Loading...
HomeMy WebLinkAboutPE 2.10.46; LA COSTA MEADOWS UNIT 4 LOT 724; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 729-1181 / Validation by Finance Department Building Permit Plan Check No FOR APPLICANT TO FILL IN Site Addres i60 A? 4L3rAci. 4 1A Surety Bond Bond No. Legal Description lb-J' 11.4 Map No 6'7 Surety Surety Company 22iNarn4 MunglyB LA ~4* # Surety Address HA4EMAN eé4t2 Date Filed Rec'd by 0T1orJty LL4W Cash deposit Rec'd by Date filed $ I ngneer R.C.E. The following documents are required and shall become a part of the grading permit when they are approved. Grading plans Specifications - 4jJrg si' ARLTA1D Soil report Retaining Walls Drainage structures _____ Other R.C.E.P Compaction report Gr ar, - Phone , SPECIAL CONDITIONS WHICH ARE MADE S Ag______~~ff\AW-g4K_M A PART OF THIS PERMIT Party_Lespon 51h1ø for overallsuoe NO V, M 1 Authorized hours of operation: 7:00 AM to 5:00 PM, Monday - Friday. Haul routes are to be approved by City Engineer. 240 Number of cubic yards Adequate provisions shall be made for erosion and siltation control. Cut Fill Import Waste a)soo All slopes shall be planted per direction of Parks & Recreation Director. Proposed Schedule of Operations (dates) 82.?79 All fills to be compacted to at least 90% of optimum I hereby acknowledge that I have read the application and state that density unless noted otherwise. the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. , INSPECTOR'S INSPECTION DATE, Signature of Permittee ___________________________________________ SIGNATURE Ground preparation Owner or authorized Rough grading ENVIRONMENTAL CLEARANCE - Compaction report rec'd. EIA Log No. Date ________________________ ____________ Planting & drainage Final certification rec'd. By Grading permit fee $ Work completed Permit Issued I Surety bond released by Date Copies: White-Office; Green-Building; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD