Loading...
HomeMy WebLinkAboutMP 02-03G; Robertson Ranch West Village PA 7 & 8; Master Plan (MP) (2)^ CITY OF CARLSBAD LAND USE REVIEW APPLICATION P-1 Development Services Planning Division 1635 FaradayAvenue (760) 602-4610 www.carlsbadca.gov APPLICATIONS APPUED FOR: (CHECK BOXES) Development Permits I I Coastal Development Permit (*) | [Minor I I Conditional Use Permit (*) I [Minor [ jExtension I I Day Care (Large) Environmental impact Assessment Habitat Management Permit Hillside Development Permit (*) Minor Minor {FOR DEPT. USE ONLY) Legislative Permits [ [General Plan Amendment I [Local Coastal Program Amendment (*) IVIaster Pian Speciflc Plan Zone Change (*) (FOR DEPT. USE ONLY) Nonconforming Construction Permit Planned Deveiopment Permit [ [Minor I [Residential [ [Non-Residential Planning Commission Determination Site Deveiopment Plan [ [Minor |^[ Special Use Permit [ [ Tentative Parcel iUap (Minor Subdivision) Tentative Tract Map (Major Sutxlivlsion) Variance | | Minor 14-QW Amendment Amendment Zone Code Amendment South Carlsbad Coastal Review Area Permits Review Permit Administrative j ^Inor j [Major Villaae Review Area Permits Review Permit Administrative [ [Minor [ [Major (*) = eligible for 25% discount NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS MUST BE SUBMrTTED PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION MUST BE SUBMITTED PRIOR TO 4:00 P.M. ASSESSOR PARCEL NO(S).: 208-010-44 PROJECT NAME: Robertson Ranch West Village Planning Areas 7 & 8 BRIEF DESCRIPTION OF PROJECT: Master Plan Amendment to allocate 20 units from PA 7 to PA 8. SUP for development of PA 7. BRIEF LEGAL DESCRiPTION: Carisbad Tract CT 13-03 LOCATION OF PROJECT: ON THE: North 5056 El Camino Real STREET ADDRESS SIDE OF El Camino Real (NORTH, SOUTH, EAST, WEST) (NAME OF STREET) BETWEEN Cannon Road AND Tamarack Avenue (NAME OF STREET) (NAME OF STREET) p-1 Page 1 of S Revised 12/13 OWNERNAME (Print): Rancho Costera LLC APPLICANT NAME (Print): shapell SoCal Rental Prop. LLC MAILING ADDRESS: 725 West Town & Country Rd. #200 MAILING ADDRESS: 8383 Wlshire Blvd. #700 CiTY, STATE. ZIP: Orange, CA 92868 CiTY. STATE. ZiP: Beverly Hills, CA 90211 TaB=HONE (858)397-1370 TELEPHONE: (323) 988-7573 EMAIL ADDRESS: gdeacon@tollbrotherslnc.eom EMAILADDRESS: mfausett@shapell.eom 1 CERTIFY THAT 1 AM THE LEGAL OWNER AND THAT ALL THE ABOVE iNF0HW)"mON~>IS TRUE AND CORRECT TO THE BEST OF MY J<f3oWLEDGp.^ 1 CERTIFY THAT 1 AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THEBESTQRMSCKNOWLEDGE. -^M^ 11814 SIGNATURE—^ DATE SIGNATURE DATE ' APPLICANTS REPRESENTATIVE (Print): Paul J. Klukas; Planning Systems MAILING ADDRESS: 1530 Faraday Ave. #100 Cir»'. STATE. ZiP: Carisbad, CA 92008 TELEPHONE: (760)931-0780 EMAIL ADDRESS: pklukas@planningsystems.net i CERTIFY THAT 1 AM THE LEGAL REPRESENTATIVE OF THE APPUeANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND COaBSST TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF. PLANNING COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THiS PURPOSE. NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTiCE OF RESTRICTION BEiNG R5CeRlJE5"ON3>IE TITLE TO HIS PROPERTY IF CONDmONED FOR THE APPLICANT. NOTiCE OF RESTRICTIONS RUN WITH fHE LANB'ffl'lBBiND ANY SUCCESSORS IN INTEREST. 'JDAN^gJJ^C PROPERTY OWNER SIGNATURE FOR CITY USE ONLY OCT 02 2014 DATE STAMP APPLICATION RECEIVED RECEIVED BY: P-1 Page 2 of6 Revised 12/13 CITV OK CARLSBAD LAND USE REVIEW APPLICATION P-1 Development Services Planning Division 1635 FaradayAvenue (760) 602-4610 www.carlsbadca.gov APPLICATIONS APPUED FOR: (CHECK BOXES) Development Permits I I Coastal Development Permit (*) | | Minor I [ conditional Use Pemiit (*) I ^Inor [ [Extension [ I Day Care (Large) [ [ Environmental Impact Assessment I I Habitat Management Permit [ [Minor [ I Hillside Development Permit (*) | [Minor I [ Nonconforming Construction Pennit [ I Planned Development Permit [ [Minor I [Residential [ [Non-itesidential Planning Commission Detemiination ^ Site Oevelopment Plan j [Minor [ [ Special Use Permit [^ [ Tentative Parcel Map (Minor Subdivision) [ Tentative Tract Map (Major Subdivision) I Variance [ [ Minor Review Permit Administrative | ^inor [ [Major Villaae Review Area Permita Review Permit ^dministratlve [ [Minor j [Major (FOR DEPT. USE ONLY) Legislative Pennits (FOR DEPT. USE ONLY) I [General Plan Amendment [ [Local Coastal Program Amendment {*) [ [Master Plan [ [Amendment j^Speciflc Plan Amendment [ [Zone Change (*) [ [ Zone Code Amendment Soutii Carisbad Coastal Review Area Permits C) = eligibie for 25% discount NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPUCATIONS MUST BE SUBMrrTEO PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPUCATION MUST BE SUBMITTED PRIOR TO 4:00 P.M. ASSESSOR PARCEL NO(S).: 208-010-44 PROJECT NAME: Robertson Ranch West Village Planning Areas 7 & 8 BRIEF DESCRIPTION OF PROJECT: Development of 101 senior and 264 regular apartment project BRIEF LEGAL DESCRIPTION: Carlsbad Tract CT 13-03 LOCATION OF PROJECT ON THE: North 5056 El Camlno Real STREET ADDRESS SIDE OF El Camino Real (NORTH. SOUTH, EAST, WEST) (NAME OF STREET) BETWEEN Cannon Road AND Tamarack Avenue (NAME OF STREET) (NAME OF STREET) P-1 Page 1 of6 Revised 12/13 OWNER MAME (RM): MAUNOADOiess: 7» Vlftwt Town & Country Rd. #200 cnv. STATt ZNP: Or»nfl«, CA 92868 TamOHE: BtHAILADOreBS: fteKhoCoMeniLLC (Mt)9ty-1370 gdMconOtoflbrothcrsinccoin APPUCANT HAMffPiW): 8hape« SoCrt RM*i Pwp. LLC MAiLWOADO«m:8S83WllWt»aKdfr00 CnY.«TATE.ZIP: Bevfty HW«, CA 9B211 TatPHONf: {MS) 968-7578 fMAILADOraESS: mflBl»ettO^wp«R.C0m CtRTTY THAT I AM TME LHM. OWMER AND THAT ALL THE ASOVE jumnmrtoN m-rwui AND oomicT TO THE BEST OF MV ^nMOWLEOQE. ICERTTY tmr I AM THE l£aAL RSWtMNTAtlME » TW CMW^ THE AMMI MtfOMMTKM M mJE iMO OQNMCr to APPUCANTS REPRE8ENTATTVE {Print): Paul J. KMct; PIWMino ^t>iM MAN.MOAOOREW: tSM FwdtyAv. »100 CfTY. STATE. SP: CwWwd, CA 92006 TB.EPHONE: EMAL AODRESS: {7«9 981-0760 THAT I AM THE UTOM. REPRESENTATIVE OF THE ANO THAT Ml THE ASOVE MFORMATION M TRUE AND THEMOrOFMrKNOMIUHME. i / . IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF. PLANNING COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING RECgSOEO-UN I Tl I LbTft HIS PROPERTY IF CONDITIONED FOR THE APPUCANT NOTICE OF RESTRICTIONS RUN WITH ^THELAND AND BINDAMItSOCCESSORS IN INTEREST. CA PROPERTY OWNER SIGNATURE FOR CITY USE ONLY RECEIVED JUN 3 0 2014 CITY OF CARLSBAD PLANNING DIVISION DATE STAMP APPUCATION RECEIVED RECEIVED BY: Page 2 of6 Revised 12/13 City of Carlsbad Faraday Center Faraday Cashiering 001 1418101-1 06/30/2014 32 Mon, Jun 30, 2014 03:20 PM Receipt Ref Nbr: R1418101-1/0015 PERMITS - PERMITS Tran Ref Nbr: 141810101 0016 0018 Trans/Rcpt#: R0102361 SET #; MS140007 Amount: 1 @ $3,749.00 Item SubtotaI: $3,749.00 Item Total; $3,749.00 PERMITS - PERMITS Tran Ref Nbr: 141810101 0016 0019 Trans/Rcpt#: ROI02352 SET #: SDP14008 Amount: 1 8 $11,475.00 I^eiii S' .:-d"i; $11,475.00 A:- • .td:- $11,475.00 z 31 TOTAL; $15,224.00 Ch {Chk# 300415) $15,224.00 Received: $15,224.00 Have a nice dayi ^c:•;**^;^..^:t:******C|JSTOMER COPY************* City of Carlsbad 1635 Faraday Avenue Carlsbad CA 92 008 Applicant: SHAPELL SOCAL RENTAL PROP LLC Description Amount SDP14008 11,475.00 5 05 6 EL CAMINO REAL CBAD Receipt Number: R0102362 Transaction ID: R0102362 Transaction Date: 06/30/2014 Pay Type Method Description Amount Payment Check 11,475.00 Transaction Amount: 11,475.00 City of Carlsbad 1635 Faraday Avenue Carlsbad CA 92 008 llilllllillllllllll Applicant: SHAPELL SOCAL RENTAL PROP LLC Description Amount MS140007 3,749.00 5056 EL CAMINO REAL CBAD Receipt Number: R0102361 Transaction ID: R0102361 Transaction Date: 06/30/2014 Pay Type Method Description Amount Payment Check 3,749.00 Transaction Amount: 3,749.00 ^ CITY OF CARLSBAD PROJECT Develooment Services DESCRIPTION Planning Division p_>| /D\ 1635 Faraday Avenue (760) 602-4610 www.carlsbadca .gov PROJECT NAME: Robertson Ranch Planning Areas 7 & 8 Apartments APPLICANT NAME: Shapell Properties LLC Please describe fully the proposed project by application type. Include any details necessary to adequately explain the scope and/or operation of the proposed project. You may also include any background information and supporting statements regarding the reasons for, or appropriateness of, the application. Use an addendum sheet if necessary. Descnption/Exptanation: The proposed project is an apartment project, including 101 senior units in a single building, and 263 regular apartment units in 22 buildings. A leasing/recreation building and pool area is also proposed. The property is 21.4 acres in size, and is accessed from El Camino Real. TTie project has a General Plan designation of RH (Residential-High density). The property is Zoned Planned Community (P-C) and thus is regulated by the Robertson Ranch Master Plan, which allows for attached apartment or condominium development. Surrounding properties will be developed with single family and commercial development by the Toll Brothers IIK. developers, in accordance with the Master Plan. The 101 senior apartment units are proposed for the northeastern portion of Planning Area 8. They will also indude a parking lot with carports in accordance with the requirements of the Senior Housing Ordinance of the Carlsbad Zoning Code. The entire senior housing project will be price-restricted and made available to low-income households in accordance with the Robertson Ranch West Village Affordable Housing Agreement. The 263 regular apartment units will be developed in 12-unit buildings, dispersed across all of Plarming Area 7 and much of Planning Area 8. Single car garages and open sparking lots are provided for these units. A leasing and recreation building and area is also proposed to accommodate the recreation requirements of the Master Plan. In accordance with the requirements of the Affordable Housing Agreement, 56 of the regular apartment units will be price-restricted as available to moderate income level households. A single car garage is proposed for each unit. To accommodate the inclusion of individual garages, a "standards modification" is proposed to allow for reduced width of the garages from 12-ft to 10-ft in width. Reducing the garage width by 2-feet allows for all units to possess a private parage. Uncovered parking lots are provided in locatiorw convenient to the units to allow for 2 resid«tt parking spaces per unit, in accordance with the requirements of the Carlsbad Parking Ordinance. The subject project will be constructed on flat pads which will be graded in conjunction with the gradiitg permit for CT 13-03. P-1(B) Page 1 of 1 Revised 07/10 Ernest J. Dronenburg, Jr. COUNTY OF SAN DIEGO ASSESSOR/RECORDER/COUNTY CLERK ASSESSOR'S OFFICE 1600 Pacific Highway, Suite 103 San Diego, CA 92101-2480 Tel. (619) 236-3771 * Fax (619) 557-4056 www.sdarcc.com RECORDER/COUNTY CLERK'S OFFICE 1600 Pacific Highway, Suite 260 RO. Box 121750 * San Diego, CA 92112-1750 Tel. (619)237-0502 * Fax (619)557-4155 Transaction #: 342280220150602 Deputy: ASTEVENS Location: COUNTY ADMINISTRATION BUILDING 02-Jun-2015 13:58 FEES: 50.00 Qty of 1 Fish and Game Filing Fee for Ref# NOD 50.00 TOTAL DUE PAYMENTS: 50.00 Check 50.00 TENDERED SERVICES AVAILABLE AT OFFICE LOCATIONS Tax Bill Adciress Changes Records and Certified Copies: Birth/ Marriage/ Death/ Real Estate Fictitious Business Names (DBAs) Marriage Licenses and Ceremonies Assessor Parcel Maps Property Ownership Property Records Property Values Document Recordings SERVICES AVAILABLE ON-LINE AT www.sdarcc.com Forms and Applications Frequently Asked Questions (FAQs) Grantor/ Grantee Index Fictitious Business Names Index (DBAs) Property Sales On-Line Purchases Assessor Parcel Maps Property Characteristics Recorded Documents state of California—Natural Resources Agency CALIFORNIADEPARTMENTOF FISH AND WILDLIFE 2015 ENVIRONMENTAL FILING FEE CASH RECEIPT SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY RECEIPT* SD2015 0488 STATE CLEARING HOUSE *(ifapplicable) 2004051039 LEADAGENCY CITY OF CARLSBAD PLANNING DIVISION DATE 06/02/2015 COUNTY/STATEAGENCY OF FILING SAN DIEGO DOCUMENTNUMBER *20150076* Pf^OJECTTrrLE ROBERSTON RANCH WEST VILLAGE PA 7 AND 8 PROJECT APPLICA^^" NAME RANCHO COSTERA LLC C/O PLANNING SYSTEMS PHONENUMBER 760-931-0780 PROJECTAPPLICANT ADDRESS SUITE 100, 1530 FARADAYAVENUE CITY CARLSBAD STATE CA ZIPCODE 92008 PROJECT APPLICANT (Check appropriate box): Q Local PublicAgency Q School District • Other Special District • State Agency IS Private Entity CHECK APPLICABLE FEES: Q Environmental Impact Report (EIR) 13 Negative Declaration (ND)(MND) • Application Fee Water Diversion (Sfafe Water Resources Control Board Only) • Projects Subject to Certified Regulatory Programs (CRP) EI County Administrative Fee Q Project that is exempt from fees Q Notice of Exemption • CDFW No Effect Determination (Form Attached) • Other PAYMENT METHOD: • Gash • Credit Q Ciieck • Other CHK 3032 15 0076 $3,069.75 $ $2,210.00 $ $850.00 $ $1,043.75 $ $50.00 $ $0.00 $50.00 TOTALRECEIVED $ $50.00 SIGNATURE X "ITTIB Deputy 12015 0076 REM:12/19/2012 RCT: SD20121038 City of Carlsbad JUL 0 9 2015 Planning Division ORIGINAL- PROJECT APPLICANT COPY - CDFW/ASB COPY-LEAD AGENCY COPY-COUNTY CLERK FG763.6a (Rev 11/12) Notice of Determination To: \A] Office of Planning and Research PO Box 3044 Sacramento, CA 95812-3044 From: CITY OF CARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4600 D 1 © Kmest .1 Dronenbura. .Ir. Recorder Counn Clerk JUN 02 2015 BY A>^ kr Si^^ns 15 0076 ^ SD County Clerk Attn: James Scott 1600 Pacific Highway, Suite 260 PO Box 121750 San Diego, CA 92101 Project No: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. DEPUTY ROBERSTON RANCH WEST VILLAGE PA 7 AND 8 Project Title 2004051039 City of Carlsbad, Christer Westman (760) 602-4614 State Clearinghouse No. Lead Agency, Contact Person Telephone Number Generally located south of Tamarack Avenue, north and east of El Camino Real and north of Cannon Road in Local Facilities management Zone 14, City of Carlsbad, San Diego County Project Location (include County) Name of Applicant: Rancho Costera LLC, c/o Planning Svstems Applicant's Address: Suite 100.1530 Faradav Avenue Carlsbad CA 92008 Applicant's Telephone Number: (760) 931-0780 Project Description: Approval of site plan and architectural elevations for 101 senior and lower income restricted apartments. 56 moderate income restricted apartments and. 207 market rate apartments. This is to advise that the City of Carlsbad has approved the above described project on May 19, 2015, and has made the following determination regarding the above described project. 1. The project will not have a significant effect on the environment. 2. This project was reviewed previously and a(n) EIR and Mitigated Negative Declaration was prepared pursuant to the provisions of CEQA. 3. Mitigation measures were not made a condition of the approval of the project. 4. A mitigation reporting or monitoring plan was not adopted for this project. 5. A statement of Overriding Considerations was not adopted for this project. 6. Findings were made pursuant to the provisions of CEQA. This is to certify that the final EIR and Mitigated Negative Declaration with comments and responses aod record of project approval is available to the General Public at THE CITY OF CARLSBAD. and record of proje DON NEU, City Planner Date received for filing at OPR: Date FILED IN THE OFFICE OF THE COUNTY CLERK Posted Removed ilii 0? im w_iiiLiLllL Revised 05/13 state of California—Natural Resources Agency CALIFORNIADEPARTMENTOF FISH AND WILDLIFE 2015 ENVIRONMENTAL FILING FEE CASH RECEIPT SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY City of Carls RECE1PT# SD2015 0488 3W&CLEARING HOUSE #(ifapplicable) ITO«I51039 LEADAGENCY CiTY OF CARLSBAD PLANNING DIVISION JUN 0 5 2015 DATE 06/02/2015 COUNTY/STATEAGENCY OF FILING SAN DIEGO Plannina nivic/«« DOCUMENTNUMBER •20150076* PROJECTTITLE ROBERSTON RANCH WEST VILLAGE PA 7 AND 8 ~ " PROJEGTAPPLiCANT NAME RANCHO COSTERA LLC C/O PLANNING SYSTEMS PHONENUMBER 760-931-0780 PROJEGTAPPLiCANT ADDRESS SUITE 100, 1530 FARADAYAVENUE CITY CARLSBAD STATE CA ZIPCODE 92008 PROJECT APPLICANT (Ctieck appropriate box): • Local PublicAgency • School District • Other Special District • State Agency El Private Entity CHECK APPLICABLE FEES: Q Environmental Impact Report (EIR) El Negative Declaration (ND)(MND) Q Application Fee Water Diversion (Sfafe Water Resources Controt Board Only) • Projects Subject to Certified Regulatory Programs (CRP) EI County Administrative Fee • Project that is exempt from fees Q Notice of Exemption • CDFW No Effect Determination (Form Attached) • Other 15 0076 $3,06975 $ $2,210.00 $ $850.00 $ $1,043.75 $ $50.00 $ PAYMENT METHOD: • Cash • Credit El Checl< • Other CHK 3032 $0.00 $50.00 TOTALRECEIVED $ $50.00 SIGfvlATURE TTHE Deputy 2015 0076 REM: 12/19/2012 RCT: SD20121038 llllllilllllllllllllllllllllll ORIGINAL- PROJECT APPLICANT COPY-CDFW/ASB COPY-LEAD AGENCY COPY-COUNTY CLERK FG 753.5a (Rev 11/12) Notice of Determination To: Q Office of Planning and Research PO Box 3044 Sacramento, CA 95812-3044 From: CITY OF CARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4600 0 [L [1 © Kmest .1 Dronenburg. ,ir. Recorder Counu Clerk JUN 02Z015 BY A^kr S-k^^n^ 15 0076 ^ SD County Clerk Attn: James Scott 1600 Pacific Highway, Suite 260 PO Box 121750 San Diego, CA 92101 Project No: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. DEPUTY ROBERSTON RANCH WEST VILLAGE PA 7 AND 8 Project Title 2004051039 City of Carlsbad, Christer Westman (750) 602-4614 State Clearinghouse No. Lead Agency, Contact Person Telephone Number Generally located south of Tamarack Avenue, north and east of El Camino Real and north of Cannon Road in Local Facilities management Zone 14, City of Carlsbad, San Diego County Project Location (include County) Name of Applicant: Rancho Costera LLC, c/o Planning Svstems Applicant's Address: Suite 100.1530 Faradav Avenue Carlsbad CA 92008 Applicant's Telephone Number: (760) 931-0780 Project Description: Approval of site plan and architectural elevations for 101 senior and lower income restricted apartments. 56 moderate income restricted apartments and. 207 market rate apartments. This is to advise that the City of Carlsbad has approved the above described project on May 19, 2015, and has made the following determination regarding the above described project. 1. The project will not have a significant effect on the environment. 2. This project was reviewed previously and a(n) EIR and Mitigated Negative Declaration was prepared pursuant to the provisions of CEQA. 3. Mitigation measures were not made a condition ofthe approval ofthe project. 4. A mitigation reporting or monitoring plan was not adopted for this project. 5. A statement of Overriding Considerations was not adopted for this project. 6. Findings were made pursuant to the provisions of CEQA. This is to certify that the final EIR and Mitigated Negative Declaration with comments and responses aRd record of project approval is available to the General Public at THE CITY OF CARLSBAD. DON NEU, City Planner Date received for filing at OPR: Date FILED IN THE OFFICE OF THE COUNTY CLERK ^^msA^ Removed Revised 05/13 Ernest J. Dronenburg, Jr. COUNTY OF SAN DIEGO ASSESSOR/RECORDER/COUNTY CLERK ASSESSOR'S OFFICE 1600 Pacific Highway, Suite 103 SanOiego, CA92101-2480 Tel. (619) 236-3771 * Fax (619) 557-4056 www.sdarcc.com RECORDER/COUNTY CLERK'S OFFICE 1600 Pacific Highway, Suite 260 RO. Box 121750 * San Diego, CA 92112-1750 Tel. (619)237-0502 * Fax (619)557-4155 Transaction #: 342280220150602 Deputy: ASTEVENS Location: COUNTY ADMINISTRATION BUILDING 02-Jun-2015 13:58 FEES: 50.00 Qty of 1 Fish and Game Filing Fee for Ref# NOD 50.00 TOTAL DUE PAYMENTS: 50.00 Check 50.00 TENDERED SERVICES AVAILABLE AT OFFICE LOCATIONS Tax Bill Address Changes Records and Certified Copies: Birth/ Marriage/ Death/ Real Estate Fictitious Business Names (DBAs) Marriage Licenses and Ceremonies Assessor Parcel Maps Property Ownership Property Records Property Values Document Recordings SERVICES AVAILABLE ON-LINE AT www.sdarcc.com Forms and Applications Frequently Asked Questions (FAQs) Grantor/ Grantee Index Fictitious Business Names Index (DBAs) Property Sales On-Line Purchases Assessor Parcel Maps Property Characteristics Recorded Documents jtcrte of iSaliifornia—The Resources Agency DEPARTMENTOF FISH AND GAME 2012 ENVIRONMENTAL FILING FEE CASH RECEIPT SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARTt RECEIPT* SD2012 1038 STATE CLEARING HOUSE # (Ifapplicaoie) LEADAGENCY CITY OF CARLSBAD PLANNING DIVISION DATE 12/19/2012 COUNTY/STATEAGENCY OF FlUNG SAN DIEGO DOCUMENTNUMBER •20120249* PROJECTTITLE ROBERTSON RANCH WEST VILLAGE PROJECTAPPUCANT NAME SHAPELL LAND COMPANY PHONENUMBER 323/988-7511 PROJECTAPPUCANTADDRESS 8383 WILSHIRE BOULEVARD SUITE 700 CITY BEVERLY HILLS STATE CA ZIPCODE 90211 PROJECT APPLICANT (Ctieck appropriate box): • Local PublicAgency • School District • Other Special District • State Agency • Private Entity CHECK APPUCABLE FEES: • Environmental Impact Report Q Negative Declaration Q Application Fee Water Diversion (Sfafe Water Resources Control BoanJ Only) • Projects Subject to Certified Regulatory Programs • Couniy Administrative Fee Q Project that is exempt from fees Q Notice of Exemption Q DFG No Effect Determination (Form Attached) • Other PAYMENT METHOD: • Cash • Credit • Check • Other 2119 & 2120 $2,919.00 $2,101.50 $850.00 $992.50 $50.00 TOTALRECEIVED V. Orendain $2,101.50 $50.00 $2,151.50 SIGNATURE X TTn^ Deputy CITY OF CARLSBAD JAN 25 2013 PLANWNQ DEPARTMENT ORIGINAL. PROJECTAPPLICANT COPY-DFG/ASB COPY-LEAD AGENCY COPY-COUNTY CLERK FG 753.5a (Rev. 7/08) Notice of Determination To: \A\ Office of Planning and Research PO Box 3044 Sacramento, CA 95812-3044 From: CITYOFCARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4600 ^ SD County Clerk Attn: James Scott 1600 Pacific Highway, Suite 260 PO Box 121750 San Diego, CA 92101 Project No: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. ROBERSTON RANCH WEST VILLAGE PA 7 AND 8 Project Title 2004051039 City of Carlsbad, Christer Westman (760) 602-4614 State Clearinghouse No. Lead Agency, Contact Person Telephone Number Generally located south of Tamarack Avenue, north and east of El Camino Real and north of Cannon Road in Local Facilities management Zone 14, City of Carlsbad, San Diego County Project Location (include County) Name of Applicant: Rancho Costera LLC, c/o Planning Svstems Applicant's Address: Suite 100.1530 Faradav Avenue Cadsbad CA 92008 Applicant's Telephone Number: (760) 931-0780 Project Description: Approval of site plan and architectural elevations for 101 senior and lower income restricted apartments. 56 moderate income restricted apartments and. 207 market rate apartments. This is to advise that the City of Carlsbad has approved the above described project on May 19, 2015, and has made the following determination regarding the above described project. 1. The project will not have a significant effect on the environment. 2. This project was reviewed previously and a(n) EIR and Mitigated Negative Declaration was prepared pursuant to the provisions of CEQA. 3. Mitigation measures were not made a condition of the approval of the project. 4. A mitigation reporting or monitoring plan was not adopted for this project. 5. A statement of Overriding Considerations was not adopted for this project. 6. Findings were made pursuant to the provisions of CEQA. This is to certify that the final EIR and Mitigated Negative Declaration with comments and responses a(Kj record of project approval is available to the General Public at THE CITY OF CARLSBAD. and record of proje DON NEU, City Planner Date Date received for filing at OPR: Revised 05/13 NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN to you, because your interest may be affected, that the City Council of the City of Carlsbad will hold a public heaiing at the Council Chamber, 1200 Carlsbad Village Drive, Carlsbad, Califomia, at 6:00 p.m. on Tuesday, May 19, 2015, to consider determining that the project is within the scope of the previously certified Robertson Ranch Master Plan Environmental Impact Report (EIR 03-03) and the previously adopted Mitigated Negative Declaration for the Robertson Ranch West Village (MP 02-03C) and approvai of a Master Plan Amendment to transfer 20 residential units within the Robertson Ranch West Village from Planning Area 7 to Pianning Area 8, a Site Development Plan and Special Use Permit for the development of 364 multi-family rental residential units within Planning Areas 7 and 8 of which 101 are lower income and age restricted, 56 are moderate income restricted, and the remainder are market rate rental units, and a minor subdivision subdividing Planning Area 8 into hwo lots, all within the Robertson Ranch Master Plan on property located north of El Camino Real south of Tamarack Avenue and west of Cannon Road in Local Facilities Management Zone 14 and more particularly described as: Parcel 1 of certificate of Compliance for Adjustment Plat No. CE 12-14 recorded November 13, 2012 as Document No. 2012-0706271 Whereas, on April 1, 2015 the City of Carlsbad Planning Commission voted 4-0 (L'Heureux, Montgomery and Siekmann absent) to determine that the project is within the scope of the previously certified Robertson Ranch Master Plan Environmental Impact Report (EIR 03-03) and the previously adopted Mitigated Negative Declaration forthe Robertson Ranch West Village (MP 02-03C) and recommended approval of a Master Plan Amendment to transfer 20 residential units within the Robertson Ranch West Village from Planning Area 7 to Planning Area 8, a Site Development Plan and Special Use Permit for the development of 364 multi-family rental residential units within Planning Areas 7 and 8 of which 101 are lower income and age restricted, 56 are moderate income restricted, and the remainder are market rate rental units, and a minor subdivision subdividing Planning Area 8 into iwo lots, all within the Robertson Ranch Master Plan on property located north of El Camino Real south of Tamarack Avenue and west of Cannon Road in Local Facilities Management Zone 14. Those persons wishing to speak on this proposal are cordially invited to attend the public hearing. Copies ofthe agenda bill will be available on and after May 15, 2015. If you have any questions, please contact Christer Westman in the Planning Division at (760) 602-4614 or christer.westman@carlsbadca.aov. If you challenge the Master Plan Amendment, Site Development Plan, Special Use Permit, and/or Minor Subdivision in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City of Carlsbad, Attn: City Clerk's Office, 1200 Carisbad Village Drive, Carisbad, CA 92008, at or prior to the public hearing. CASE FILE: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 CASE NAME: ROBERTSON RANCH WEST VILLAGE PA 7 & 8 PUBLISH: MAYS, 2015. CITY OF CARLSBAD CITY COUNCIL NOT TO SCALE SITE MAP Robertson Ranch West Village PA 7 & PA 8 MP 02-03(G) / SDP 14-08 / SUP 14-04 / MS 14-07 ATTACHMENT "1" I HEREBY CERTIFY THAT THE PROPERTY OWNERS LIST AND LABELS SUBMITTED TO THE CITY OF CARLSBAD ON THIS DATE REPRESENT THE LATEST AVAILABLE INFORMATION FROM THE EQUALIZED ASSESSOR'S ROLES. APPLICATION NAME AND NUMBER APPLICANT OR APPLICANT'S REPRESENTATIVE BY: IT^W^O DATE: RECEIVED BY Ck^^^ A^ DATE P-21 Page 3 of 6 Revised 07/10 600' PAS L PAT 600* El Camino Real SCALE: 1" = 400' 600' Radius Map Robertson Ranch West Village - Planning Areas 7 & 8 Carlsbad, California March 16, 2015 LAMiMCAI'K AHCIIITKCTI.'KK FNVIHONUKNTAI UlTiaATIOS Ccityof Carlsbad NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN to you that the Planning Commission of the City of Carlsbad will hold a public hearing at the Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Wednesday, April 1, 2015, to consider a request for the following: CASENAME: MP 02-G3(G)/SDP 14-08/SUP 14-04/MS 14-07- ROBERTSON RANCH WEST VILLAGE PLANNING AREAS 7 AND 8 PUBLISH DATE: March 17, 2015 DESCRIPTION: Request for a determination thatthe project is within the scope ofthe previously certified Robertson Ranch Master Plan Environmental Impact Report (EIR 03-03) and the previously adopted Mitigated Negative Declaration for the Robertson Ranch West Village (MP 02-03C) and for a recommendation of approval of a Master Plan Amendment to transfer 20 residential units within the Robertson Ranch West Village from Planning Area 7 to Planning Area 8, a Site Development Plan and Special Use Permit for the development of 364 multi-family rental residential units within Planning Areas 7 and 8 of which 101 are lower income and age restricted, 56 are moderate income restricted, and the remainder are market rate rental units, and a minor subdivision subdividing Planning Area 8 into two lots, all within the Robertson Ranch Master Plan on property located north of El Camino Real south of Tc marack Avenue and west of Cannon Road in Local facilities Management Zone 14. Those persons wishing to speak on this proposal are cordially invited to attend the public hearing and provide the decision makers with any oral or written comments they may have regarding the project. Copies of the staff report will be available online at http://carisbad.granicus.com/ViewPublisher.php7view id=6 on or after the Friday prior to the hearing date. If you have any questions, or would like to be notified of the decision, please contact Christer Westman in the Planning Division at (760) 602-4614, Monday through Thursday 7:30 a.m. to 5:30 p.m., Friday 8:00 a.m. to 5:00 p.m. at 1635 Faraday Avenue, Carlsbad, California 92008. APPEALS The time within which you may judicially challenge these projects, if approved, is established by State law and/or city ordinance, and is very short. If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public heanng described in this notice or in written correspondence delivered to the City of Carlsbad at or prior to the public hearing. • Appeals to the Citv Council: Where the decision is appealable to the City Council, appeals must be filed in writing within ten (10) calendar days after a decision by the Planning Commiss.on. CITY OF CARLSBAD PLANNING DIVISION Community & Economic Development Planning Division 1635 Faraday Avenue I Carisbad, CA 92008 I 760-602-4600 I 760-602-8560 fax NOT TO SCALE SITE MAP Robertson Ranch West Village PA 7 & PA 8 MP 02-03(G) / SDP 14-08 / SUP 14-04 / MS 14-07 PROOF OF PUBLICATION (2010 & 2011 C.C.P.) STATE OF CALIFORNIA County of San Diego I am a citizen of the United States anij a resident of the County aforesaid: I am over the age of eighteen years and not a party to or interested in the above-entitled matter. I am the principal clerk of the printer of UT - North County Formerly known as the North County Times and which newspaper has been adjudicated as a newspaper of general circulation by the Superior Court of the County of San Diego, State of California, for the City of Oceanside and the City of Escondido, Court Decree numbers 171349 & 172171, for the County of San Diego, that the notice of which the annexed is a printed copy (set in type not smaller than nonpariel), has been published In each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: March 20*^ 2015 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Dated at Oceanside, California On This 23''^ day March, 2015 Jane Allshouse UT NORTH COUNTY Legal Advertising This space^il^t^^C^^^qjgg Filing Stamp MAR 2 5 2015 Planning Division Proof of Publication of PLANNING GOMMISSION PUBLIC HEARING INOTICE IS HEREBY GIVEN tlo vou, because your in-rterest may be affected/ that the Planning Commission of the City of Carlsbad will hold o public hearing at the Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m, on Wednesday, April 1,2015, to consider the foi lowing: ' • > 1) CUP 14-08-ST. KATHERINE'S ORTHODOX MISSION - Re-quest for a Condltionql Use Permit to allow St. Katherine's Or-thodox Mission to operate and hold worship services in a vacant 4,965 square foot suite located within an existing 38,875 square foot office/industrial building on property located at 2720 Loker Avenue West in the P^^M zone, in Local Facilities Management Zone 5, -The City Planner has determined that the proiect be-longs to a class of proiects that the State Secretary for Resour-ces has found do not have o significant impact on the environ-ment, and it is therefore categorically exempt from the require-ment for the preparation of environmental documents pursuant to Section 15301(e)(1) - Existing Facilities, of th^ state CEQA Guidelines. * vi:**-^^' '-^ . 2) MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07- ROBERTSON RANCH WEST VILLAGE PLANNING AREAS 7 AND 8 - Re-quest for a determination thqt the proiect is wltljin the scope of the previously certified Robertson Ranch Master Plan Environ-mental Impqct Report (EIR 03-03) and the previously adopted Mitigated Negative Declaration for the Robertson Ranch West Village (MP 02-03C) qnd for a recommendation or approval of a Master Plan Antiendment to transfer 20 residential units within the Robertson Ranch West Village from Planning Area 7 to Planning Ared 8/a Site Development Plan and Special Use Per-mit-for the development of 364 multi-family rental residential units withirt Planning Areas 7 and 8 of which 101 are lower in-come and age restricted, 56 are moderate income restricted, and the remainder are market rate rental units, and a minor subdivision subdividing Planning Area 8 into two lots; aM within the Roberfson Ranch Master Plan on property located north of El Camino Reol:south of Tamarack Avenue and west of Cannon Road in Local facflities Management Zone" T4. • ^f you chalfeng0.-1hese protects frt'court, VQU may lie'flrhited to 'Ft^ only DiossIssues you or'someor^ else raised at the pub- lic hearing des<irit>ed in this notice&r iajwritten^arrespondence' deirvered tafhe Gfty of Corfsbad at or j»?ior to Ifefsublic hear-ing. A. -^;:>.^V. • Xil^^^A^- jCopfeS 'of 'thl^ieJ^onmentat'aocUihei^^^ It J:he . Planning Divisfon at 163$ Fgraday^Avenue durfr^ regular misir ness hours fjom 7^0 dmito ^HJ|Q^pii|5j!!fl4)nddy^t^ Jbursday „ on ^es^^propowCflr^.cordial invited t6 dftend th^ publicSieafing. Copies, af .spiK^fdiff repqrts will beayaijabi^ finTine at Mp:^cartsbad.grdr(Tcidr$1conVV9ewP' ub(r$hej;i>ft||7;iriew ld=« orttfr afterpie l^ridkiy.prior to tfi^hear^ jng-doie. If yoo have any ciUestiohSr^leaSe call the Planning Di-vision at {76tt> 602-4600. •I CITY OF CARLSBAD PLANNiNG DIVISION pub: 3/20/15 The Coast News Decreed A Legal Newspaper by the Superior Court of San Diego County. Mail all correspondence regarding public notice advertising to: The Coast News P.O. Box 232550 Encinitas, CA 92023 (760) 436-9737 Proof of Publication STATE OF CALIFORNIA, ss. COUNTY OF SAN DIEGO, I am a citizen of the United States and a resident of the county aforesaid; I am over the age of eighteen years, and not a party to or interested in the above entitled matter. I am principal clerk of the printer of The Coast News, a newspaper printed and published weekly and which newspaper has been adjudged a newspaper of general circulation for the cities of Carmel Valley, Del Mar, Solana Beach, Encinitas/Cardiff, Carlsbad, Oceanside, Vista, San Marcos, Escondido and the County Judicial District by the Superior Court of the State of California, County of San Diego (8/4/94, #677114, B2393, P396); and that the notice, of which the annexed is a printed copy, has been published in, each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: March 20.2015 I certify under penalty of perjury that the foregoing is true and correct. Executed at Encinitas, County of San Diego, State of California on this 20th of March 2015. Clerk offtM Printer City of Carlsbad MAR 2 6 2015 Planning Division Space above for County Clerk's Filing Stamp PLANNING C(MM1SSI0N PUBLIC HEARING NOTICE IS HEREBY GIVEN to you, because your interest may be affected, that the Plan- ning ConmnssiDn of the City of Carlsbad will hold a public heariiigat the Coundl Cham- bers, 1200'Gad^d ViUage Drive, Carlsbad, Califomifi, at 6:00 p.in.JVednesday, April 1, 2015,^ to consider the following: 2) MP 02^03(G)/SPP 44-08/SUP 14-04/MS 14-07^ ROBERTSON RANCH WEST VILLAGE PLANNING AREAS 7 AND 8 - Request for a detenninatipn that the-project is within the scope of th^ previously certified Robertson%indi Master Plan Environmental Impact Re- port (EIR 03-03) and thie previously adopted ifitigated Negative Declaration for the Robert- son Ranch West Viilage (MP 02-03C) and for a recommendation of approval of a Master Flan Amendment to transfer 20 residential units within the Robertson Ranch West Village from Planning Area 7 to Planning Area 8, a Site Development Plan and Special Use Permit for the development of 364 multi-family rental residential units witiun Planning Areas 7 and 8 of which 101 are lower income and age restricted, 56 are moderate income restricted, and the remainder are market rate rental units, and a minor subdivision subdividing Planning Area 8 into two lots, all within the Robertson Ranch Master Plan on property located north of El Camino Real south of Tamarack Avenue and west of Cannon Road in Local facilities Management Zone 14. NOT TO SCJkLE Robertson Ranch West Village PA 7 & PA.8 , MP 02-03(G) / SDP 14-08 / SUP 14-04 / MS 14-07 If you challenge these projects in com^, ypu may be Umited to raising only those issues you or someone else raised at the public hearing described in this, noticx t>r.^n written corre- spondence delivered to the City of Carlsbad at or prior to the public hearing. Copies of the environmental documents are available at the Planning Division at 1635 Far- aday Avenue during regular business hours from 7:30 am to 5:30 pm Monday through Thurs- day and 8:00 afn to 5:00 pm Friday.- Those persons wishing to^pealc-on these-propos^s are cor^ally iwrlted tcaltferftfthe iJtibUi? hearing. Copies of the staff reports will be available online at http://carlsbad.granicus.com/ ViewPublisher.php?view_id=6 on or after the Friday prior to the hearing date. If you have any questions, please call the Planning Division at (760) 602-4600. PUBLISH: March 20,2015 CITY OF CARLSBAD PLANNING DIVISION 03/20/15 CN 17106 ENVIRONMENTAL INFORMATION FORM (To be Completed by Applicant) Date Filed: (To be completed by City) Application Number(s): General Information 1. Name of project: 2. Name of developer or project sponsor: ti^i^dTUL tfd VV\_^ j Address: JlBl t^'t J H i/t^" <3l.v/4>. 7 0 6 City, State, Zip Code: . Phone Number: 3. Name of person to be contacted concerning this project: Address: ^ S. ^t^oM-f - PWj^AH^Cr ffJTIi'^S City, State. Zip Code: /Qt) f^Ai^AOA^ /N^ '^t^t Phone Number: CAl^U , CA f 1^0 / O Address of Project: (f ^ CAi^ \ A/1 /t^/K^ Assessor's Parcel Number: 5. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies: $iT^ i)(i'texofi*\A/£-tsir^ pt*/v 6. Existing General Plan Land Use Designation: 7. Existing zoning district: ^ " ^ 8. Existing land use(s): sJkLA^'(^ 9. Proposed use of site (Project for which this form is filed): finFfi^*^ S Project Description 10. Site size: t-X. V - 11. Proposed Building square footage: 12: Numberof floors of construction: 3 13. Amount of off-street parking provided: 14. Associated projects: P-1 (D) Page 2 of 4 Revised 07/10 15. If residential, include the number of units and schedule of unit sizes: 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area, and loading facilities: 17. If industrial, indicate type, estimated employment per shift, and loading facilities: JA\A. 18. If institutional, indicate the major function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project: 19. If the project involves a variance, conditional use or rezoning applications, state this and indicate ciearly why the application is required: P-1 (D) Page 3 of 4 Revised 07/10 Are the foliowing items applicable to the project or its effects? Discuss all items checked yes (attach additional sheets as necessary). Yes 20. Change in existing features of any bays, tidelands, beaches, or hills, or substantial • alteration of ground contours. 21. Change in scenic views or vistas from existing residential areas or pubiic lands or • ^ roads. 22. Change in pattern, scale or character of general area of project. Q H 23. Significant amounts of solid waste or litter. • 24. Change in dust, ash, smoke, fumes or odors in vicinity. Q |^ 25. Change in ocean, bay, lake, stream or ground water quality or quantity, or • Hi alteration of existing drainage patterns. 26. Substantial change in existing noise or vibration levels in the vicinity. O ^ 27. Site on filled land or on slope of 10 percent or more. • ^ 28. Use of disposal of potentially hazardous materials, such as toxic substances, • [3s flammables or explosives. 29. Substantial change in demand for municipal services (police, fire, water, sewage, Q [2- etc.). 30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, etc.). • JSl 31. Relationship to a larger project or series of projects. 0 • Environmental Setting Attach sheets that include a response to the following questions: 32. Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site, and the use of the structures. Attach photographs of the site. Snapshots or Polaroid photos wiil be accepted. VA^'Ai/'T '•VwTVVW U^O 33. Describe the surrounding properties, including information on plants and animals and any cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity. Snapshots or polaroid photos will be accepted. yy|f/)^< /^f iMiJt.'cTd/M/' \/V^t> Certification I hereby certify that the statements furnished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Date: ^Z^*?//*/ Signature: [) £i/Uy\') </IAV-^ For: jpL/g-AMA/^ S ^JTlTy^S P-1 (D) Page 4 of 4 Revised 07/10 ^ TENTATIVE PARCEL MAP ^^1^ ... J» ™ ^7^1 Development Services %^ WAIVER OF PROCESSING Planning Division ^TL^'^l^V^ TIME LIMITS 1635 Faraday Avenue IARINRAM D 'ttn\ 760-602-4610 V-.-'VrVi-^D'Vi--' Vi/ww.carisbadca.gov Proposed Minor Subdivision No.:_ Subdivision Map Act (SMA) Section 66452.1 sets a 50-day time limit for the Planning Division to process tentative parcel maps. Per SMA Section 66451.1, this time limit may be extended by mutual consent of the applicant and the city to allow for concurrent processing of related approvals or an environmental review of the project. By accepting applications for tentative parcel maps concurrently with applications for other approvals that are prerequisites to the map (e.g., Environmental Information Form, Environmental Impact Report, Condominium Permit, Planned Unit Development), the 50-day time limit is often exceeded. For the city to process a tentative parcel map application concurrently, the property owner or applicant must sign this agreement. If this agreement is not signed, the city will accept the tentative parcel map application only after all prerequisites to the map have been processed and approved. The undersigned acknowledges the processing time required by the city is expected to exceed the 50-day time restriction and hereby waives such time restriction for city planner action. Signature Print Name Date Signature Print Name Date Signer is (check one): •Property Owner OApplicant P-1(F) Rev. 04/13 NOirrH COUNTY THANSIT DISTRICT 0(8»si'J.;, a 92054 !/M!%;-0?41 Ifex) lOSROOt OIRfOORS limy Kt!} M 6(.!l,-, Hi! Iili !,'iU NiiKsU EXKUIIVE WRfdOfi CtHIRAi COONSEl March 12, 2015 Paul J. Klukas Planning Systems 1530 FaradayAvenue, Suite 100 Carlsbad, CA 92008 RE: Robertson Ranch West Village in Carlsbad Dear Mr. Klukas: Thank you for the opportunity to comment on the Robertson Ranch West Village project and the transit amenities to be located at three (3) bus stops on Ei Camino Real in the City of Carlsbad. Upon review of the project vicinity map and the site details for each stop location, all dated February 24, 2015 and received by the North County Transit District (NCTD) on February 25, 2015, NCTD has determined that the design as proposed forthe dimensions of the bus turn-outs and the detail of the proposed bus shelters to be installed are consistent with the NCTD standard as provided in the NCTD Bus Stop Development Handbook. Should you have any questions, please feel free to contact me at 760-966-6655 or via email at idunninqCa)"nctd.orq. Sincerely, Johnny Dunning Manager of Service Planning ^ CITY OF CARLSBAD REVIEW AND COMMENT MEMO *ALWAYS SEND EXHIBITS • DATE: DECEMBER 31. 2014 PROJECT N0(S): SDP 14-08/MS 14-07 REVIEW NO: 3 PROJECT TITLE: ROBERTSON RANCH WEST VILLAGE APPLICANT: PLANNING SYSTEMS/PAUL KLUKAS 760-931-0780 TO: Land Deveiopment Engineering-J. Riddle • Public Works (Storm Drain) - Clayton Dobbs • Police Department-J. Sasway • Public Works (Wastewater) - Don Wasko Fire Department - Greg Ryan • Public Works (Water) - Eric Sanders • Building Division - Will Foss • Water/Sewer District • Parks & Recreation (Parks/Trails) - Liz Ketabian Landscape Plancheck Consultant - PELA • Parks & Recreation (Trees & Medians) - Kyle Lancaster • School District • Public Works Department (Streets) • North County Transit District - Planning Dept. • Public Works Department (Traffic) - John Kim • Sempra Energy-Land Management • • Public Works Department (Design) - David Ahles SANDAG (Any huge/major development) 401 B. Street, Suite 800, San Diego CA 92101-4231 • Caltrans (Send anything adjacent to 1-5) State of California Dept. of Transportation Planning Division, ATTN: Jacob Armstrong 4050 Taylor Street, MS 240 San Diego, CA 92110 FROM PLANNING DIVISION/WESTMAN Please review and submit written comments and/or conditions to the TRACKING DESK in LDE at 1635 Faradav Avenue, bv 01/21/15. If you have "No Comments," please so state. If vou determine that there are items that need to be submitted to deem the application "complete" for processing, please immediatelv contact the applicant and/or their representatives (via phone or e-mail) to let them know. Thank you COMMENTS: A\^QS^•tG^ fOu^ov^r rPf\V\K^RQ ry)^ PA\r}yhA< r.f^\ ^'f<)_^> ,'^'^1 (^n^^(V^^\o^y7 {Ar>e-\iA upj \M^U('9\ Signature PLANS ATTACHED Review & Comment I ]ij\\A bate 8/14 # • CITY OF CARLSBAD REVIEW AND COMMENT MEMO *ALWAYS SEND EXHIBITS DATE: OCTOBER 7. 2014 PROJECT NO(S): PROJECT TITLE: APPLICANT: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 REVIEW NO: 2 PROJECT NO(S): PROJECT TITLE: APPLICANT: ROBERTSON RANCH PA 7/8 PROJECT NO(S): PROJECT TITLE: APPLICANT: PLANNING SYSTEM/KLUKAS PAUL PROJECT NO(S): PROJECT TITLE: APPLICANT: TO: • • • • • • • Land Development Engineering O Police Department - J. Sasway CD Fire Department - Greg Ryan O Building Division-Will Foss CH Parks & Recreation (Parks/Trails) - Uz Ketabian ^ Parks & Recreation (Trees & Medians) - Kyle Lancaster O Public Works Department (Streets) Q Public Works Department (Traffic) - John Kim Q Public Works Department (Design) - David Ahles I I SANDAG (Any huge/major development) 401 B. Street, Suite 800, San Diego CA 92101-4231 FROM: PLANNING DIVISION^CJkWV-lSlSA ^fTff^^ Public Works (Storm Drain) - Clayton Dobbs Public Works (Wastewater) - Don Wasko Public Works (Water) - Eric Sanders Water/Sewer District Landscape Plancheck Consultant - PELA School District North County Transit District - Planning Dept. Sempra Energy-Land Management Caltrans (Send anything adjacent to 1-5) State of California Dept. of Transportation Planning Division, ATTN; Jacob Armstrong 4050 Taylor Street, MS 240 San Diego, CA 92110 Please review and submit written comments and/or conditions to the TRACKING DESK in LDE at 1635 Faraday Avenue, bv 10/23/14. If you have "No Comments," please so state. If vou determine that there are items that need to be submitted to deem the application "complete" for processing, please immediatelv contact the applicant and/or their representatives (via phone or e-mail) to let them know. Thank you COMMENTS: Signature Date PLANS ATTACHED Review & Comment 8/14 \ , CITY OF ^ CARLSBAD Memorandum October 31, 2014 To: Christer Westman, Planning From: Jeremy Riddle, Land Development Engineering SUBJECT: 2"" ENGINEERING REVIEW OF ROBERTSON RANCH WEST VILLAGE PA 7 & 8 (SDP 14-08/MS 14-07) Land Development Engineering division staff has completed a 2"^* review of the submittal package for this project. Based on our review, the application is still missing pertinent information for staff to perform a complete review of the project and is therefore deemed 'incomplete'. Below, we have provided a list of 'incomplete' items and 'engineering issues'. Prior to resubmittal, please have the applicant provide the 'incomplete' items and address the 'engineering issues': Incomplete Items 1. Response to PA 4 layout/configuration changes state they will be processed by CT 13- 03. Staff has not seen any progress on these changes. The revised final map and/or Substantial Conformance Exhibit have not been submitted for city review yet. Once substantial progress has been made for these changes, staff could support the PA 4 changes shown on these exhibits. 2. Provide a geotechnical report addressing subsurface site conditions, geotechnical feasibility, and proposed grading measures required for this project. 3. Revise the preliminary Storm Water Management Plan (SWMP) to include BMP/HMP sizing calculations for the detention vault/modular wetlands systems proposed on the Tentative Parcel Map. Although the preliminary SWMP was revised, it does not include clear sizing calculations for the modular wetlands systems and detention (hydromodification) vault. Refer to redlines and resubmit new copies ofthe preliminary SWMP. m Robertson Ranch West - IW7 & 8 October 31, 2014 Page 2 of 3 Engineering Issues 1. Submit a geotechnical report that includes design guidance on the use of onsite permeable pavement as it relates to soils with low infiltration rates. The preliminary SWMP indicates low soil permeability, therefore BMPs do not contemplate soil infiltration. However, exhibits on PA 7 & 8 include an extensive use of permeable pavement. Since these permeable areas affect the runoff rates (and BMP sizes), staff is seeking assurance their use is acceptable through the project. 2. Revise the preliminary SWMP to use the updated 303d listing and update the impaired water bodies this project drains to. Also clarify the land use types and refer to the updated Municipal Permit (Order No. 2013-0001). Address the other redlines on the returned preliminary SWMP. 3. Revise each sheet to show and callout dedication of public water easements to CMWD for onsite potable water systems, versus a general utility and access easement. 4. Coordinate with the Fire Marshal regarding the proposed preliminary fire hydrant locations and revise the design if necessary. Some of the hydrants appear too close to structures. Refer to redlines. 5. On sheet 9, clarify the height of fence/wall proposed along pool. 6. On sheet 9, provide a typical section where this project abuts PA 4 to demonstrate changes in grade as it relates to the adjacent property. Provide another typical section where the pedestrian ramp runs along Robertson Road. Refer to redlines. 7. On sheet 9, extend the vehicular pop-out paving near building 15 so the vehicle can back out. Refer to redline. 8. On sheet 9, revise the fire hydrant located in a parking stall. Coordinate with the fire marshal on approved locations. 9. On sheet 9, callout a proposed pedestrian access easement over a portion of PA for the benefit of PA 8. This appears necessary as the revised sidewalk design crosses over this adjacent lot. 10. On sheet 11, shift the waterline away from building 19. Refer to redlines. 11. Revise the exhibits to address all other the redlines (see attached). Attached are redlined SWMP and Site Plan/TPM exhibits for the project submittal. Please Robertson Ranch West - Wr! & 8 October 31, 2014 Page 3 of 3 return this redlines check print with the revised plans and studies to facilitate continued staff review. If you have any questions, please call me at 602-2737. Attachments Jason Geldert, Engineering Manager Engineering Project File October 13, 2014 TO: Christer Westman, Senior Planner Chris DeCerbo, Principal Planner Bridget Desmarais, Administrative Secretary Sabrina Michelson, Senior Office Specialist Cecelia Fernandez, Office Specialist FROM: Michael Elliott, City of Carlsbad's Contract Landscape Architect RE: Landscape Architectural Review - Conceptual Review - 2"** Review Robertson Ranch West Village, SDP 14-08, MS 14-07 El Camino Real MELA file: 536 - Robertson Ranch West Village - Con2 Landscape Architect: MJS Design Group, Phone: (949) 675-9964 Please advise the applicant to make the following revisions to the plans so that they will meet the requirements of the City of Carlsbad's Landscape Manual. Numbers below are referenced on the red line plans where appropriate for ease in locating the area of the comment concern. REPEAT COMMENTS 1. Completed. 2. Completed. 3. Please coordinate landscape plans with civil grading plans. Check all areas. Plans shall be prepared at the same size and scale as the site plan or grading plan. Plans shall be drawn on a 50% screen of the civil engineering grading plans. Submit a copy of the most current civil grading plans with the next submittal for cross checking. 4. Completed. 5. Please coordinate the limit of work line with work shown. 6. Completed. 7. Please provide typical details and indicate the materials and finishes of the retaining walls. Please also provide a cap with cantilever to provide a reveal. 2"'^ Review: Please indicate a cap cantilever to provide a reveal. 8. Please provide conceptual details of the entry monument walls. 2""^ Review: Wall materials should match the Robertson Ranch entry monumentation at West Ranch Street and El Camino Real; however plam for the West Ranch Street and El Camino Real monumentation have not yet been provided. Insure material continuity. Ifnot known at this point, please add a note indicating that materials will be matched with the Robertson Ranch entry monumentation. 9-13 Completed. 14. Please show and label all property lines, right-of-ways and existing and proposed easements on the plans. Insure no trees are located within public easements. 15. The plan shall demonstrate that plants, when installed and at maturity, will be positioned to avoid obstructing motorists' views of pedestrian crossings, driveways, roadways and other vehicular travel ways. On collector streets and larger, landscape elements over 30 inches in height (including planting measured at maturity) as measured from adjacent Robertson Ranch West Village October 13, 2014 Conceptual Plan Review Page 2 street grade are not permitted at street comers within a triangular zone drawn from two points, 25 feet outward from the beginning of curves. At medium to high use driveways, the 30 inch height limitation applies at driveways 25 feet from the edge of the apron outward along the curb, then 45 degrees in toward the property. Landscape features (shrubs, trees, fencing, etc.) shall be selected to ensure that no visual impairments or obstructions are located within the sight lines. Please show and label all vehicular sight lines on the plans and insure these requirements are met. 2"'^ Review: Please relocate the monuments outside of the vehicular sight lines. Several species listed are taller than 30 ". Please revise the list as appropriate for shrubs located within vehicular sight line triangles. Please note that trees will be required to have the canopy maintained at a minimum 6' height above the street surface. Add a note to plans as appropriate. 16-18 Completed. 19. Please provide a Maintenance Responsibility Exhibit. The Maintenance Responsibility Exhibit shall be prepared at a scale and size (preferably one sheet) that provides an overall view of the project and shall clearly identify the various areas of landscape maintenance responsibilities (private, common area/homeowners" association (HOA), City, etc). Clarify who is responsible for the maintenance of all landscape areas located on the property including areas outside the limit of work line (slopes and parkways). "Property Management Company" is not definitive. Clarify who is responsible (i.e. the property owner). 2"^ Review: Will the Robertson Ranch HOA maintain the monument? Please verify and revise the plan as appropriate. 20. Please note that an encroachment permit is required for the installation of any enhanced paving located within a public utility easement. Please coordinate with the civil to show all enhanced paving (where located within an easement) on the grading plans and indicate that an encroachment permit is required. 21. The Landscape Manual indicates that landscape plans are to feature ground cover, shrubs, and trees to screen elements of unsightliness and screen/soften new improvements. The Landscape Manual also indicates that landscaping shall be used to accentuate and enhance architecture. Please provide appropriate landscaping along all building elevations to both soften and enhance the architecture. 22-24 Completed. 25. All utilities are to be screened. Landscape construction drawings will be required to show and label all utilities and provide appropriate screening. Please also locate all light poles on the landscape plans and insure that there are no conflicts with trees. 26-27 Completed. 28. Trees shall be provided at the minimum rate of one per every four parking stalls. Trees pertaining to this requirement shall be located within the parking area, exclusive of parking lot setbacks. The trees shall be located in close proximity to the spaces they are to shade. Please address. Check all areas. 29. Completed. 30. Parking areas shall be screened from adjacent property or streets through the use of planting or any combination of planting, mounding, and decorative walls. Screening elements shall have a total height of at least three (3) feet. 2"^^ Review: A note has been added to the plans; however there are locations where the plans do not show the required screening. Please address on all sheets. 31. Completed. Robertson Ranch West Village October 13, 2014 Conceptual Plan Review Page 3 32. Long rows of parking should be broken up with landscaped islands. Landscaped islands should be provided at intervals of one island for approximately every 12 to 15 parking spaces. Please address. 33. Please provide/address the following: a. Completed. b. Provide a colored or hatched plan clearly showing where recycled water, graywater and potable water are proposed to be used for irrigation. This plan will be forwarded to the Carlsbad Municipal Water District for review. Any comments will be retumed to the applicant. 2"'^ Review: The water use plan has been forwarded to CMWD for review. Any comments will be returned to the applicant. c. Completed. d. Completed. 34. Include a statement on the plans signed under penalty of perjury by the person who prepared the plan that provides: "I am familiar with the requirements for landscape and irrigation plans contained in the city of Carlsbad's landscape manual and water efficient landscape regulations. I have prepared this plan in compliance with those regulations and the landscape manual and agree to comply with all requirements when submitting constmction documents. I certify that the plan implements those regulations to provide efficient use of water." 2"'^ Review: Please sign the statement. 35-40 Completed. 41. Per the Robertson Ranch West Village Specific Plan, page III-32: "A minimum of 100 square feet of Community Recreation Facilities per dwelling unit shall be provided on- site within Planning Area 7 (for apartments). Recreation area for condominiums shall be provided at 150 square feet per unit. Community recreational space shall be provided as both passive and active recreational facilities for a variety of age groups. Community recreational space shall be centrally located in relationship to all project units." Please address this requirement. 2"'^ Review: Please provide a calculation that shows this requirement has been met. 42. Per the Robertson Ranch West Village Specific Plan, page III-35: "Bicycle storage lockers shall be provided for residential units." Please address. 43. Per the Robertson Ranch West Village Specific Plan, page III-40: "A minimum of 100 square feet of Community Recreation Facilities per dwelling unit shall be provided on- site within Planning Area 8 (for apartments). A minimum of 150 square feet of Recreation Facilities shall be provided for condominium projects." Please provide a calculation that shows this requirement has been met. 44. Completed. 45. Per the Robertson Ranch West Village Specific Plan, page III-43: "Bicycle storage lockers shall be provided for residential units." Please address. 46. Per the Robertson Ranch West Village Specific Plan, page III-126: "The intent of the landscape design theme is to incorporate a mountain resort character into the various landscaping components throughout the community..." Please explain how this design concept is provided. 47-48 Completed. 48 RETURN REDLINES and provide 2 copies of all plans (concept, water conservation, and colored water use plan) for the next submittal. Please provide a Robertson Ranch West Village October 13, 2014 Conceptual Plan Review Page 4 written response to all comments clearlv indicating where and how each comment was addressed. NEW COMMENTS 1 A. Civil plans provide for an 18" soil depth in the bio-retention areas and an impermeable liner. Please coordinate the bio-retention area soil depths with the civil to allow the tree plantings. Provide a copy of revised civil plans that show appropriate depths with the next submittal for cross checking. Check all sheets, all areas. 2A. Please address all landscape areas. 3 A. Please revise to 3" depth to meet Landscape Manual requirements. 4A. Please provide evergreen trees to screen/soften the project from the adjacent homes. 5A. The Robertson Ranch Master Plan calls for a 6' theme wall (split face block) without glass along El Camino Real. Please resolve. 6A. It is not clear where the decorative tubular steel fence (detail C, sheet L3 .2) is used as opposed to the tubular steel fence (detail D, sheet L3.3). Please clarify. 7A. Pilasters should match the site wide community theme wall pilasters (battered stone) to provide continuity. Please address. 8A. Please coordinate the retaining wall cap with the community theme wall cap. 9A. Please add a note to plans indicating that "All project signage and monuments shall require a separate permit under the City of Carlsbad signage review process." • • CITY OF CARLSBAD REVIEW AND COMMENT MEMO DATE: JUNE 30, 2014 PROJECT NO(S): PROJECTTITLE: APPLICANT: SDP 14-08/MS 14-07 REVIEW NO: 1 PROJECT NO(S): PROJECTTITLE: APPLICANT: ROBERTSON RANCH WEST VILLAGE PROJECT NO(S): PROJECTTITLE: APPLICANT: PLANNING SYSTEMS FOR RANCHO COSTERA, LLC PROJECT NO(S): PROJECTTITLE: APPLICANT: TO: Land Development Engineering-Jeremy Riddle • Public Works (Storm Drain) - Clayton Dobbs Police Department - J. Sasway • Public Works (Wastewater) - Don Wasko Fire Department - Greg Ryan • Public Works (Water) - Eric Sanders Building Division - Will Foss • Water/Sewer District • Parks & Recreation (Parks/Trails) - Liz Ketabian Landscape Plancheck Consultant - PELA • Parks & Recreation (Trees & Medians) - Morgan • School District Rockdale • Public Works Department (Streets) - Nick Roque • North County Transit District - Planning Dept. • Public Works Department (Traffic) - John Kim • Sempra Energy - Land Management • Public Works Department (Design) - Patrick Vaughan • Caltrans (Send anything adjacent to 1-5) • SANDAG (Any huge/major development) 401 B. Street, Suite 800, San Diego CA 92101-4231 •ALWAYS SEND EXHIBITS FROM: PLANNING DIVISION/CHRISTER WESTMAN Please review and submit written comments and/or conditions to the TRACKING DESK in LDE at 1635 Faraday Avenue, bv 7/21/14. If you have "No Comments," please so state. If vou determine that there are items that need to be submitted to deem the application "complete" for processing, please immediatelv contact the applicant and/or their representatives (via phone or e-mail) to let them know. Thank you COMMENTS: ^/?) <Am^A^(^^ J^U^ ^ -^HynPj Signatun PLOiNS ATTACHED Review & Comment 4/14 4^c,Tvo. F/LE V (CARLSBAD Community & Economic Development www.carlsbadca.gov PLANNING COMMISSION NOTICE OF DECISION April 2, 2015 PaulJ. Klukas Planning Systems 1530 Faraday Ave, Suite 100 Carlsbad, CA 92008 SUBJECT: MP 02-03{G)/SDP 14-08/SUP 14-04/MS 14-07 - ROBERTSON RANCH WEST VILLAGE PLANNING AREAS 7 8i 8 At the April 1, 2015 Planning Commission meeting, your application was considered. The Commission voted 4-0 to recommend approval of your request. The decision of the Planning Commission is advisory and will be forwarded to the City Council. If you have any questions regarding the final dispositions of your application, please contact your project planner Christer Westman at (760) 602-4614 or christer.westmang)carlsbadca.eov. Sincerely, DON NEU, AlCP City Planner DN:CW:bd c: Data Entry File enc: Planning Commission Resolution No. 7093 Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 © Christer Westman From: Sent: To: Cc: Subject: Jill <Jillagosti@sbcglobal.net> March 20, 2015 11:11 AM Christer Westman jepstine@tollbrothersinc.com; 'Greg Agosti (greg Agosti)' FW: Planning Commission Public Hearing Notice Thank you Christer for further explanation of the two uses in PA 8 and clarifications. "Master Plan Amendment" certainly got our attention! We have no objections to proposed change. Sincerely, Jill Agosti From: CityofCarlsbad [mailto:karen.whitehead@carlsbadca.ccsend.com] On Behalf Of City of Carlsbad Sent: Thursday, March 19, 2015 4:01 PM To: jillagosti@sbcglobal.net Subject: Planning Commission Public Hearing Notice Quick Links Meeting Calendar Laws & Policies Public Records City Charter Boards & Commissions Planning Update The most recent Planning Commission Public Hearing Notice update is now available on the citv's website. Contact Us City of Carlsbad plannlnoiScarlsbadca .gov 760-602-4610 1635 Faraday Ave. Carlsbad, CA 92008 <^c,rvo. " " aFILE ViCARLSBAD Community & Economic Development www.carlsbadca.gov March 10, 2015 PaulJ. Klukas Planning Systems 1530 Faraday Ave, Suite 100 Carlsbad, CA 92008 SUBJECT: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 - ROBERTSON RANCH WEST VILLAGE PA 7 8i 8 The preliminary staff report for the above referenced project will be sent to you via email on Wednesday, Apfil—VWWZc-W 18, 2015. This preliminary report will be discussed by staff at the Development Coordinating Committee (DCC) meeting which will be held on March 23, 2015. A twenty (20) minute appointment has been set aside for you at 9:30. If you have any questions concerning your project you should attend the DCC meeting. It is necessary that you bring the following required information with you to this meeting or provide it to your planner prior to the meeting in order for your project to go forward to the Planning Commission: 1. Unmounted colored exhibit(s) of your site plan and elevations. For residential projects of 2 or more homes a typical street scene of the elevations shall be provided. The corresponding rear elevations for the homes shown for the typical street scene shall also be provided; and 2. A PDF of your colored site plan and elevations. The colored exhibits must be submitted at this time to ensure review by the Planning Commission at their briefings. If the colored exhibits are not available for their review, vour proiect could be rescheduled to a later time. The PDF of your colored site plan and elevations will be used in the presentation to the Planning Commission and the public at the Planning Commission Hearing. If you do not plan to attend this meeting, please make arrangements to have your colored exhibit(s) and the PDF here by the scheduled time above. Should you wish to use visual materials in your presentation to the Planning Commission, they should be submitted to the Planning Division no later than 12:00 p.m. on the day of a Regular Planning Commission Meeting. Digital materials will be placed on a computer in Council Chambers for public presentations. Please label all materials with the agenda item number you are representing. Items submitted for viewing, including presentations/digital materials, will be included in the time limit maximum for speakers. All materials exhibited to the Planning Commission during the meeting (slides, maps, photos, etc.) are part of the public record and must be kept by the Planning Division for at least 60 days after final action on the matter. Your materials will be returned upon written request. If you need additional information concerning this matter, please contact your Planner, Christer Westman at (760) 602-4614 or at christer.westman@carlsbadca.gov. Sincerely, DON NEU, AlCP City Planner DN:CW:bd c: File Copy Jeremy Riddle, Project Engineer Data Entry Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 © ^ • • )/[ai}<ddl\\\i^ V (CARLSBAD r ILt Community & Economic Development www.carlsbadca.gov February 10, 2015 Paul Klukas Planning Systems Suite 100 1530 Faraday Avenue Carlsbad, CA 92008 SUBJECT: MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 - ROBERTSON RANCH WEST VILLAGE PA 7 8i 8 - CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) APPLICABILITY/PROCESS DETERMINATION AND TARGET DECISION DATE CEQA Determination: This is to advise you that after reviewing the application for the project referenced above, the City has determined that the following environmental review process (pursuant to CEQA) will be required for the project: This is to advise you that after reviewing the application for the project amendment referenced above, the City has determined that the project is subject to the provisions of CEQA; however, the potential environmental effects of the project were adequately analyzed by the previously Certified EIR 03 03 for the ROBERTSON RANCH MASTER PLAN and the Mitigated Negative Declaration adopted for the Robertson ranch West Village MP 02-03(C). No additional environmental review is required. A Notice of Determination will be filed after approval of the project amendment with the San Diego County Clerk's Office which involves a filing fee. Please submit a check to the project planner in the amount of $50.00 made out to the San Diego County Clerk. The check should be submitted approximately one week prior to the Planning Commission hearing decision date. Target Decision Date: In the interest of expeditiously processing your application consistent with the State Permit Streamlining Act (California Government Code Section 65950), the project should be scheduled for a public hearing no later than August 5, 2015. Therefore, in the interest of achieving that decision date/hearing date, all remaining project issues must be addressed by May 1, 2015. If all project issues are not resolved by the date listed above, you may formally request a one-time 90 day application extension. Otherwise, you will need to withdraw the application. For additional information related to this CEQA applicability/process determination or should you have any questions regarding an application extension or would like to withdraw your application, please contact Christer Westman at (760) 602-4614 or by email at christer.westman(S)carlsbadca.gov. Sincerely, DON NEU, AlCP City Planner DN:CW:fn c; Chris DeCerbo, Principal Planner Jeremy Riddle, Project Engineer Michele Masterson, Senior Management Analyst File Copy Data Entry Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 © VXARLSBAD riLII Community & Economic Development www.carlsbadca.gov February 2, 2015 Paul Klukas Planning Systems Suite 100 1530 Faraday Avenue Carlsbad, CA 92008 SUBJECT: 3rd REVIEW FOR MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 - ROBERTSON RANCH WEST VILLAGE PA 7 & 8 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Division has reviewed your development applications no. MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07, as to its completeness for processing. The items requested from you earlier to make your development application complete have been received and reviewed by the Planning Division. It has been determined that the application is .now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Any issues should be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise supplement the basic information required forthe application. At this time, the City asks that you provide 3 complete sets of the development plans so that the project can continue to be reviewed. The Citv will complete the review of vour resubmittal within 25 davs. In order to expedite the processing of your application, you are strongly encouraged to contact your Staff Planner, Christer Westman, at (760) 602-4614, to discuss or to schedule a meeting to discuss your application and to completely understand this letter. You may also contact each commenting department individually as follows: • Land Development Engineering Division: Jeremy Riddle, Associate Engineer, at (760) 602-2737 • Fire Department: Gregory Ryan, Fire Inspections, at (760) 602-4661 Sincerely, CHRIS DeCERBO Principal Planner CD:CW;fn c: Shapell SoCal Rental Properties, LLC, Suite 700, 8383 Wilshire Boulevard, Beverly Hills, CA 90211 Don Neu, City Planner Jeremy Riddle, Project Engineer Chris DeCerbo, Principal Planner Michele Masterson, Senior Management Analyst File Copy Data Entry Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 © l/SDP 14-08/SU^-04/MS 14-07 - ROBERTSON RANCH WEP^ILLAGE PA 7 8t 8 015 ISSUES OF CONCERN Planning: 1. The El Camino Real Corridor Development Standards are intended to serve as specific guidelines to development along the El Camino Real Corridor. Where practical application ofthe standards is not feasible and not in the best interest of good planning practices, deviations to the standards may be approved by the Planning Commission. The proposed project is within the Area 3 segment of the corridor. Standards #s 1, 2, 3, 4, 6, 8, 9, and 11 of the ECRC were applicable to the grading design and street improvements established by Tentative Tract Map CT 13-03. Standard # 5, building height, was modified for Planning Area 7 by the Robertson Ranch Master Plan and allows a maximum building height of 40 feet. Standards # 7 and 10 apply to the proposed multi-family buildings of Planning Area 7. The provided written feasibility analysis regarding the proposed building setbacks from the El Camino Real right-of-way is under review. Engineering: Address the minor redline plans enclosed. Landscape: Please review the landscape comments memorandum dated January 8, 2015 by Michael Elliott and address the redline plans enclosed. PLANNING SYSTEMS n • LAND USE/COASTAL PLANNING LANDSCAPE ARCHITECTURE • LA3900 POLICY AND PROCESSING ENVIRONMENTAL MITIGATION December 24, 2014 OEC 3 0 2014 Mr. Christer Westman CITYOFCARLSBAD I? <: I ;0 Plarming Department 1635 Faraday Ave. Carlsbad, CA 92008 SUBJECT: RESPONSE TO 2nd REVIEW SDP 14-08/MS 14-07 ROBERTSON RANCH WEST VILLAGE PA 7 & 8 Dear Mr. Westman: Per your letter dated November 6, 2014, identifying Staff items and issues with the submittal package of the above-referenced application package and plans, Shapell Homes has commissioned modifications to the documents and plans as requested. To this end, attached with this cover letter please find the following: • Five (5) copies of the revised Site Development Plan set (architecture (senior housing and apartments), engineering and landscape architecture) • Two (2) copies of revised Soils Report and letters dated Nov. 13, 2014 and June 16, 2014. • Two (2) copies of revised SWMP by O'Day Consultants • Redlined plans (retum) Below are responses and methods that we are addressing the City comments, in the order of comments listed in the November 6 letter. LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION Planning: None Engineering: 7. Response to PA 4 layout/configuration changes state they will be processed by CT 13-03. Staff has not seen any progress on these changes. The revised final map and/or Substantial Conformance Exhibit have not been submitted for city review yet. Once substantial progress has been made for these changes, staff could support the PA 4 changes shown on these exhibits. Response: O'Day Consultants have submitted to the City for review a Substantial Conformance exhibit which shows the proposed lot configuration of PA 4. We are hopeftil that the City review of this SCE will demonstrate substantial progress on the proposed change. 2. Provide a geotechnical report addressing subsurface site conditions, geotechnical feasibility, and proposed grading measures required for this project. 1 1530 FARADAYAVENUE • SUITE 100 • CARLSBAD, CA92008 • (760) 931-0780 • FAX (760) 931-5744 • info@planningsysteins.net Response: Included with this resubmittal package are two copies of the Soils Reports prepared by LGC Valley, Inc. and a letter dated June 16, 2014, clarifying the subsurface conditions and lot and building pad overexcavation necessary to construct the project. 3. Revise the preliminary Storm Water Management Plan (SWMP) to include BMP/HMP sizing calculations for the detention vault/modular wetlands systems proposed on the Tentative Parcel Map. Although the preliminary SWMP was revised, it does not include clear sizing calculations for the modular wetlands systems and detention (hydromodification) vault. Refer to redlines and resubmit new copies of the preliminary SWMP. Response: O'Day Consultants has revised the Preliminary SWMP, including the justification for using porous pavement, and the modular wetland sizing recommendations from the manufacturer. The hydromodification sizing calculations from Tory Walker Engineering is also included. ISSUES OF CONCERN Planning: 1. The El Camino Real Corridor Development Standards are intended to serve as specific guidelines to development along the El Camino Real Corridor. Where practical application of the standards is not feasible and not in the best interest of good planning practices, deviations to the standards may be approved by the Planning Commission. The proposed project is within the Area 3 segment of the corridor. -Standards Us I, 2, 3, 4, 6, 8, 9, and 11 of the ECRC were applicable to the grading design and street improvements established by Tentative Tract Map CT 13-03. Standard #5, building height, was modified for Planning Area 7 by the Robertson Ranch Master Plan and allows a maximum building height of 40 feet. Standards #7 and 10 apply to the proposed multi-family buildings of Planning Area 7. Please provide a written feasibility analysis regarding the proposed building setbacks from the El Camino Real right-of-way. Response: The proposed project includes a much greater setback (112 ft vs. 40 ft) than required. But the top of slope setback is 5 feet shorter than that required. The purpose of the setback standard is to "maintain and enhance the appearance of the El Camino Real roadway area", and to "retain the natural rolling hillside qualities". The proposed project has provided a 112-foot setback, which contains a heavily-landscaped contour-graded slope. This slope provides a resemblance to natural rolling hillsides to a greater degree than would the minimum 40-foot setback slope. A glass noise wall will be provided at the top of slope, as required by the EIR and the Master Plan. The ECRC provides findings which allow for some flexibility and deviation from the standards. In approving such deviations, the Planning Commission must make the following findings (listed 'a' thru 'd', with justification provided): a) Compliance with a particular standard is infeasible for a particular proiect, It is our opinion that it is infeasible to shift the buildings northerly 5-feet in order to achieve the 15- foot top-of-slope setback because the PA 7 site is relatively shallow and the plan needs to meet street grade on the north side. A shift of the development site layout 5-feet to the north would result in the needs for retaining walls, and a steepening of the driveways, including the 5% slope secondary driveway which contains perpendicular parking spaces running down each side of the driveway. In short, the property is constrained by the necessary horizontal and vertical dimensions of the site, and shifting of the site plan will; (a) increase the slope ofthe entry driveways, (b) make the parking spaces more difficult to use, and (c) result in the need for retaining walls on the north end. Making-up the 5- feet in the buildings, would necessitate a reduction in the depth of the buildings, which would also be undesirable inasmuch as a separate [smaller] building floor plan would need to be compiled for this PLANNING SYSTEMS site only. This change would result in a less-desirable [smaller] floor plan for a project which includes moderate-priced housing. City policy generally discourages reduced floor plans for affordable housing units. Also, the Master Plan stipulates 116 units for the PA 7 property. The project proposes 96 units for PA 7, which is already 20 units less than the number which was originally anticipated per the Master Plan. The applicant is requesting a master plan amendment in order to bring the Master Plan in line with the proposed project. Increasing the top-of-slope setback could only result in reducing this number of units further, which would be contrary to the intent of the Master Plan. The Master Plan requires a minimum 20 du/ac density for PA's 7 and 8 together. A reduction in the number of units would reduce this density to below that required. b) That the scenic qualities of the corridor will continue to be maintained if the standard is not fiilfilled. The scenic qualities of the ECR corridor will continue to be maintained and even enhanced because the proposed ROW setback (112 ft or more) are significantly greater than the setback required (40 ft). This setback will contain heavily-landscaped contour-graded slopes, which will; (a) maintain a rolling hillside open space ambiance along ECR, and (b) keep the urban development over twice as far away from ECR as would be otherwise allowed. It is our conclusion that the reduced top-of-slope setback is more than made up by the increased overall ROW setback and extensive landscaping proposed. Further, the project will enhance the appearance ofthe El Camino Real roadway and contribute to the desired easily-identifiable homogeneous single design concept for ECR through the proposed extensive building setback, and heavily-landscaped corridor adjacent to the ECR right-of-way. An additional increased setback of 10 or so more feet fi-om the top of slope at this distance will not improve the visual impact significantly. The altemative solutions of creating a top of slope retaining wall, or lowering the site pad overall will both, in our opinion, create greater negative visual impacts. The proposed design complies with the two findings for modification in 21.95 referenced above. c) That the proiect will not have an adverse impact on traffic safety, and The proposed top-of-slope setback deviation will not affect traffic safety. All lines-of-sight and vehicular roadways and drives will continue to be maintained. Traffic safety along El Camino Real will be maintained. d) That the proiect is designed so as to meet the intent of the scenic preservation overlay zone. The proposed project conforms to the intent of the Scenic Preservation Overlay in that it provides a significantly greater than required setback from the ROW, the design theme for ECR is maintained; the deyelopment will provide a distant building mass which will preclude a "tunnel effect" of buildings along the roadway; the project will include screening the roof equipment of the development; it will preserve scenic views; and maintaining traffic safety along El Camino Real. The proposed project implements the goals and objectives of the General Plan in that it is consistent with the Robertson Ranch Master Plan. The Robertson Ranch Master Plan has been found to comply with all applicable General Plan Goals, Objectives, and Policies, including Land Use. The project is consistent with the Master Plan and, therefore, is also in compliance with the General Plan. Engineering: 1. Submit a geotechnical report that includes design guidance on the use of onsite permeable pavement as it relates to soils with low infiltration rates. The preliminary SWMP indicates low soil permeability, therefore BMPs do not contemplate soil infiltration. However, exhibits on PA 7 PLANNING SYSTEMS & 8 include an extensive use of permeable pavement. Since these permeable areas affect the runoff rates (and BMP sizes), staff is seeking assurance their use is acceptable through the project. Response: The section ofthe Soils Report from GeoSoils Inc. regarding percolation rates has been included in the revised Preliminary SWMP. Justification for the use of porous pavement has also been added to the SWMP. 2. Revise the preliminary SWMP to use the updated 303d listing and update the impaired water bodies this project drains to. Also clarify the land use types and refer to the updated Municipal Permit (Order NO. 2013-0001). Address the other redlines on the retumed preliminary SWMP. Response: The Preliminary SWMP has been revised to update the 303d listing of impaired water bodies, and have clarified the land use types, as requested.. 3. Revise each sheet to show and callout dedication ofpublic water easements to CMWD for onsite potable water systems, versus a general utility and access easement Response: The sheets have been revised as requested, including removal ofthe general utility and access easement, and the addition of a public water easement. 4. Coordinate with the Fire Marshal regarding the proposed preliminary fire hydrant locations and revise the design if necessary. Some of the hydrants appear too close to structures. Refer to redlines. Response: We have met with the Fire Marshal as suggested to discuss the locations of fire hydrants. Per the Fire Marshal's suggestion, several of the fire hydrants have been moved further away from buildings.. 5. On sheet 9, clarijy the height offence/wall proposed along pool. Response: The fence height has been added along the pool. 6. On sheet 9, provide a typical section where this project abuts PA 4 to demonstrate changes in grade as it relates to the adjacent property. Provide another typical section where the pedestrian ramp runs along Robertson Road. Refer to redlines. Response: We have added cross sections at PA 4, as suggested. 7. On sheet 9, extend the vehicular pop-out paving near building 15 so that vehicle can back out. Refer to redline. Response: The vehicular pop-out has been extended near building 15 as suggested. 8. On sheet 9, revise the fire hydrant located in a parking shall. Coordinate with the fire marshal on approved locations. Response: The subject fire hydrant has been removed from the parking stall in the revised plan set. 9. On sheet 9, callout a proposed pedestrian access easement over a portion of PA for the benefit of PA 8. This appears necessary as the revised sidewalk design crosses over this adjacent lot. PLANNING SYSTEMS Response: A net for a pedestrian access easement on PA 4 has been added as suggested. 10. On sheet 11, shift the waterline away from building 19. Refer to redlines. Response: The water main has been shifted away from building 19 as suggested. 11. Revise the exhibits to address all other redlines (see attached). Response: All other redline comments have been completed on the revised plan set. Landscaping REPEAT COMMENTS 1. Completed. 2. Completed. 3. Please coordinate landscape plans with civil grading plans. Check all areas. Plans shall be prepared at the same size and scale as the site plan or grading plan. Plans shall be drawn on a 50% screen of the civil engineering grading plans. Submit a copy of the most current civil grading plans with the next submittal for cross checking. Response: Plan sizes have been modified to scale and match the Civil plan set. The Civil grading has been screened back on the landscape drawings. 4. Completed. 5. Please coordinate the limit of work line with work shown. Response: Noted. No proposed work is now shown outside of limit of work line. 6. Completed. 7. Please provide typical details and indicate the materials and finishes of the retaining walls. Please also provide a cap witl cantilever to provide a reveal. Please also provide a cap with cantilever to provide a reveal. 2"'' Review: Please indicate a cap Response: Please see the new wall and fence exhibits. The design of the walls has been clarified. 8. Please provide conceptual details of the entry monument walls. 2"'' Review: Wall materials should match the Robertson Ranch entry monumentation at West Ranch Street and El Camino Real; however plans for the West Ranch Street and El Camino Real monumentation have not yet been provided. Insure material continuity. Ifnot known at this point, please add a note indicating that materials will be matched with the Robertson Ranch entry monumentation. Response: All signage monumentation has been clarified to match the architectural style and character. 9-13. Completed. 14. Please show and label all property lines, right-of-ways and existing and proposed easements on the plans. Insure no trees are located within public easements. PLANNING SYSTEMS Response: The recommended changes have been made on the revised plan set. 15. The plan shall demonstrate that plants, when installed and at maturity, will be positioned to avoid obstructing motorists' views of pedestrian crossings, driveways, roadways and other vehicular travel ways. On collector streets and larger, landscape elements over 30 inches in height (including planting measured at maturity) as measured from adjacent street grade are not permitted at street corners within a triangular zone drawn from two points, 25 feet outward from the beginning of curves. At medium to high use driveways, the 30 inch height limitation applies at driveways 25 feet from the edge of the apron outward along the curb, then 45 degrees in toward the property. Landscape features (shrubs, trees, fencing, etc.) shall be selected to ensure that no visual impairments or obstructions are located within the sight lines. Please show and label all vehicular sight lines on the plans and insure these requirements are met 2"'' Review: Please relocate the monuments outside of the vehicular sight lines. Several species listed are taller than 30 ". Please revise the list as appropriate for shrubs located within vehicular sight line triangles. Please note that trees will be required to have the canopy maintained at a minimum 6' height above the street surface. Add a note to plans as appropriate. Response: The note regarding plant and shrub height has been added to the plans as requested. 16-18. Completed. 19. Please provide a Maintenance Responsibility Exhibit. The Maintenance Responsibility Exhibit shall be prepared at a scale and size (preferably one sheet) that provides an overall view of the project and shall clearly identify the various areas of landscape maintenance responsibilities (private, common area/homeowners " association (HOA), City, etc). Clarify who is responsible for the maintenance of all landscape areas located on the property including areas outside the limit of work line (slopes and parkways). "Property Management Company " is not definitive. Clarify who is responsible (i.e. the property owner). 2"^ Review: Will the Robertson Ranch HOA maintain the monument? Please verify and revise the plan as appropriate. Response: The Robertson Ranch HOA will maintain the monument signage. Please refer to the wall and fence exhibits. 20. Please note that an encroachment permit is required for the installation of any enhanced paving located within a public utility easement. Please coordinate with the civil to show all enhanced paving (where located within an easement) on the grading plans and indicate that an encroachment permit is required. Response: The requested change has been made to the review plan set. 21. The Landscape Manual indicates that landscape plans are to feature ground cover, shrubs, and trees to screen elements of unsightliness and screen/soften new improvements. The Landscape Manual also indicates that landscaping shall be used to accentuate and enhance architecture. Please provide appropriate landscaping along all building elevations to both soften and enhance the architecture. Response: The revised plans include additional planting areas and planters within the motorcourts to soften and enhance the architecture, as requested. 22-24. Completed. PLANNING SYSTEMS 25. All utilities are to be screened. Landscape construction drawings will be required to show and label all utilities and provide appropriate screening. Please also locate all light poles on the landscape plans and insure that there are no conflicts with trees. Response: Light poles have been located on the landscape plans and confiicts with trees have been avoided. 26-27 Completed. 28. Trees shall be provided at the minimum rate of one per every four parking stalls. Trees pertaining to this requirement shall be located within the parking area, exclusive of parking lot setbacks. The trees shall be located in close proximity to the spaces they are to shade. Please address. Check all areas. Response: Parking lot and slope planting trees have been shown on the landscape plans. 29. Completed. 30. Parking areas shall be screened from adjacent property or streets through the use ofplanting or any combination of planting, mounding, and decorative walls. Screening elements shall have a total height of at least three (3) feet. 2"^ Review: A note has been added to the plans; however there are locations where the plans do not show the required screening. Please address on all sheets. Response: Screening has been added along the adjacent property. Please see the revised plant palette on sheet L 1.2. 31. Completed. 32. Long rows of parking should be broken up with landscaped islands. Landscaped islands should be provided at intervals of one island for approximately every 12 to 15 parking spaces. Please address. Response: Landscaped islands have been provided where the site plan allows on the revised landscape plan. 33. Please provide/address the following: a. Completed. b. Provide a colored or hatched plan clearly showing where recycled water, graywater and potable water are proposed to be usedfor irrigation. This plan will be forwarded to the Carlsbad Municipal Water District for review. Any comments will be returned to the applicant. 2"'' Review: The water use plan has been forwarded to CMWD for review. Any comments will be returned to the appUcant. c. Completed. d. Completed. Response: No response needed. 34. Include a statement on the plans signed under penalty ofperjury by the person who prepared the plan that provides: "I am familiar with the requirements for landscape and irrigation plans contained in the city of Carlsbad's landscape manual and water efficient landscape regulations. I have prepared this plan in compliance with those regulations and the landscape manual and agree to comply with all requirements when submitting construction documents. I certify that the PLANNING SYSTEMS plan implements those regulations to provide efficient use of water." 2""^ Review: Please sign the statement. Response: The referenced statement has been signed. 35-40. Completed. 41. Per the Robertson Ranch West Village Specific Plan, page III-32: "A minimum of 100 square feet of Community Recreation Facilities per dwelling unit shall be provided on-site within Planning Area 7 (for apartments). Recreation area for condominiums shall be provided at 150 square feet per unit Community recreational space shall be provided as both passive and active recreational facilities for a variety of age groups. Community recreational space shall be centrally located in relationship to all project units." Please address this requirement 2"^ Review: Please provide a calculation that shows this requirement has been met Response: Please see the architectural plans for the recreational space calculation table. 42. Per the Robertson Ranch West Village Specific Plan, page III-35: "Bicycle storage lockers shall be provided for residential units. " Please address. Response: Bicycle storage lockers have been provided on the revised set of plans. Please see the revised Landscape Concept plan. 43. Per the Robertson Ranch West Village Specific Plan, page III-40: "A minimum of 100 square feet of Community Recreation Facilities per dwelling unit shall be provided on-site within Planning Area 8 (for apartments). A minimum of 150 square feet of Recreation Facilities shall be provided for condominium projects. " Please provide a calculation that shows this requirement has been met. Response: Please see the architectural plans for the recreational space calculation table. 44. Completed. 45. Per the Robertson Ranch West Village Specific Plan, page III-43: "Bicycle storage lockers shall be provided for residential units." Please address. Response: The project has been revised to include bicycle storage lockers. Please see the revised Landscape Concept plan. 46. Per the Robertson Ranch West Village Specific Plan, page III-l 26: "The intent of the landscape design theme is to incorporate a mountain resort character into the various landscaping components throughout the community... " Please explain how this design concept is provided. Response: Please see sheet L 1.7 for the planting theme note. A mountain resort character is provided through careful integration of hardscape and landscape elements, a luxurious ambience, and picturesque surroundings. The project is consistent with the Master Plan. 47-48 Completed. 49. RETURN REDLINES and provide 2 copies of all plans (concept, water conservation, and colored water use plan) for the next submittal. Please provide a written response to all comments clearlv indicating where and how each comment was addressed. PLANNING SYSTEMS NEW COMMENTS lA. Civil plans provide for an 18" soil depth in the bio-retention areas and an impermeable liner. Please coordinate the bio-retention area soil depths with the civil to allow the tree plantings. Provide a copy of revised civil plans that show appropriate depths with the next submittal for cross checking. Check all sheets, all areas. Response: Tree locations have been coordinated with the civil draawings. 2A. Please address all landscape areas. Response: Please see the revised Landscape Concept Plans. 3A. Please revise to 3 " depth to meet Landscape Manual requirements. Response: The requested change has been made. Please see revised sheet L. 1.7. 4A. Please provide evergreen trees to screen/soften the project from the adjacent homes. Response: Evergreen tirees have been provided in planting areas adjacent to homes. Please see the revised Landscape Concept Plans. 5A. The Robertson Ranch Master Plan calls for a 6' theme wall (split face block) without glass along El Camino Real. Please resolve. Response: The applicant is proposing to provide the Sound/View wall along El Camino Real in order to achieve better aesthetics and to capture the view from the site to Agua Hedionda Lagoon to the west. We believe this to be generally consistent with the Master Plan. Note that Pg. Ill-178 of the Master Plan allows that "Where views and noise attenuation are desirable, a combination sound/view wall may be used." 6A. It is not clear where the decorative tubular steel fence (detail C, sheet L3.2) is used as opposed to the tubular steel fence (detail D, sheet L3.3). Please clarify. Response: Please see the revised wall and fence plan. 7A. Pilasters should match the site wide community theme wall pilasters (battered stone) to provide continuity. Please address. Response: The proposed wall pilasters match the community theme and architecture ofthe site. Battered stone is not specifically being used on this development. The Master Plan allows such flexibility. For example, Master Plan Figure No. III-56 is labeled "Conceptual Theme Walls and Fence Details [emphasis added]." 8A. Please coordinate the retaining wall cap with the community theme wall cap. Response: The retaining wall and theme wall cap has been coordinated throughout Please see the revised details. 9A. Please add a note to plans indicating that "Allproject signage and monuments shall require a separate permit under the City of Carlsbad signage review process. " PLANNING SYSTEMS Response: This note has been added throughout the revised Wall and Fence plan sheets, as requested. We look forward to scheduling this project for public hearings. Sincerely, Paul J. Klukas Director ofPlanning Matt Fausett Doug Griffith PLANNING SYSTEMS OF QFILE Vc ARLSBAD L-JFII-I- Community & Economic Development www.carlsbadca.gov November 12, 2014 Paul Klukas Planning Systems 1530 Faraday Avenue, Suite 100 Carlsbad CA 92008 SUBJECT: 2nd REVIEW FOR MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 - ROBERTSON RANCH WEST VILLAGE PA 7 8i 8 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Division has reviewed your development, applications no. MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07, as to its completeness for processing. All of the items requested of you earlier have not been received and therefore your application is still deemed incomplete. Listed below are the item(s) still needed in order to deem your application as complete. This list of items must be submitted directly to your staff planner; therefore, please contact your staff planner directly to schedule a re-submittal appointment. Please prepare and include with your re-submittal: (1) a copy of this list; (2) a detailed letter summarizing how all identified incomplete items have been addressed; and (3) five (5) sets of revised plans. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, June 30, 2014, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. In order to expedite the processing of your application, you are strongly encouraged to contact your Staff Planner, Christer Westman, at (760) 602-4614, to discuss or to schedule a meeting to discuss your application and to completely understand this letter. You may also contact each commenting department individually as follows: • Land Development Engineering Division: Jeremy Riddle, Associate Engineer, at (760) 602-2737. • Fire Department: Gregory Ryan, Fire Inspections, at (760) 602-4661. Sincerely, CHRIS DeCERBO Principal Planner CD:CW:bd c: Shapell SoCal Rental Properties, LLC. Suite 700 8383 Wilshire Boulevard Beverly Hills CA 90211 Don Neu, City Planner Jeremy Riddle, Project Engineer Chris DeCerbo, Principal Planner Michele Masterson, Senior Management Analyst File Copy Plannirfa^t^Py^sion 1635 FaradayAvenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 ® P^-04/MS 14-07 - ROBERTSON RANCH WE^I MP 02-03(G)/SDP 14-08/SUP W-04/MS 14-07 - ROBERTSON RANCH WESTVILU\GE PA 7&8 November 12, 2014 Page 2 UST OF ITEMS NEEDED TO COMPLETE THE APPLICATION Engineering: 1. Response to PA 4 layout/configuration changes state they will be processed by CT 13-03. Staff has not seen any progress on these changes. The revised final map and/or Substantial Conformance Exhibit have not been submitted for city review yet. Once substantial progress has been made for these changes, staff could support the PA 4 changes shown on these exhibits. 2. Provide a geotechnical report addressing subsurface site conditions, geotechnical feasibility, and proposed grading measures required for this project. 3. Revise the preliminary Storm Water Management Plan (SWMP) to include BMP/HMP sizing calculations for the detention vault/modular wetlands systems proposed on the Tentative Parcel Map. Although the preliminary SWMP was revised, it does not include clear sizing calculations for the modular wetlands systems and detention (hydromodification) vault. Refer to redlines and resubmit new copies ofthe preliminary SWMP. ISSUES OF CONCERN Planning: 1. The El Camino Real Corridor Development Standards are intended to serve as specific guidelines to development along the El Camino Real Corridor. Where practical application ofthe standards is not feasible and not in the best interest of good planning practices, deviations to the standards may be approved by the Planning Commission. The proposed project is within the Area 3 segment of the corridor. Standards #s 1, 2, 3, 4, 6, 8, 9, and 11 of the ECRC were applicable to the grading design and street improvements established by Tentative Tract Map CT 13-03. Standard # 5, building height, was modified for Planning Area 7 by the Robertson Ranch Master Plan and allows a maximum building height of 40 feet. Standards # 7 and 10 apply to the proposed multi-family buildings of Planning Area 7. Please provide a written feasibility analysis regarding the proposed building setbacks from the El Camino Real right-of-way. Engineering: 1. Submit a geotechnical report that includes design guidance on the use of onsite permeable pavement as it relates to soils with low infiltration rates. The preliminary SWMP indicates low soil permeability, therefore BMPs do not contemplate soil infiltration. However, exhibits on PA 7 & 8 include an extensive use of permeable pavement. Since these permeable areas affect the runoff rates (and BMP sizes), staff is seeking assurance their use is acceptable through the project. 2. Revise the preliminary SWMP to use the updated 303d listing and update the impaired water bodies this project drains to. Also clarify the land use types and refer to the updated Municipal Permit (Order No. 2013-0001). Address the other redlines on the returned preliminary SWMP. 3. Revise each sheet to show and callout dedication of public water easements to CMWD for onsite potable water systems, versus a general utility and access easement. MP 02-03(G)/SDP 14-08/SUP 14-04/MS 14-07 - ROBERTSON RANCH WEST VILLAGE PA 7&8 November 12, 2014 Page 3 4. Coordinate with the Fire Marshal regarding the proposed preliminary fire hydrant locations and revise the design if necessary. Some of the hydrants appear too close to structures. Refer to redlines. 5. On sheet 9, clarify the height of fence/wall proposed along pool. 6. On sheet 9, provide a typical section where this project abuts PA 4 to demonstrate changes in grade as it relates to the adjacent property. Provide another typical section where the pedestrian ramp runs along Robertson Road. Refer to redlines. 7. On sheet 9, extend the vehicular pop-out paving near building 15 so the vehicle can back out. Refer to redline. 8. On sheet 9, revise the fire hydrant located in a parking stall. Coordinate with the fire marshal on approved locations. 9. On sheet 9, callout a proposed pedestrian access easement over a portion of PA for the benefit of PA 8. This appears necessary as the revised sidewalk design crosses over this adjacent lot. 10. On sheet 11, shift the waterline away from building 19. Refer to redlines. 11. Revise the exhibits to address all other the redlines (see attached). Attached are redlined SWMP and Site Plan/TPM exhibits for the project submittal. Please return this redlines check print with the revised plans and studies to facilitate continued staff review. Landscape: 1. Please review the comments provided by Michael Elliott dated October 13, 2014. Center for Natural Lands Management A non-profit organization for the protection and management of natural resources Citv of CarlsbadzaSS Via Industria, Suite B ^ Temecula, CA 92590-3751 Phone: 760.731.7790 Kin\/AC?niA ' Fax: 760.731.7791 NOV Ub www.cnlm.org Planning Division November 4, 2014 Mr. Peter H. Kim Director of Land Development Toll Brothers, Inc. 725 W. Town and Country Road Suite 200 Orange, CA 92868 S031 Robertson Ranch West Village Preserve (Preserve): Proposed Gradinq within Conservation Easement Dear Mr. Kim: The Center for Natural Lands Management (CNLM) has been made aware that the City of Carlsbad (City), the United States Fish and Wildlife Service (USFWS), and the California Department of Fish and Wildlife (CDFW) have approved certain Robertson Ranch West Village project changes that would impact habitat within a conservation easement (CE) held by CNLM [Conservation Easement Deed (Robertson Ranch Unit 1 - PA 23C)]. The purpose of this letter is twofold. First, CNLM, as CE grantee and Preserve steward, agrees with Toll Brothers about the need to amend the CE to revise the legal description to accommodate certain proposed boundary changes, and will work with you (as outlined in an agreed upon scope of work covering our future joint activities at Roberson Ranch East Village expansion) to effect such change consistent with CNLM's Conservation Easement Amendment Policy and nonprofit organization governance requirements. Second, CNLM staff have reviewed the proposed site grading activities for potential adverse impacts to conservation values (CVs). Recognizing and in part relying upon the fact that City, USFWS, and CDFW, each a third party enforcement beneficiary (TPEBs) ofthe CE, have issued affirming hardline modification consistency determinations,* CNLM will not protest the proposed grading, all subject, of course, to Toll Brothers adherence to City, USFWS, and CDFW requirements, the CE, and the 2007 Management and Funding Agreement (MFA). * November 30, 2011 City (D. Neu) letter to USFWS (J. Stuckrath) and CDFG (L. Libby) entitled "Robertson Ranch Village - Notice of Equivalency Finding;" November 28, 2012 USFWS (K. Goebel) and CDFG (S. Juarez) letter to City (C. Westman) entitled "Request for Concurrence on a Notice of Equivalency Finding fora Hardline Modification ofthe Robertson Ranch West Village, City of Carlsbad, California." Mr. Peter H. Kim November 4, 2014 Page 2 of 2 Should you have any questions regarding this request, please contact Markus Spiegelberg, Regional Preserve Manager, at (619) 295-4953. Thank you, David Brunner Executive Director Center for Natural Lands Management cc: Karen A. Goebel Assistant Field Supervisor U.S. Fish and Wildlife Service 2177 Salk Road, Suite 250 Carlsbad, CA 92008 Stephen M. Juarez Environmental Program Manager South Coast Region California Department of Fish and Wildlife 3883 Ruffin Road San Diego, CA 92123 Christer Westman Senior Planner City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92088 Markus Spiegelberg Regional Preserve Manager, San Diego County Center for Natural Lands Management David A. Monroe General Counsel Center for Natural Lands Management PLANNING SYSTEMS D LAND USE/COASTAL PLANNING LANDSCAPE ARCHITECTURE • LA3900 POLICY AND PROCESSING ENVIRONMENTAL MITIGATION September 30, 2014 Mr. Christer Westman CITY OF CARLSBAD Planning Department 1635 Faraday Ave. Carlsbad, CA 92008 SUBJECT: RESPONSE TO 1 st REVIEW SDP 14-08/MS 14-07 ROBERTSON RANCH WEST VILLAGE PA 7 & I OCT 0 2 2014 Dear Mr. Westman: sms arunssues with the submittal package of T.ii\Titfiii n jMiiipg has commissioned Per your letter dated July 30, 2014, identifying Staff items i the above-referenced application package and plans, Me modifications to the documents and plans as requested. To this end, attached with this cover letter please find the following: • Five (5) copies of the revised Site Development Plan set (architecture, engineering and landscape architecture) Cross-Section of project at ECR frontage Two (2) copies of the revised Preliminary SWMP Two (2) copies ofthe Acoustical Analysis Color and Materials Boards Application for MPA and SUP (with check for fees) Redlined plans (retum) Below are responses and methods that we are addressing the City comments, in the order of comments listed in the January 31 letter. LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION Planning: /. Although stated as an application for 364 apartments in total, the plans indicate that 365 apartments are proposed. Please adjust the plans accordingly to reduce the unit count to 364. Response: The dwelling unit count on the project design has been reduced to a total of 364 units. This information is reflected in the plans and on the cover sheet. 2. The Master Plan requires a minimum density of 20 du/ac for PA 7 and PA8 combined. Please indicate the gross and net acreage for the two Planning Areas and compliance with the minimum density standard. Response: The gross and net acreage is indicated in the Cover sheet and is in compliance with the fninimum density standard. Density calculations are shown on Engineering Sheet 1. 1 1530 FARADAYAVENUE • SUITE IOO • CARLSBAD, CA92008 • (760) 931-0780 • FAX (760) 931-5744 • info@planningsystems.net 3. On the Dahlin group Cover Sheet for PA 7/PA8 Apartments, please add "# units "for PA 7 and "# units "for PA 8. Response: The number of units has been added to the Architecture cover sheet. It is also shown on the Engineering cover sheet. 4. On the Dahlin group Sheet AO.O for PA 7/PA8 Apartments, please revise the PARKING SUMMARY to correctly refer to # apartments in Planning Area 7, # apartments in Planning Area 8, and 101 senior apartments in Planning Area 8. Response: The parking summary is revised to show the number of apartments of each planning area. 5. The Dahlin group cover sheet for the senior affordable apartments should be revised to remove reference to PA 7. Response: The reference to PA 7 on the senior apartments has been removed. 6. The project as submitted includes a change in the number of estimated residential units in PA 7 from 116 to 96 and in PAS from 248 to 268. Reductions and/or increases in the numbers of residential units allocated to any of the master plan planning areas of up to 10% require a Minor Master Plan Amendment approved by the Planning Commission, Changes greater than 10% require a Major Amendment approval by the City Council. As submitted, there is a 17.24% residential unit reduction proposed in Planning Area 7 which requires the submittal of a Major Master Plan Amendment. Response: A minor master plan amendment application and check for fee is provided with this resubmittal package, as requested. 7. Provide an exhibit illustrating the location of required resident parking for each building. Response: Exhibit AO. 1 Resident parking analysis Exhibit is provided with this submittal. Done. See graphic added to Sht. AO.O. 8. Please provide width and depth dimensions of balconies, decks, and patios on the plans. Response: The width and depth dimension of balconies, decks, and patios has been added to the plan set. Please see dimensions Sheet Al.l & A 1.2 9. Submit a supplemental acoustical analysis demonstrating compliance with the City of Carlsbad's Noise Guidelines Manual for the buildings in PA 7. Response: The acoustical analysis is provided with this resubmittal 10. Please provide a table quantifying all of the'various common recreation areas throughout PA 7 andPA8. Response: This information is shown on the Landscape Sheets. 11. A Special Use Permit (El Camino Real Corridor) is required for the development ofPA7. Response: A special use permit application, with fee, is provided with this resubmittal package. PLANNING SYSTEMS c 12. Coordinate the civil, architectural and landscape plans for drive aisles, parking, carports, pedestrian walkways, etc. Response: The base plan for civil, architectural and landscape plans has been coordinated. Please see Sheet AO.O. Engineering: 1. Modify the title sheet to identify the property owner and the developer information. The data on sheet 1 is outdated. Refer to redlines. Response: Toll Bros LLC has been added as owner and Shapell as applicant on Engineering Sheet no.l. 2. Since this project proposed 2 lots that include common-use facilities (drive aisles, drainage, utilities, etc.), this project may require a residential PUD application. Please confirm with planning and address. Response: A residential PUD is not required. This has been confirmed by the Planning Division. A note has been added to Engineering Sheet no. 1 for a "covenant of easement" to be recorded for reciprocal access, parking, etc. 5. The layout/configuration of PA 4 (recreation lot) does not match CT 13-03. How will the lot lines for PA4 be adjusted? Will they be changed: 1) via the final map for CT 13-03 (not yet recorded), 2) included within MS 14-07, or 3) by separate lot line adjustment? Revise the exhibits to clarify what applications are responsible to document PA4 changes. Response: Our plan is to revise the final map for CT 13-03 to show the updated, proper lot configuration for PA 4. 4. Provide a geotechnical report addressing subsurface site conditions, geotechnical feasibility, and proposed grading measures required for this projecL Response: The existing Soils report by Geosoils is presently being updated. A copy will be provided to the City as soon as it is available. 5. Revise the preliminary Storm Water Management Plan (SWMP) to include BMP/HMP sizing calculations for the detention vault/modular wetlands systems proposed on the Tentative Parcel Map. Response: The SWMP has been revised and is provided in this resubmittal package. ISSUES OF CONCERN Planning: 1. Planning Commissioners have through recent action indicated that a reduction in single car garage widths (from 12 feet to 10 feet in width) is not acceptable. The project should be revised to accommodate the minimum 12 foot standard width. As a note, the project description states that the reduced width is desirable in order to provide each unit within the building with a garage space, however, each building has 12 apartments and only 8 garage spaces. PLANNING SYSTEMS Response: The revised design has increased the garage widths to 11' minimum (five garages) and 12' minimum (3 garages) in each building. Physical analysis has shown that a fiill-size SUV (Chevy Tahoe) can easily open both doors within an 1 I'O" garage. We request a standards modification to allow garages to be 1 I'O" in width. These garages all exceed the minimum depth requirement (22' to 25') and therefore will have available storage space. As designed, only 8 of each 12 units have a private garage space. The remaining four units will have carport covered parking. 2. As a coordination effort with the association of required resident parking for each building, reconsider the use of either the fioor plan or reverse fioor plan that places the two entries into each building at the closest point to the designated resident parking. Response: We have made every effort to design the pedestrian circulation to achieve an efficient path of travel. 3. Re-assess the onsite pedestrian circulation paths to achieve the closest to a natural path of travel between apartment buildings and between apartment buildings and the recreation center. Response: The pedestrian walkways have been revised and also meet accessible path of travel requirements, as requested. 4. A pedestrian connection from PA 8 to Robertson Road should be provided with the intent of creating a shorter natural path of access from PA 8 to the PA 4 West Village recreation facility. Such a connection will also serve as a closer, more direct access way for residents ofPA 7 to the recreation center. Response: A sloped walkway and a traffic calming bulb with crosswalk has been added adjacent to and on Robertson Road. 5. Buildings visible from El Camino Real must feature enhanced elevations. Response: The buildings visible from El Camino Real include enhanced architecture. 6. Measures should be taken to reduce the top-of-slope visibility of the buildings along El Camino Real. Pursuant to the Hillside Ordinance (Section 21.95.140(I)(1), a top-of-slope setback for a 30 foot tall building is 21 feet. Tree planting along El Camino Real slope will contribute to screening the visibility of the buildings from El Camino Real. Response: Hillside Ordinance Section 21.95.160(A) states that; "the decision-making body may approve a modification to the development and design standards of21.95.140 if it decides that the proposed project complies with the purpose and intent of 21.95.010, and (2) the proposed modification will result in the development of manufactured slopes which are more aesthetically pleasing and natural appearing than would a strict adherence to the requirements of21.95.140." The proposed project is designed with a building setback in excess of 100-feet from El Camino Real. This setback is at least twice the setback distance typically required for residential development on a prime arterial. Please see the attached cross sections comparison of the slope and buildings adjacent to El Camino Real showing a typical 50-ft setback and 21-foot top of slope setback, vs the proposed design. It is our opinion that an additional increased setback of 10 or so more feet from the top of slope at this distance will not improve the visual impact significantly. The altemative solutions of creating a top of slope retaining wall, or lowering the site pad overall will both, in our opinion, create greater negative visual impacts. We believe that the proposed design complies with the two findings for modification in 21.95 referenced above. PLANNING SYSTEMS Engineering: 1. ^Please consider creating separate exhibits/title sheets for the PA 7 Site Development Plan and PA 8 Site development/Tentative Parcel Map. It may be helpful to clarify how PA 7 is outside the subdivision boundary for MS 14-07, so it is not impacted by potential subdivision obligations of a parcel map. Having separate SDP applications for PA 7 and 8 may also offer other flexibilities when development permits are sought for either planning area. Response: Clarification has been added on Engineering Sheet 1 that PA 8 will be the subject of a tentative parcel map to create two lots. The Site Development plan application covers both PA 7 and PA 8. 2. In the upper ri^ht hand corner of the exhibits, list the application numbers for this project. Refer to redlines. Response: The application numbers have been added to the upper right comer of the Sheets. 3. Revise the legend to include items found on the other exhibits (potable water service, sewer service, recycled water service, modular wetlands, bioretention basins, underground detention vaults, parking light fixtures, etc.). Refer to redlines. Response: The legend has been revised, as requested. 4. Revise the key map so the sheet index is provided on sheet 3 (better scale). Refer to redlines. Response: The key map has been revised. 5. Since this is a minor subdivision, revise the exhibits to call the proposed 'parcels' versus proposed 'lots' (typical). Refer to redlines. Response: The requested wording change has been done. 6. Revise the project so the proposed onsite sewer system is private, versus public (typical). Response: Private sewer labels have been added, as requested. 7. Revise the exhibits to delete the proposed onsite public recycled water system throughout PA 7 & PA8. Revise the exhibits to provide recycled irrigation service/meters along the frontages to Gage Drive and Robertson Road. These will be the preliminary points of connection where (in final design) irrigation systems can be extended onsite to provide the onsite irrigation needs of the project. Response: The recycled water mains have been removed and the irrigation services at the street are now shown. 8. Clarify why PA 7 does not use pervious pavement, while PA 8 shows extensive use of it Response: Pervious pavement has been added to PA 8. 9. The preliminary SWMP indicates low soil permeability; therefore BMPs do not contemplate soil infiltration. However, exhibits on PA 7 include an extensive use of permeable pavement. Submit a geotechnical report that includes design guidance on the use of onsite permeable pavcmcntr PLANNING SYSTEMS Response: Our plan is to provide at final design the addition of a perforated pipe in the subgrade of the pervious pavers (because ofthe soil type "D"). 10. Revise the preliminary SWMP to include the minimum sizes of bioretention required/provided. Provide this information on the bmp exhibits and demonstrate how the water quality features will treat the runoff from this project Refer to redlines. - Response: The SWMP has been revised and also a summary table has been added to the exhibits in the SWMP. 11. Revise the preliminary SWMP to address what BMP's will treat certain areas not yet identified. Refer to redlines Response: At the time that the site plan is deemed acceptable to City Staff, we will provide a more detailed analysis of proposed BMP's prepared using a continuous rainfall simulation computer model. This will provide information for the detailed design of the modular wetlands and hydromodification storage capacity. 12. Revise the exhibits to include an intersection choker/mid-block crossing on Robertson Road. This will serve as both traffic calming and an improved pedestrian linkage from PA 7 to PA 4 (recreation lot). Since this affects backbone improvements per CT 13-03, the city will coordinate with the developer of CT 13-03. Refer to redlines on sheet 3. Response: Chokers have been added on the site plan. We will be adding the design to Dwg.480-3. 13. Revise each sheet to show short legal descriptions and street names for adjacent properties (typical). Refer to redlines. Response: Information for the surrounding lots and streets has been added, as requested. 14. Revise each sheet to show and callout 20-ft. wide water easements to CMWD for onsite potable water systems. Response: A general utility and access easement has been added to cover the drives. 75. Revise the exhibits to callout unique building numbers for each separate structure (typical). This information is on the exhibits for PA 7, but not PA 8. Response: The building numbers have been added, as requested. 16. Revise all exhibits to list the pad elevation for each proposed building (typical). Response: Pad elevations have been added (subject to change when a soils report is available). 17. Revise the exhibits to callout the slope along proposed onsite sidewalks/walkways (typical) to demonstrate how designs satisfy current accessibility requirements. Response: Slope grades have been added to the sidewalks. 18. Coordinate with the Fire Marshal regarding the proposed preliminary fire hydrant locations and revise the design if necessary. PLANNING SYSTEMS 5 Response: We met with the fire department regarding the fire hydrant locations. The proposed locations are consistent with the results of our meeting. 19. Provide a typical section addressing the depressed bioretention areas in the parking lots. Clarify whether 0 " curbs will be used with wheel stops or standard curbs with drainage openings. Will any fencing be needed to discourage pedestrians from crossing over depressed areas or is the depression too minor to warrant this? Response: A typical section showing "O" curbs with the wheel stops has been added to the Engineering Sheets. 20. Add callouts to exhibits proposing underground detention/modular wetland systems. Add preliminary volumes of these facilities as identified in the preliminary SWMP. Response: The modular wetlands have been added to the legend. We also added the dimensions for the modular wetlands and the volumes of hydromodification underground vaults. 21. The legend symbol for pervious pavement seem to match the enhanced paving symbol on the traffic circles per CT 13-03. Revise the symbols to address this discrepancy. Refer to redlines (sheet 8). Response: The symbols have been changed, as requested. 22. Revise the exhibits to include references to adjacent sheets as you navigate through the project (typical). Refer to redlines. Response: The adjacent sheet information has been added. 23. Revise the exhibits/legend to callout symbols that may be covered parking areas (typical). Refer to redlines. Response: The legend has been modified to call out the covered carports. 24. Revise the exhibits to callout if perimeter site walls are proposed around each planning area (typical). If so, callout type and height of the wall. Response: The sound wall on PA 7 has been added. There will not be any other perimeter fence added with this project. 25. On sheet 2, add notes to clarify that frontage improvements are being provided per DWG 480-3 (CT 13-03). Response: Notes have been added regarding improvement by Dwg. 480-3. 26. On sheet 3, revise the composite map to include the sheet index information. Revise this exhibit to show utility layout information (potable water, private seiver, storm drain, etc.). Callout existing onsite and adjacent short legal descriptions from CT 13-03 and the proposed parcels per this application. Show/callout the fire hydrants surrounding the project to be built per CT 13-03. Provide a key map legend. Add street names. Refer to redlines. Response: Utilities layout and surrounding information has been added on Engineering Sheet 3. PLANNING SYSTEMS • 27. On sheet 3, can the proposed emergency access turn-around area be constructed with pervious pavement or pervious payers to limit urban runoff? Coordinate this concept with the Fire Marshal prior to making change. Will this area be hatched with striping or will bollards be necessary to discourage resident parking in this area? Response: The pervious pavers that determined to be acceptable to the Fire Department have been added. Removable bollards have not been included in the design at this time. 28. On sheet 4-6 and sheet 8, callout the 'proposed' parcel line. Add callouts for Parcel A and Parcel B along with the proposed acreages for each. Refer to redlines. Response: The proposed parcel lines have been called out on the plan. The areas of each parcel are shown on the plans (Sheet no. 1) 29. On sheet 5, coordinate the utility improvements on Gage Drive per CT 13-03 so they match the proposed connections per these exhibits. Refer to redlines. Response: A note has been added to call out the existing utilities and the proposed locations (the revised locations will be made to Dwg. No. 480-3) 30. On sheet 5, callout the width and type of easement encumbering the property along Gage Drive. Refer to redlines. Response: The note has been added on Sheet 5, as requested. 31. On sheets, include pedestrian ramps where the sidewalk (per CT 13-03) intersects the proposed driveway. Orient the pedestrian ramps in the flow ofpedestrian movement versus diagonal pedestrian ramps. Show modifications to the sidewalk connections, if any. Refer to redlines. Response: The pedestrian ramps have been added. 32. On sheet 5, show/callout proposed topographic information between Parcel A and Parcel B. Refer tb redlines. Response: The additional topographic information has been added, as requested. 33. On sheet 6, move the waterline away from proposed multi-story structures. Since the onsite public recycled water is not required, this will allow for the waterline to be shifted. Refer to redlines. Response: The water main has been shifted, as requested. 34. On sheet 8, consider relocating the trash enclosure near the gate for PA 8. The current location appears to cause gate issues or delays as residents enter the project. Refer to redlines. Response: The trash enclosure has been relocated. 35. On sheet 9, callout the width and type of easement encumbering the property along Robertson Road. Refer to redlines. Response: The easement has been called out as indicated in the redlines. PLANNING SYSTEMS • 36. On sheet 9, clarify if a project fence/wall is proposed along the perimeter of PA 8. Provide a typical section where this project abuts PA 4 to demonstrate changes in grade as it relates to the adjacent property. Response: The grading along PA 4 has been added to the plan as requested. 37. On sheet 9, callout the proposed acreage for PA 4, as it is modified from CT 13-03. Coordinate with Planning on approval for any Master Plan changes. Response: It is our plan to change the final map for CT-13-03 to reflect the lot configuration for PA 4. 38. On sheet 10, clarify whether the second entrance off Robertson Road will include gates. Response: The emergency access gate has been added to the plan on Sheet 10. 39. On sheet 10, revise the exhibit to clarify how bioretention basin 1 will drain if clogged. Provide finish surface elevations to show emergency overflow is contained onsite and does not drain down the slope to El Camino Real. Response: A brow ditch between the basin and the top of slope has been added to resolve this emergency overflow issue. 40. On sheet 10, the grading for PA 7 encroaches approximately 7-feet into the pedestrian access easement and sidewalk per CT 13-03. The exhibits show reconstructing the sidewalk. Revise the grading to avoid grading within the access easement and confiict with the meandering sidewalk per CT 13-03. Maintain the large landscape buffer area created as part of the master plan. Response: A note indicating that the sidewalk will be revised on DWG. No. 480-3 has been added. 41. On sheet 10, add elevation numbers to the proposed topography lines along Robertson Road. Refer to redlines. Response: Elevation numbers have been added to the contours. 42. On sheet 10 and 11, correct the storm drain symbol to match the legend. Response: The storm drain symbol has been corrected. 43. On sheet 10 and 11, the bioretention basin numbers for PA 7 are already used on earlier sheets for PA 8. Since this is a comprehensive site plan, use unique basin numbering throughout the exhibits. Refer to redlines. Response: The storm drain basin numbering has been changed, as requested. 44. On sheet 10 and 11, include pedestrian ramps where the sidewalk (per CT 13-03) intersects-the proposed driveway. Orient the pedestrian ramps in the fiow ofpedestrian movement versus diagonal pedestrian ramps. Show modifications to the sidewalk connections, if any. Refer to redlines. Response: The pedestrian ramps have been modified to be oriented to the flow of foot fraffic. PLANNING SYSTEMS 45. On sheets 10 and 11, clarify whether the courtyard pavement between buildings are proposed with pervious pavement. The symbols used seem to match that on the legend. Refer to redlines. Response: The courtyard PCC material has been changed to pavement. 46. On sheet 11, callout the linear bioretention swale along Robertson Road per D WG 480-3. Response: The label calling out the linear bioretention swale has been added, as requested. 47. On sheet 11, clarify how maintenance access will be provided to the proposed sewer manholes at the southeast comer of PA 7. Will maintenance vehicles be able to drive over the below ground vaults? Response: Since the sewer and the storm drain are private, we anticipate that the maintenance will be completed with smaller machinery. At the time that we have the final design of the modular wetlands and vaults, we will have the ability to provide a path of travel and surface for maintenance. 48. On sheet 12, the exhibit shows conflicts with fire engine access as it enters and exits the project entry just west of Gage Drive and West Ranch Street. The turning templates show the trucks driving against the fiow of traffic and driving over raised medians, which will not be permitted. Coordinate with the Fire Marshal to provide emergency ingress/egress to the projecL Revise the design to address this discrepancy. Response: The driveway geometry that is proposed will not allow the fire trucks to make their tuming movements without transitioning into the opposite lane. If the Fire Department objects to this design, some design modification will be necessary in this location. 49. On sheet 13, compile all three paths into one comprehensive exhibit (like sheet 12 does). Showing multiple paths are confusing for a discretionary application. Response: A composite ofthe fire truck tuming radius exhibit has been included in the Engineering Plans. 50. Revise the exhibits to address all other the redlines (see attached). Response: Redlines are attached. Landscaping 1. Please indicate to see Drawing 480-3L for all slope landscaping. Response: This reference note has been added, as requested. 2. Please address landscaping of all street parkways or provide a copy ofplans that address these areas for cross checking. Response: The adjacent slopes and Parkway Plans are not a part of this application, and have been prepared by The Lightfoot Planning Group. This information is indicated on the Landscape Plan set. PLANNING SYSTEMS 3. Please coordinate landscape plans with civil grading plans. Check all areas. Plans shall be prepared at the same size and scale as the site plan or grading plan. Plans shall be drawn on a 50% screen of the civil engineering grading plans. Submit a copy of the most current civil grading plans with the next submittal for cross checking. Response: The plan sizes and scales have been revised to match the civil drawings. The civil grading is screened back. 4. Plans are too conceptual to provide an appropriate review. One symbol is used for many trees, shrubs and ground covers which may be very different in size and character. Please provide a separate symbol for each type of tree, shrub (i.e. large evergreen tree/shrub, medium size tree/shrub, small fiowering accent shrub, etc.) and ground covers. Final comments are reserved pending receipt of more complete plans. Response: The Planting Plans have been revised to include a more specific Plant List. 5. Please coordinate the limit of work line with work shown. Response: This coordination has been made in the revised plans. 6. Please provide wall vines (i.e. Fig Vine, Boston Ivy, etc.) or shrub of appropriate height along the retaining walls to soften and enhance the elevations. Check all sheets. Response The Planting Plans have been revised to include a more specific Plant List. 7. Please provide typical details and indicate the materials and finishes of the retaining walls. Please also provide a cap with cantilever to provide a reveal. Response: A new Wall & Fence Exhibit set is provided with the revised plans. 8. Please provide conceptual details of the entry monument walls. Response: Please see the new Wall & Fence Exhibits. 9. Please provide a symbol for the accent palms and show these palms on the plans. Response: Please see the revised Planting Plans with a more specific Plant List. 10. Please show the Date Palm groves. Response: The Planting Plans have been revised to show the Date Palm groves. 11. Please show the Date Palms on the plans. Response: The Planting Plans have been revised to include a more specific Plant List, including the Date Palms. 12. Please show the vehicular gates with pilasters arid provide typical details and elevations showing materials and finishes. Response: Please see the new Wall & Fence Exhibits. PLANNING SYSTEMS 5 • 13. Please clarify what enhanced "carpet"paving is. Response: The term "Carpet" in this context refers to an area of enhanced paving to emulate an area carpet in a great room. 14. Please show and label all property lines, right-of-ways and existing and proposed easements on the plans. Insure no trees are located within public easements. Response: This review has been conducted and information shown. 75. The plan shall demonstrate that plants, when installed and at maturity, will be positioned to avoid obstructing motorists' views of pedestrian crossings, driveways, roadways and other vehicular travel ways. On collector streets and larger, landscape elements over 30 inches in height (including planting measured at maturity) as measured from adjacent street grade are not permitted at street corners within a triangular zone drawn from two points, 25 feet outward from the beginning of curves. At medium to high use driveways, the 30 inch height limitation applies at driveways 25 feet from the edge of the apron outward along the curb, then 45 degrees in toward the property. Landscape features (shrubs, trees, fencing, etc.) shall be selected to ensure that no visual impairments or obstructions are located within the sight lines. Please show and label all vehicular sight lines on the plans and insure these requirements are met. Response: This requested information has been provided. Please see also the Line-of-Sight note. 16. Please indicate the spacing of all shrubs. Response: Please see the revised Planting Plans with a more specific Plant List with spacing of shrubs addressed. 7 7. Please indicate the proposed plant sizes either by number or percentage of the total quantity. 50% of the shrubs (except on slopes 3:1 or steeper) shall be a minimum 5 gallon size. Response: Please see the revised Planting Plans with a more specific Plant List. The size and quantity information requested has been provided. 18. Invasive species shall not be added to a landscape area. Phoenix canariensis and Washingtonia robusta are listed as invasive species. Please provide substitutes. Response: Please see the revised Planting Plans with a more specific Plant List. The referenced tree species have been removed and substitutes included. 19. Please provide a Maintenance Responsibility ExhibiL The Maintenance Responsibility Exhibit shall be prepared at a scale and size (preferably one sheet) that provides an overall view of the project and shall clearly identify the various areas of landscape maintenance responsibilities (private, common area/homeowners association (HOA), City, etc.). Clarify who is responsible for the maintenance of all landscape areas located on the property including areas outside the limit of work line (slopes and parkways). "Property Management Company " is not definitive. Clarify who is responsible (Le. the property owner). Response: Please refer to the new "Maintenance Responsibility Exhibif in the Landscape Plan set. PLANNING SYSTEMS 20. Please note that an encroachment permit is required for the installation of any enhanced paving located within a public utility easement Please coordinate with the civil to show all enhanced paving (where located within an easement) on the grading plans and indicate that an encroachment permit is required. Response: Enhanced paving has been removed from the ROW as requested. This has been coordinated with the Engineering Plans. 21. The Landscape Manual indicates that landscape plans are to feature ground cover, shrubs, and trees to screen elements of unsightliness and screen/soften new improvements. The Landscape Manual also indicates that landscaping shall be used to accentuate and enhance architecture. Please provide appropriate landscaping along all building elevations to both soften and enhance the architecture. Response: This comment has been addressed through added landscape adjacent to buildings. 22. Woody shmbs shall be planted over herbaceous ground cover areas to cover 60% of the ground cover area (at mature size). Insure this requirement is met Response: Please see the revised Planting Plans which address this information in the Plant List. 23. Evergreen plants shall be used td screen unsightly elements and shall be spaced to provide 100%) screening within two (2) years of installation. Please insure this requirement is met Response: Please see the revised Planting Plans which address this information in the Plant List. 24. Platanus acerifolia is having severe problems with anthracnose in the Carlsbad area. Although a resistant variety ('Bloodgood') is specified, it is still susceptible. Please provide an appropriate substitute. Response: This plant has been removed and substituted, as requested. 25. All utilities are to be screened. Landscape construction drawings will be required to show and label all utilitids and provide appropriate screening. Please also locate all light poles on the landscape plans and insure that there are no conflicts with trees. Response: Please see the Utility Screening Note. 26. Turfgrass shall not be allowed where any dimension of the landscaped area is less than six (6) feet wide. Please address. Response: Turfgrass has been eliminated in the areas referenced. 27. Provide a minimum of one street tree for every 40' of street frontage. Trees may be planted on center or grouped. Trees shall be selected from the approved tree replacement list identified in Chapter 6 of the Carlsbad Community Forest Management Plan, unless approved otherwise. Response: The PLanting Plans have been revised to comply with this requirement. PLANNING SYSTEMS 5 • 28. Trees shall be provided at the minimum rate of one per every four parking stalls. Trees pertaining to this requirement shall be located within the parking area, exclusive of parking lot setbacks. The trees shall be located in close proximity to the spaces they are to shade. Please address. Check all areas. Response: Please see the revised Planting Plans which addresses this requirement. 29. A perimeter landscape border of at least eight (8) feet in width (exclusive of curbs) shall be provided around each outdoor/at grade parking area unless the Zoning Ordinance or other governing document specifically provides otherwise. The perimeter landscaped border (between property lines and parking areas) may include any landscaped yard, setback, or landscaped area otherwise required within the property and shall be continuous except for required access points. A perimeter landscape border is not required between a parking lot and building. The planting within the perimeter landscape border is not counted towards the 3% landscape requirement for parking lots (see comment 31 below). Response: The Planting Plans have been revised to meet this requirement. 30. Parking areas shall be screened from adjacent property or streets through the use ofplanting or any combination of planting, mounding, and decorative walls. Screening elements shall have a total height of at least three (3) feeL Response: Please see the added Parking Lot Screening note. 31. A minimum of 3% of the parking area shall be landscaped. The "parking area " includes all parking spaces and drive aisles. The plantings shall be contained in planting areas with a minimum dimension of 4' and bounded by a concrete or masonry curb of a minimum of 6" in heighL The plantings shall be located throughout the off-street parking areas in order to obtain the maximum amount of dispersion. Please address and provide a calculation proving the percentage of landscape area provided in the parking area. Response: Please see the "Parking Lot Landscaping Area" calculation included in the plans. 32. Long rows of parking should be broken up with landscaped islands. Landscaped islands should be provided at intervals of one island for approximately every 12 to 15 parking spaces. Please address. Response: The site plan has been revised to address the landscape islands requirements. 55. Please provide/address the following: a. Indicate the existing and/or future recycled water systems. Response: Recycled water will be existing at the site when this project commences landscape installation. b. Provide a colored or hatched plan clearly showing where recycled water, graywater and potable water are proposed to be used for irrigation. This plan will be forwarded to the Carlsbad Municipal Water District for review. Any comments will be returned to the applicant PLANNING SYSTEMS • Response: Recycled water is proposed for all landscape areas except the Pool enclosure area as required by the Health Department. c. Irrigation systems for all projects, except for service to a single-family residence or front yard irrigation on individually metered condos, shall be designed to use non-potable, treated recycled water, unless an exemption is approved by the City Utilities Department Response: This comment is noted by the Applicant. d. Separate water service for landscaping (including, but not limited to connections, water meters, and backfiow preventers) shall be providedfor all commercial/industrial projects, golf courses, parks, and residential common areas in projects over four (4) dwelling units. Response: This comment is noted by the Applicant. 34. Include a statement on the plans signed under penalty ofperjury by the person who prepared the plan that provides: "1 am familiar with the requirements for landscape and irrigation plans contained in the city of Carlsbad's landscape manual and water efficient landscape regulations. I have prepared this plan in compliance with those regulations and the landscape manual and agree to comply with all requirements when submitting construction documents. I certify that the plan implements those regulations to provide efficient use of water. " Response: This certification has been added to the plan set. 55. Please revise the Eto to 47.0. Response: The Eto has been revised to 47.0. 36. Please revise plant factors and irrigation efficiencies to match those provided on sheet 4 of Appendix E in the Landscape Manual. Response: The plant factors and irrigation efficiencies have been revised as requested. 57. The surface area of a water feature, including swimming pools, shall be included in a high water use hydrozone. Please include the pool and any other water features in the calculations. Response: The information indicated has been included in the revised calculations. 38. The plan shall provide that only low volume or subsurface irrigation shall be used to irrigate any vegetation within twenty-four inches of an impermeable surface unless the adjacent impermeable surfaces are designed and constructed to cause water to drain entirely into a landscaped area. Response: The plans have been revised to incorporate this requirement. 39. Please add the following notes to the plans and insure all requirements are met (show how all requirements are met): Slopes 6:1 or steeper requiring erosion control measures as specified herein shall be treated with one or more of the following planting standards: a. Standard #7 - Cover Crop/Reinforced Straw Matting: Cover crop shall be a seed mix typically made up of quick germi latins and fast PLANNING SYSTEMS 5 • covering grasses, clovers, and/or wild fiowers. Submit the specific seed mix for City approval prior to application. The cover crop shall be applied at a rate and manner sufficient to provide 90%) coverage within thirty (30) days. Type of reinforced straw matting shall be as approved by the city and staked to the slope as recommended by the manufacturer. Reinforced straw matting shall be required when planting occurs between August 15 and April 15. The cover crop and/or reinforced straw mat shall be used the remainder of the year. b. Standard #2 - Ground Cover One hundred (100%) percent of the area shall be planted with a ground cover known to have excellent soil binding characteristics (planted from a minimum size of flatted material and spaced to provide full coverage within one year). c. Standard #5 - Low Shrubs Low spreading woody shrubs (planted from a minimum of 2-3/4 inch liners) shall cover a,minimum of seventy (70%) percent of the slope face (at mature size). d. Standard #4 - Trees and/or Large Shmbs Trees and/or large shrubs shall be (plantedfrom a minimum of 1 gallon containers) at a minimum rate of one (1) per two hundred (200) square feet. Slopes - 6:1 or steeper and: a. 3' or less in vertical height and are adjacent to public walks or streets require at minimum Standard #7. ' b. 3' to 8' in vertical height require Standards #7 (erosion control matting shall be installed in lieu of a cover crop), #2 and #5. c. In excess of 8' in vertical height require Standards #7 (erosion control matting shall be installed in lieu of a cover crop), #2, #5, and #4. Areas graded flatter than 6:1 require Standard #7 (cover crop) with temporary irrigation when they have one or more of the following conditions: a. Sheet graded pads not scheduled for improvements within 6 months of completion of rough grading. b. A potential erosion problem as determined by the City. c. Identified by the City as highly visible areas to the public or have special conditions that warrant immediate treatment Response: Notes reflecting the information requested have been added to the plans. 40. Per the Robertson Ranch West Village Specific Plan, page III-30, e: "Common recreation areas shall be provided within Planning Area 7. Please provide required common recreation areas and provide the conceptual design on the plans. Response: Planning Area 7 and Planning Area 8 constitute a single, joint project. The common recreation facilities are provided within the boundary of PA 8, however this recreation facilities includes facilities required for development of PA 7. It is our opinion that the fact that adequate recreation facilities are provided in a directly-adjacent site, is consistent with the Master Plan requirement. 41. Per the Robertson Ranch West Village Specific Plan, page 777-52.- "A minimum of 100 square feet of Community Recreation Facilities per dwelling unit shall be provided on-site within Planning Area 7 (for apartments). Recreation area for condominiums shall be provided at 150 square feet per unit Community recreational space shall be provided as both passive an4 active recreational PLANNING SYSTEMS facilities for a variety of age groups. Community recreational space shall be centrally located in relationship to all project units. " Please address this requirement. Response: Planning Areas 7 & 8 are being developed together. The recreation area is located on PA 8, immediately across Robertson Road from PA 7. Sufficient area to satisfy the recreation area requirement is provided. 42. Per the Robertson Ranch West Village Specific Plan, page 777-5 5.' "Bicycle storage lockers shall be provided for residential units." Please address. Response: Bicycle storage lockers will be provided at various locations throughout the project. These locations will be provided at final design. 43. Per the Robertson Ranch West Village Specific Plan, page III-40: "A minimum of 100 square feet of Community Recreation Facilities per dwelling unit shall be provided on-site within Planning Area 8 (for apartments). A mimmum ofl50 square feet of Recreation Facilities shall be provided for condominium projects. " Please provide a calculation that shows this requirement has been met Response: Planning Areas 7 & 8 are being developed together. The recreation requirement calculation is shown on the Architecture Plan set cover sheet. 44. Per the Robertson Ranch West Village Specific Plan, page III-41: "Each unit shall include a patio or balcony, subject to the following minimum area requirements - Patio: 100 square feet (minimum dimension of 8 feet); Balcony: 60 square feet (minimum dimension of 6 feet). " Please address. Response: The patio or balcony minimum area has been achieved. Please reference Architectural Sheets A1.1-A1.5. 45. Per the Robertson Ranch West Village Specific Plan, page III-43: "Bicycle storage lockers shall be provided for residential units. " Please address. Response: Bicycle storage lockers will be provided at various locations throughout the project. These locations will be provided at final design. 46. Per the Robertson Ranch West Village Specific Plan, page III-126: "The intent of the landscape design theme is to incorporate a mountain resort character into the various landscaping components throughout the community... "Please explain how this design concept is provided. Response: Revised Planting Plan incorporates the approved Plant Palette and coordination with Lightfoot Planning Group planting scheme for adjacent slopes and Parkways. 47. Please provide more detail of the proposed elements and design at the north end of West Ranch Street. This will become an important focal point for people entering the site. The design needs to refiect this importance. Per the Robertson Ranch West Village Specific Plan, page 111-134: "Stands of trees related to the West Village overall landscape theme will be planted at this location, with shrub plantings used as the under story and the foreground color provided by flowering shrubs and perennials. Specimen size trees of 36-inch box or larger will be used in the core area... " See Figure No 777-55 on page 777-757 of the Specific Plan. Please fully address. Response: Please see the revised Planting Plans for the additional detail, consistent with the Master Plan exhibits. PLANNING SYSTEMS 5 • 48. Per the Robertson Ranch West Village Specific Plan, page 111-183 andfigure 111-57: A Community Theme Wall is to be provided along the south side of PA 7. Please address by showing the wall along with conceptual details and elevations providing materials andfinishes. Response: The sound wall has been added along the westem section of the project adjacent to El Camino Real per the Acoustical Report. Please see the Wall & Fence Exhibit for the elevations and details. 49. RETURN REDLINES and provide 2 copies of all plans (concept water conservation, and colored water use plan) for the next submittal. Please provide a written response to all comments clearly indicating where and how each comment was addressed. Response: Redlined plans are being retumed. We are hopeful that this resubmittal will provide the necessary information and address the necessary issues in order to proceed with CEQA review and public hearings. Sincerely, \. Klukas Director ofPlanning Matt Fausett Doug Griffith PLANNING SYSTEMS 5 • 4*CAi<LSBAD f'LE COPY Community & Economic Development www.carlsbadca.gov July 30, 2014 Paul Klukas Planning Systems Suite 100 1530 Faraday Avenue Carlsbad, CA 92008 SUBJECT: 1st REVIEW FOR SDP 14-08/MS 14-07 - ROBERTSON RANCH WEST VILLAGE Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Division has reviewed your Site Development Plan and Minor Subdivision, application no. SDP 14-08/MS 14-07, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. The second list is project issues of concern to staff. In order to expedite the processing of your application, the "incomplete" items and your response to the project issues of concern to Staff must be submitted directly to your staff planner; therefore, please contact your staff planner directly to schedule a re-submittal appointment. As part of your re-submittal package, please prepare and include with your re-submittal: (1) a copy of these lists, (2) a detailed letter summarizing how all identified incomplete items and/or project issues have been addressed; and (3) five (5) sets of revised plans. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted, the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, June 30, 2014, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. In order to expedite the processing of your application, you are strongly encouraged to contact your Staff Planner, Christer Westman, at (760) 602-4614, to discuss or to schedule a meeting to discuss your application and to completely understand this letter. You may also contact each commenting department individually as follows: • Land Development Engineering Division: Jeremy Riddle, Associate Engineer, at (760) 602-2737 • Fire Department: Gregory Ryan, Fire Inspections, at (760) 602-4661 Sincerely, CHRIS DeCERBO Principal Planner CD:CW:fn c: Shapell SoCal Rental Properties, LLC, Suite 700, 8383 Wilshire Boulevard, Beverly Hills, CA 90211 Don Neu, City Planner Jeremy Riddle, Project Engineer Chris DeCerbo, Principal Planner Michele Masterson, Senior Management Analyst File Copy Data Entry . Planning Division 1635 FaradayAvenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 f^gf ^..^P 14T08/(MS44-07 - ROBERTSON RANCH WEST VILLAGE *^ 30^203 ' ''^ Page UST OF ITEMS NEEDED TO COMPLETE THE APPUCATION Planning: 1. Although stated as an application for 364 apartments in total, the plans indicate that 365 apartments are proposed. Please adjust the plans accordingly to reduce the unit count to 364. 2. The Master Plan requires a minimum density of 20 du/ac for PA7 and PA8 combined. Please indicate the gross and net acreage for the two Planning Areas and compliance with the minimum density standard. 3. On the Dahlin group Cover Sheet for PA7/PA8 Apartments, please add "# units" for PA7 and "# units" for PA 8. 4. On the Dahlin group Sheet AO.O for PA7/PA8, please revise the PARKING SUMMARY to correctly refer to # apartments in Planning Area 7, # apartments in Planning Area 8, and 101 senior apartments in Planning Area 8. 5. The Dahlin group cover sheet for the senior affordable apartments should be revised to remove reference to PA7. 6. The project as submitted includes a change in the number of estimated residential units in PA7 from 116 to 96 and in PAS from 248 to 268. Reductions and/or increases in the numbers of residential units allocated to any of the master plan planning areas of up to 10% require a Minor Master Plan Amendment approved by the Planning Commission. Changes greater than 10% require a Major Amendment approval bythe City Council. As submitted, there is a 17.24% residential unit reduction proposed in Planning Area 7 which requires the submittal of a Major Master Plan Amendment. 7. Provide an exhibit illustrating the location of required resident parking for each building. 8. Please provide width and depth dimensions of balconies, decks, and patios on the plans. 9. Submit a supplemental acoustical analysis demonstrating compliance with the City of Carlsbad's Noise Guidelines Manual for the buildings in PA7. 10. Please provide a table quantifying all of the various common recreation areas throughout PA7 and PA8. 11. A Special Use Permit (El Camino Real Corridor) is required for the development of PA7. 12. Coordinate the civil, architectural and landscape plans for drive aisles, parking, carports, pedestrian walkways, etc. SDP 14-08/MS 14-07 - ROBERTSON RANCH WEST VILLAGE July 30, 2014 Page 3 Engineering: 1. Modify the title sheet to identify the property owner and the developer information. The data on sheet 1 is outdated. Refer to redlines. 2. Since this project proposed 2 lots that include common-use facilities (drive aisles, drainage, utilities, etc.), this project may require a residential PUD application. Please confirm with planning and address. 3. The layout/configuration of PA 4 (recreation lot) does not match CT 13-03. How will the lot lines for PA4 be adjusted? Will they be changed: 1) via the final map for CT 13-03 (not yet recorded), 2) included within MS 14-07, or 3) by separate lot line adjustment? Revise the exhibits to clarify what applications are responsible to document PA4 changes. 4. Provide a geotechnical report addressing subsurface site conditions, geotechnical feasibility, and proposed grading measures required for this project. 5. Revise the preliminary Storm Water Management Plan (SWMP) to include BMP/HMP sizing calculations for the detention vault/modular wetlands systems proposed on the Tentative Parcel Map. SDP 14-08/MS 14-07 - ROBERTSON RANCH WEST VILLAGE July 30, 2014 Page 4 ISSUES OF CONCERN Planning: 1. Planning Commissioners have through recent action indicated that a reduction in single car garage widths (from 12 feet to 10 feet in width) is not acceptable. The project should be revised to accommodate the minimum 12 foot standard width. As a note, the project description states that the reduced width is desirable in order to provide each unit within the building with a garage space, however, each building has 12 apartments and only 8 garage spaces. 2. As a coordination effort with the association of required resident parking for each building, reconsider the use of either the floor plan or reverse floor plan that places the two entries into each building at the closest point to the designated resident parking. 3. Re-assess the onsite pedestrian circulation paths to achieve the closest to a natural path of travel between apartment buildings and between apartment buildings and the recreation center. 4. A pedestrian connection from PA 8 to Robertson Road should be provided with the intent of creating a shorter natural path of access from PA 8 to the PA 4 West Village recreation facility. Such a connection will also serve as a closer, more direct access way for residents of PA 7 to the recreation center. 5. Buildings visible from El Camino Real must feature enhanced elevations. 6. Measures should be taken to reduce the top-of-slope visibility of the buildings along El Camino Real. Pursuant to the Hillside Ordinance (Section 21.95.140(l)(l), a top-of-slope setback for a 30 foot tall building is 21 feet. Tree planting along the El Camino Real slope will contribute to screening the visibility of the buildings from El Camino Real. Engineering: 1. Please consider creating separate exhibits/title sheets for the PA 7 Site Development Plan and PA 8 Site development/Tentative Parcel Map. It may be helpful to clarify how PA 7 is outside the subdivision boundary for MS 14-07, so it is not impacted by potential subdivision obligations of a parcel map. Having separate SDP applications for PA 7 and 8 may also offer other flexibilities when development permits are sought for either planning area. 2. In the upper right hand corner ofthe exhibits, list the application numbers for this project. Refer to redlines. 3. Revise the legend to include items found on the other exhibits (potable water service, sewer service, recycled water service, modular wetlands, bioretention basins, underground detention vaults, parking light fixtures, etc.). Refer to redlines. 4. Revise the key map so the sheet index is provided on sheet 3 (better scale). Refer to redlines. 5. Since this is a minor subdivision, revise the exhibits to call the proposed 'parcels' versus proposed'lots'(typical). Refer to redlines. 6. Revise the project so the proposed onsite sewer system is private, versus public (typical). 7. Revise the exhibits to delete the proposed onsite public recycled water system throughout PA 7 & PA 8. Revise the exhibits to provide recycled irrigation service/meters along the frontages to Gage Drive and Robertson Road. These will be the preliminary points of connection where (in final design) irrigation systems can be extended onsite to provide the onsite irrigation needs of SDP 14-08/MS 14-07 - ROBERTSON RANCH WEST VILLAGE July 30, 2014 Page 5 the project. 8. Clarify why PA 7 does not use pen/ious pavement, while PA 8 shows extensive use of it. 9. The preliminary SWMP indicates low soil permeability, therefore BMPs do not contemplate soil infiltration. However, exhibits on PA 7 include an extensive use of permeable pavement. Submit a geotechnical report that includes design guidance on the use of onsite permeable pavement. 10. Revise the preliminary SWMP to include the minimum sizes of bioretention required/provided. Provide this information on the bmp exhibits and demonstrate how the water quality features will treat the runoff from this project. Refer to redlines. 11. Revise the preliminary SWMP to address what BMP's will treat certain areas not yet identified. Refer to redlines. 12. Revise the exhibits to include an intersection choker/mid-block crossing on Robertson Road. This will serve as both traffic calming and an improved pedestrian linkage from PA 7 to PA 4 (recreation lot). Since this affects backbone improvements per CT 13-03, the city will coordinate with the developer of CT 13-03. Refer to redlines on sheet 3. 13. Revise each sheet to show short legal descriptions and street names for adjacent properties (typical). Refer to redlines. 14. Revise each sheet to show and callout 20-ft wide water easements to CMWD for onsite potable water systems. 15. Revise the exhibits to callout unique building numbers for each separate structure (typical), this information is on the exhibits for PA 7, but not PA 8. 16. Revise all exhibits to list the pad elevation for each proposed building (typical). 17. Revise the exhibits to callout the slope along proposed onsite sidewalks/walkways (typical) to demonstrate how designs satisfy current accessibility requirements. 18. Coordinate with the Fire Marshal regarding the proposed preliminary fire hydrant locations and revise the design if necessary. 19. Provide a typical section addressing the depressed bioretention areas in the parking lots. Clarify whether 0" curbs will be used with wheel stops or standard curbs with drainage openings. Will any fencing be needed to discourage pedestrians from crossing over depressed areas or is depression too minor to warrant this? the 20. Add callouts to exhibits proposing underground detention/modular wetland systems. Add preliminary volumes of these facilities as identified in the preliminary SWMP. 21. The legend symbol for pervious pavement seem to match the enhanced paving symbol on the traffic circles per CT 13-03. Revise the symbols to address this discrepancy. Refer to redlines (sheet 8). 22. Revise the exhibits to include references to adjacent sheets as you navigate through the project (typical). Refer to redlines. 23. Revise the exhibits/legend to callout symbols that may be covered parking areas (typical). Refer to redlines. SDP 14-08/MS 14-07 - ROBERTSON RANCH WEST VILLAGE July 30, 2014 Page 6 24. Revise the exhibits to callout if perimeter site walls are proposed around each planning area (typical). If so, callout type and height of the wall. 25. On sheet 2, add notes to clarify that frontage improvements are being provided per DWG 480-3 (CT 13-03). 26. On sheet 3, revise the composite map to include the sheet index information. Revise this exhibit to show utility layout information (potable water, private sewer, storm drain, etc.). Callout existing onsite and adjacent short legal descriptions from CT 13-03 and the proposed parcels per this application. Show/callout the fire hydrants surrounding the project to be built per CT 13-03. Provide a key map legend. Add street names. Refer to redlines. 27. On sheet 3, can the proposed emergency access turn-around area be constructed with pervious pavement or pervious pavers to limit urban runoff? Coordinate this concept with the Fire Marshal prior to making change. Will this area be hatched with striping or will bollards be necessary to discourage resident parking in this area? 28. On sheet 4-6 and sheet 8, callout the 'proposed' parcel line. Add callouts for Parcel A and Parcel B along with the proposed acreages for each. Refer to redlines. 29. On sheet 5, coordinate the utility improvements on Gage Drive per CT 13-03 so they match the proposed connections per these exhibits. Refer to redlines. 30. On sheet 5, callout the width and type of easement encumbering the property along Gage Drive. Refer to redlines. 31. On sheet 5, include pedestrian ramps where the sidewalk (per CT 13-03) intersects the proposed driveway. Orient the pedestrian ramps in the flow of pedestrian movement versus diagonal pedestrian ramps. Show modifications to the sidewalk connections, if any. Refer to redlines. 32. On sheet 5, show/callout proposed topographic information between Parcel A and Parcel B. Refer to redlines. 33. On sheet 6, move the waterline away from proposed multi-story structures. Since the onsite public recycled water is not required, this will allow for the waterline to be shifted. Refer to redlines. 34. On sheet 8, consider relocating the trash enclosure near the gate for PA 8. The current location appears to cause gate issues or delays as residents enter the project. Refer to redlines. 35. On sheet 9, callout the width and type of easement encumbering the property along Robertson Road. Refer to redlines. 36. On sheet 9, clarify if a project fence/wall is proposed along the perimeter of PA 8. Provide a typical section where this project abuts PA 4 to demonstrate changes in grade as it relates to the adjacent property. 37. On sheet 9, callout the proposed acreage for PA 4, as it is modified from CT 13-03. Coordinate with Planning on approval for any Master Plan changes. 38. On sheet 10, clarify whether the second entrance off Robertson Road will include gates. 39. On sheet 10, revise the exhibit to clarify how bioretention basin 1 will drain if clogged. Provide finish surface elevations to show emergency overflow is contained onsite and does not drain down the slope to El Camino Real. SDP 14-08/MS 14-07 - ROBERTSON RANCH WEST VILLAGE July 30, 2014 Page 7 40. On sheet 10, the grading for PA 7 encroaches approximately 7-feet into the pedestrian access easement and sidewalk per CT 13-03. The exhibits show reconstructing the sidewalk. Revise the grading to avoid grading within the access easement and conflict with the meandering sidewalk per CT 13-03. Maintain the large landscape buffer area created as part of the master plan. 41. On sheet 10, add elevation numbers to the proposed topography lines along Robertson Rdad. Refer to redlines. 42. On sheet 10 and 11, correct the storm drain symbol to match the legend. 43. On sheet 10 and 11, the bioretention basin numbers for PA 7 are already used on earlier sheets for PA 8. Since this is a comprehensive site plan, use unique basin numbering throughout the exhibits. Refer to redlines. 44. On sheet 10 and 11, include pedestrian ramps where the sidewalk (per CT 13-03) intersects the proposed driveway. Orient the pedestrian ramps in the flow of pedestrian movement versus diagonal pedestrian ramps. Show modifications to the sidewalk connections, if any. Refer to redlines. 45. On sheets 10 and 11, clarify whether the courtyard pavement between buildings are proposed with pervious pavement. The symbols used seem to match that on the legend. Refer to redlines. 46. On sheet 11, callout the linear bioretention swale along Robertson Road per DWG 480-3. 47. On sheet 11, clarif/ how maintenance access will be provided to the proposed sewer manholes at the southeast corner of PA 7. Will maintenance vehicles be able to drive over the below ground vaults? 48. On sheet 12, the exhibit shows conflicts with fire engine access as it enters and exits the project entry just west of Gage Drive and West Ranch Street. The turning templates show the trucks driving against the flow of traffic and driving over raised medians, which will not be permitted. Coordinate with the Fire Marshal to provide emergency ingress/egress to the project. Revise the design to address this discrepancy. 49. On sheet 13, compile all three paths into one comprehensive exhibit (like sheet 12 does). Showing multiple paths are confusing for a discretionary application. 50. Revise the exhibits to address all other the redlines (see attached). Attached are redlined SWMP and Site Plan/TPM exhibits for the project submittal. Please return this redlines check print with the revised plans and studies to facilitate continued staff review. If you have any questions, please call Jeremy Riddle at 602-2737. Landscape: Please refer to the landscape comment memorandum prepared by Michael Elliott, dated July 8, 2014 (enclosed). Police: Please refer to the police comment memorandum prepared by Jodee Sasway, dated July 18, 2014: (enclosed).