HomeMy WebLinkAboutLCPA 95-07; Carlsbad by the Sea; Local Coastal Program Amendment (LCPA) (5)A REPORT TO THE PLANNING COMMSSION~~
P.C. AGENDA OF: September 6, 1995
Item No.
Application complete date:
Project Planner: Anne
Hysong
Project Engineer: Mike
Shirey
SUBJECT: LCPA 95-07/RP 94-06/CDP 94-O6/CUP 94-10/HDP 94-0S/V 94-O1/PCD/GPC
95-03 - CARLSBAD BY THE SEA LUTHERAN HOME - Request to amend
the Village Redevelopment Local Coastal Program, and requests for approval
of a mitigated negative declaration and addendum, a major redevelopment
permit, coastal development permit, conditional use permit, hillside
development permit, height variance, and General Plan Consistency
Determination to allow the redevelopment of the existing Carlsbad by the Sea
Lutheran Home located at 2855 Carlsbad Boulevard and 201 Grand Avenue
in the V-R/R-3/BAO Zones and Local Facilities Management Zone 1.
I. RECOMMENDATION
Design Review Board:
That the Design Review Board ADOPT Design Review Board Resolution No. 228
RECOMMENDING APPROVAL of the Mitigated Negative Declaration including an
addendum, and Design Review Board Resolution Nos. 229, 230 and 231 as revised
RECOMMENDING APPROVAL of a revised plan for LCPA 95-07, RP 94-06, and CDP 94-
06 based upon the findings and subject to the conditions contained therein.
Planning Commission:
That the Planning Commission ADOPT Planning Commission Resolution No. 3790
APPROVING the Mitigated Negative Declaration including an addendum, and Resolution
Nos. 3791, 3792, 3793, and 3801 as revised APPROVING a revised plan for CUP 94-10,
HDP 94-08, V 94-01, and PCD/GPC 95-03 based upon the findings and subject to the
conditions contained therein.
- /-
LCPA 95-07/RP 94-O6/CDP 94-06/HDP 94-08/V 94-01/
PCD/GPC 95-03 - CARLSBAD BY THE SEA LUTHERAN HOME
SEPTEMBER 6, 1995
PAGE 2
11. INTRODUCTION
At the August 16, 1995 joint public hearing, the Design Review Board and Planning
Commission continued the project to September 6, 1995, to allow the applicant to respond
to concerns expressed by the Design Review Board/Planning Commission that: 1) the project
should consider including ground floor visitor commercial uses south of Grand Avenue along
Carlsbad Boulevard; and 2) too much onstreet public parking along Christiansen Way is lost
due to the partial street vacation. In response to these concerns, Carlsbad Lutheran Homes
has revised their project to offer approximately 3,200 square feet of area on the ground floor
of the Parcel B structure fronting Carlsbad Boulevard for commercial use. The applicant
is also requesting that if the commercial use is found not to be viable, then this area could
revert back to professional care units.
Additionally, in response to concern expressed at the public hearing regarding the loss of
parking on Christiansen Way due to the partial street vacation, the applicant has redesigned
the driveway access ramp to include only one entry point. As shown on the attached Exhibit
"W", this revision results in a reduced area of street vacation due to the shortened driveway
ramp, and it enables the replacement of 12 public parking spaces on the south side of
Christiansen Way. This proposal necessitates the loss of approximately 12 parking spaces
in the Parcel A subterranean garages due to the placement of an interior access ramp.
111. ANALYSIS
A. Ground Floor Commercial Use - V-R Local Coastal Prosam
Consistent with this proposed revision, Condition No. 21 has been added to Design Review
Board Resolution No. 230 for RP 94-06 requiring visitor commercial uses on the ground
floor on Parcel B along the Carlsbad Boulevard frontage. This proposed revision to
incorporate visitor commercial uses should adequately address concerns expressed by
surrounding property owners at the August 16, 1995 public hearing regarding the lack of
retail continuity along Carlsbad Boulevard. The proposed revision would convert the three
living units shown on Attachment "E" as units 147, 148, and 149, to retail commercial use.
The conversion of this 3,200 square foot area to visitor commercial use would result in
ground floor retail commercial uses along the entire Carlsbad Boulevard frontage between
Carlsbad Village Drive and Grand Avenue. The conversion of this ground floor space to
visitor commercial use is therefore consistent with the Village Design Manual visitor
commercial requirement. The 11 required parking spaces for the 3,200 square foot retail
commercial area will be provided in the project's subterranean parking garage, and signage
proposed for the commercial area is conditioned to be consistent with the V-R zone sign
standards.
Project implementation is contingent upon approval of a Local Coastal Program
Amendment to exclude the remaining ground floor area from the visitor commercial
requirement; therefore, LCPA 95-07 remains as one of the project applications before the
Design Review Board.
i
LCPA 95-07/RP 94-O6/CDP 94-06/HDP 94-08/V 94-01/
PCD/GPC 95-03 - CARLSBAD BY THE SEA LUTHERAN HOME
SEPTEMBER 6, 1995
PAGE 3
B. Partial Christiansen Wav Street Vacation
In response to concerns expressed at the August 16, 1995 public hearing regarding the loss
of public parking along Christiansen Way, Condition No. 1 of Design Review Board
Resolution No. 230 and Planning Commission Resolution No. 3791 has been revised, to
require the redesign of the project’s driveway access ramp on Parcel A in accordance with
the attached Exhibit “W” which results in the following:
(1)
(2)
Reduction in the length of the driveway access ramp due to the elimination
of the lower garage entry;
Reduced area of street vacation by approximately 3,400 square feet, resulting
in a revised Christiansen Way right-of-way of approximately 56’ feet (reduced
from 80’) along the majority of the roadway and to 38’ along the 120’ segment
in which the access ramp is provided;
Partial replacement of Christiansen Way parallel parking spaces with 12 - 90”
onstreet public parking spaces between Carlsbad Boulevard and Garfield
Street;
Building height reduced to 35’ along a portion of the Parcel A northern
building elevation due to the shorter driveway ramp; and
The loss of 12 garage parking spaces which are eliminated due to the
placement of an interior ramp between garage levels.
(3)
(4)
(5)
With the proposed revision, public parking spaces provided on Christiansen Way will total
24 spaces. As previously reported, the construction of a 51 space public parking lot within
the Garfield Street unimproved right of way along with the Grand Avenue redesign will
result in no net loss of public parking spaces. The replacement of these 12 spaces within
the proposed Christiansen Way right-of-way will therefore add to the existing public parking
space inventory in the beach area as well as reduce the area of street vacation. As
previously reported, two fourteen foot travel lanes, 5’ sidewalks, and ninety degree parking
within the proposed 56’ of right of way, and no parking within the 38’ of right-of-way width,
is consistent with the City’s local street width standards. The proposed redesign to reduce
the area of proposed vacation and replace a portion of the parallel parking spaces lost due
to the partial vacation with ninety degree parking, will also result in a reduction in the
building area requiring a height exemption since grade adjacent to the building can be
created to satisfy the 35’ building height standard.
In accordance with Section 65402(a) of the California Planning and Zoning Law, the revised
roadway design requiring a reduction in roadway width from 80’ to 56’ and 38’ and the
replacement of 12 public parking spaces is consistent with the General Plan Circulation
Element as specified in the Carlsbad by the Sea Lutheran Home staff report dated August
16, 1995 to the Design Review Board and Planning Commission.
LCPA 95-07/RP 94-06/CDP 94-06/HDP 94-08/V 94-01/
PCD/GPC 95-03 - CARLSBAD BY THE SEA LUTHERAN HOME
SEPTEMBER 6, 1995
PAGE 4
lV. ENVIRONMENTAL REVIEW
In accordance with CEQA Guidelines, the revisions to the project proposed by the applicant
have been reviewed by staff to determine if additional environmental impacts will result
from these changes. Staff has identified no additional impacts and determined that only
minor additions to the Mitigated Negative Declaration are necessary to make it adequate
under CEQA; therefore, an addendum to the Mitigated Negative Declaration has been
prepared and attached to that document.
ATTACHMENTS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Design Review Board Resolution No. 228
Design Review Board Resolution No. 229
Design Review Board Resolution No. 230
Design Review Board Resolution No. 231
Planning Commission Resolution No. 3790
Planning Commission Resolution No. 3791
Planning Commission Resolution No. 3792
Planning Commission Resolution No. 3793
Planning Commission Resolution No. 3801
Revised Attachment "E"
Exhibit "Wf dated September 6, 1995.