Loading...
HomeMy WebLinkAboutPD 433; CARLSBAD GOLF FACILITY; Engineering Application•adAA/(Z - S LE- ? 0 _ CitY--of Carlsbad ............ . . . . . . . . . . October 4,1995 , .'Mr. Dennis Koblhaàs Y Scripps Bank Center . 411 South Escondido Boulevard - -, 'Escondido, CA92025 CARLSBAD GOLF PRACTICE FACILITY (PD 433) c - In response to your request, the City Engineer has agreed to defer some of the frontage improvements required of the Golf Practice Facility. This deferral extends only to the street widening along the property frontage with Haymar Drive west of the Haymar bridge and the street light proposed at station 124+50 on the improvement plans: The improvements east of the bridge and the streetlight just west of the bridge are still required to be installed at this time. The property owner will be required to enter into our standard Contract for Future Public Improvements for the deferred improvements prior to our releaseon the project., With regard to the Buena Vista Creek maintenance, the City does not concur with your, conclusion that the sediment and accumulated growth within the channel resulted in the flooding of the Golf Practice(Facility site The project site is- located entirely within the floodway for the Buena Vista Creek..It was clearly projected by this Department and your engineering consultants that the site would frequently be inundated during medium to heavy storm events'..It was for this reason that the .structures on the site were required to incorporate flood protection construction measures. The hydraulic analysis done for the Buena Vista Creek, and validated by the hydraulic studies done for the project, identified the bridge as the controlling factor for the upstream water elevation and, not the geometrics or condition of" the 'dównstréam channel. The channel condition was clearly evident prior to the construction of your clients project. If the condition of the channel was a major factor in the hydauIics of the site, then your clients consultant engineer 'should have made such identification and incorporated appropriate mitigation recommendations into the hydrology report With that said, the City does not object to your client removing any accumulated sediment, debris or vegetation from the channel immediately west of the Haymar bridge provided your client complies with the following requirements: . :. 1. Submit a sketch showing the location and extent of the area of the channel to be . cleared 1pclude a brief description of the types of vegetation to be removed and the construction method to be employed. Include a' description of where the removed materials,will bedisposed:. 2075 Las Palmas Dr. • Carlsbad CA 92009-1576 (619) 438-1161 • FAX (619) 438-0894 I . I . October 4, 1995 Golf Practice Facility Page Submit aright-of-way permit application and receive approval* from the City, prior to initiation of the maintenance activities. All normal City insurance requirements must be complied with prior to City issuance of the permit Submit written permission from the State Fish and Game Department and the. Federal Fish and Wildlife Agency. The permission should include a description of the work, a sketch or areferenceto a sketch which clearly describes the work fbr which they are giving their permission Upon cpmpletioftof the actions noted above, the City will grant authorization to perform the channel maintenance vvork The channel maintenance work will be cbnsidered an extension of the existing grading work done on the project site. The work will thus be secured under the existing grading and erosion control agreement. As such, the grading bonds and cash security held on the project will not be released until the City determines that the channel maintenance' work is completed in compliance with the City and . resource agency requirements. • . . • .. • If you. need additional clarification On this matter, please.feelfreeto give-me a call at 438- 1161 Ext 4362. • ;• . • • . • • Respectfully, .. . .. . . •• • • • • • 0_ J, . David Hauser • • . . • • • • -. Assistant City Engineer . •. A c,,.- • Community Development Director • ' . •• •• . : City Engineer •• • • • • • •• •• • •: Director of Community Services • • • • • •• • Assistant Planning Director', • • • • •• S Principal Construction Inspector, Management Assistant Bock •' • S • • • . S • r • S September 15, 1995 ECEIVED CITY OF CARLSBAD 4# 1819 M as P. Received COMM Oevelopm Mr. Martin Orenyak — Director of Dev,pmenta Services City of Carlsbad 1-11 2075 Las,Palmas Car1sbd. CA 92009 . . - ;1 ?D433 DENNIS KOOLHAAS & ASSOCIATES SCRIPPS BA1'JX CENTER - - 411 SOUTRESCONDIDO BOULEVARD EscoNDiDo, CALIFORNIA 92025 TELEPHONE: (619) 737-6184 FACSIMILE: (619) 737-6186 RE: Carlsbad Golf Practice Facility Dear Marty: Think you for the time that you and Lloyd spent with us at the above captioned site In relation to the unresolved issues, we would offer, the following Street Widemng Pursuant to our, conversation, Mr Huffmin would agree to bmd himself to NEn-disputeAgreémentto cbrhplëtë thideniiigöftheroad and perforiif curb and gutter work on Haymar, west of the bridge to the property line at whatever time other development were to take place on Haymar A you were able to observe, the street widening and curb àndgiitter -placenerit perforniedaldig the project frontage east of the Haymar Bridge; This was performed accordingto Our understanding of the conditions of approval. S Street Lighting: As we explained, it is our belief and that, of our lighting engineer, there is sufficient ambient light from the course lighting to illuminate Haymar Drive to City of Carlsbad standards. However, after our nieting and wherein you expressed your desire to have lighting in the bridge, we discussed this matter with SDG&E. We were informed SDG&E could readily install a Street light along Haymar Drive at the Buena Vista Creek crossing. This would illuminate the bridge and most of the street to the property line. SDG&E does not feel it is feasible to place a light standard further east than the bridge due to the contour of the hill on the one side, and the location of the creek on the other.-,We would however, stipulate through 'a Non-dispute Letter that we would mstall the second light standard at whatever time the road is improved :Buena.Vista.CreekAsyou: ie'callthecrëekthaIiné1 Wet Oftli€itë is overgrown with reeds, whereby a ñiassivebuildup ofsilt'Occutfed. TDui lásiiiIt&s tOrn, .thisr siltation impeded the natural flow of storm water, causing a back-up that caused in excess of $60,00000 of damage to Mr. Hüffman's site. It is my understanding, that the