Loading...
HomeMy WebLinkAboutPD 300; CORTE DEL CEDRO; Engineering Application• CITY OF CARLSBAD • · ,I ENGINEERING DEPARTMENT FEES AID DEPOSITS WORKSHEET { PREPARED By: _D...., ...... H.....,~=-:.W>~/1 t:,=+--- P RO J ECT NAME :_f_o __ ._'?>_o_o __ L ___ b_. t.f ..... ,_5...,,_7_~ ...... 1.....__,t_or __ 7_1_ ..... 1_i_ DATE =-1----"-7--'-f"--?;;.__ __ _ TENTATIVE PARCEL MAP FEE ••••••••••••• I •••••••• , _ _._.#, .... /4 _____ _ ~~ MAP FEE (. LOTS)(PARCEL MAP/FINAL MAP NO, OF LOTS __ ), , , _ _....,A"l-(/,..c.;;A.__ __ _ (EXPEDITED/NOT EXPEDITED) PARCEL MAP EXTENSION FEE I I. I. I •• I I. I I •• I I •• I I I • __ N.~½_,_A_,_ __ _ IMPROVEMENT PLAN CHECK FEE: DEPOSIT WITH SUBMITTAL 1;/5Dr:JE RECEIPT NO, --- IJj~~f~MEl:-!ESCR IPT ION BONDED VALUE ro/ct2-HwD TOTAL: IMPROVEMENT INSPECTION FEE: ----,.I-TE~M---t~~-uJD_v_A_Lu_E __ TOTAL: _...........,________ X =p E=R"""C""'E""'NT=-A,.....,G=E-= PARK-IN-LIEU FEE (CIRCLE ONE): DWELLING TYPE: SF OR DUPLEX MF (<4 UNITS) MF(> 4 UNITS) MH AREA: 1 2 3 4 NUMBER OF UNITS: ---------X -----.--AREA FEE/UNIT = STREET.LIGHT ENERGIZING: 5,800 LUMEN _____ AT 81,00 = ______ _ 9,500 LUMEN AT 111,06 = _____ _ 16,000 LUMEN AT 152, 10 = ______ _ 20,000 LUMEN AT 169,38 = ------- TOTAL: = GRADING PLAN CHECK FEE DEPOSIT ______ RECEIPT NO,---'---- (EXPEDITED/NOT EXPEDITED) GRADING PLAN CHECK FEE ( ___ CUBIC YARDS) , , , , , , , , , , , , , __ N_/4 ___ 4 _____ _ I I I I I I I I, I I I I I I I I I I I ... __ N~I_A ___ _ GRADING CASH DEPOSIT DUPLICATE TRACING FEE , , I I I I I I I I I I I I I I I I I I I • • , , ____ rJ--=I A ______ _ STREET SIGN DEPOSIT: _____ AT ___ = ______ _ _____ AT ______ = ______ _ _____ AT ____ = ______ _ TOTAL: = STREET STRIPING DEPOSIT I I I I I I I I I I I I I I e • I . . . • • • • _ __,;,tJ___.__.IA ____ _ FRONT LINE OR AREA FEES (TYPE ___ ) , , , , , , ... • • • • I • • _ __.,tJ.........,l_,._A.,__ __ _ DRAINAGE AREA FEE (AREA NO, ___ ), , , I ii I I . . . I I I I I TOTAL ACRES: ___ X ____ = --..---- AREA FEE LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS AS NOTED IN MASTER DRAINAGE PLAN DOCUMENTS MULTIPLIED BY CURRENT INFLATION FACTOR, LINE VALUE X FACTOR = AMOUNT X X X .TOTAL: = = = DRAINAGE FEE DUE: ADDITIONAL FEES: nJW n c.J._, [1<.P._ fsll} g TYPE : _@: ____ ...........,K~-------l(--.~-----c-, . , . , C.. .~ , , ? , , . . . • • • _____ N ___ I __ A ______ _ . . , _...,_N__.I ....... A-______ _ .. ·--.a;.~-=----TYPE: __________ • I ••••••• I •••••• TOTAL FEES AND DEPOSITS: ..• I (IN ADDITION, A GRADING PERMIT FEE OF _____ _ IS DUE UPON ISSUANCE OF THE GRADING PERMIT,) .---------------------------~----• -~-.-- rIRM =-=w~e_s.,..l-__ ~=c:l=S_l-_r_O_e .... s.~1r-,J,1 .... n,;__ __ I<. J U/4,-/-e. l~O z:, TENTATIVE MAP APPROVAL: µIA 1ST EXTENSION: ----2ND EXTENSION: ____ _ IMPROVEMENT PLAN NO.: .Dwc1 ':J,ff-2,.. GRADING PLAN NO.: ----------.--------------"AS BUILTS" APPROVED: GRADING PERMIT NO.: __________ _ EROSION CONTROL PLAN: _______ _ AND AGREEMENTS (\ fl f-.,\_l,u\J) ~~ FAITH l _ LABOR & MONUMEN-SECURITY AGREEMENT TITLE EXPIRATION PERFORMANCE MATERIALS TATION TY~E (CASH, COMMENTS DATE BOND AMT. BOND AMT. BOND AMT. SURETY LOC) SURETY COMPANY: ______________________________ _ ADDRESS: _ ___.. _________________________________ _ CONTACT: ___________ ...,... ____________ PHONE: ______ _ EASEMENTS USE LOCA.T ION RECORD NO. l.orS 4 -5 HM 9144 REPORTS TYPE OF'. REPORT STATUS (IN, N/A) CHECKED BY ee WAT-ER DI s TR IC T :_C ___ l<_t-1\ ___ W_f) ________ _ SEWER DISTRICT: _____________ _ SCHOOL DISTRICT: _____________ _ PLANNING AREA: _____________ _ ORA IN AGE ~REA-:__..,__ __________ _ SPECIAL ZONES:(ASSESSMENT, THOROUGHFARE, PLANNING ACliON: --------------BRIDGE DISTRICTS: ___________ _ COMMENTS: ____ ......, __________________________________ _