388 sauare feet ESTIMATED COMPLETION DATE: A. B. C. D. E. F. G. H. I. J. K. L. City Administrative Facilities: Demand in Square Footage = Library: Demand in Square Footage = - - Wastewater Treatment Capacity (Calculate with J. Sewer) Park: Demand in Acreage = Drainage: Demand in CFS = Identify Drainage Basin = (Identify master plan facilities on site plan) Circulation: Demand in ADTs = (Identify Trip Distn'bution on site plan) Fire: Served by Fire Station No. = Open Space: Acreage Provided - Schools: (Demands to be determined by staff) Sewer: Demand in EDUs - Identify Sub Basin - (Identify trunk line(s) impacted on site plan) Water: DemandinGPD - 8.41 1 4, - 3B 12.892 md There is no Growth Management Dwelling Unit Allowance applicable to this non-residentially designated site. THE PRICE COMPANY SAN DIEGO, CALIFORNIA 92138 (619) 581-4600 PRICE CLUB@ '0 P.O. BOX 85466 January 14, 1991 City of Carlsbad Planning Department 2075 Las Palmas Dr. Carlsbad, CA 92009-4859 Project : GPA 90-1 / LCPA 90-2 / ZC 90-1 / SDP 90-5 / CUP 90-3 / HDP 90-9 RE: PRICE CLUB TRUCK TRAFFIC Price Club truck deliveries are scheduled according to appointments arranged through The Price Company Trafficing Department which also gives directions concerning the required or preferred truck route to a facility. On week days there are approx. 40 to 50 truck deliveries between 5:OO AM and 12:OO noon made by trucks ranging in size from bread vans to 40 ft. semi trailer trucks. On week ends there are only bread van deliveries of around 10 per day before noon. THE PRICE COMPANY Kathk Nishihira, Manager Real Estate Development cbad23 - San Diego ASSOCIATION OF GOVERNMENTS Suite 800, First Interstate Plaza 401 B Street San Diego. California 92101 (619)595-5300 Fax (619)595-5305 January 30, 1991 Don Neu, Senior Planner City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009-4859 Dear Mr. Neu: SANDAG staff has reviewed the plans for the proposed Price Club. ’ The following comment has not been reviewed by the SANDAG Board of Directors as the Airport Land Use Commission. The proposed plans are consistent with the McClellan-Palomar CLUP, If you have any questions or comments, please call me at 595-5372. Thank you for allowing SANDAG to participate in the City’s development review process. . Sincerely, JACK KOERPER Special Projects Director JIUcd _- MEMBER AGENCIES‘ Cities of Carlsbad, Chula Vista. Coronado. Del Mar, El Cajon. Encinitas, Escondido. Imperial Beach, La Mesa, Lemon Grove, National City, Oceanside, Poway. San Diego. San Marcos. Santee. Solana Beach Vista and County of San Diego ADVISORY/LIAISON MEMBERS California Department of Transportation, U S Department of Defense and Tijuana/Bala California