HomeMy WebLinkAboutPE 2.10.46; LA COSTA MEADOWS UNIT 4 LOT 724; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
729-1181
/
Validation by Finance
Department
Building Permit Plan Check No
FOR APPLICANT TO FILL IN
Site Addres i60 A? 4L3rAci. 4 1A Surety Bond Bond No.
Legal Description
lb-J' 11.4
Map No
6'7
Surety Surety Company
22iNarn4
MunglyB LA ~4* #
Surety Address
HA4EMAN
eé4t2 Date Filed Rec'd by
0T1orJty LL4W Cash deposit Rec'd by Date filed
$
I ngneer R.C.E. The following documents are required and shall become a part
of the grading permit when they are approved.
Grading plans Specifications - 4jJrg si' ARLTA1D Soil report Retaining Walls
Drainage structures _____ Other R.C.E.P
Compaction report Gr ar, - Phone ,
SPECIAL CONDITIONS WHICH ARE MADE
S Ag______~~ff\AW-g4K_M A PART OF THIS PERMIT
Party_Lespon 51h1ø for overallsuoe
NO V, M
1 Authorized hours of operation:
7:00 AM to 5:00 PM, Monday - Friday.
Haul routes are to be approved by City Engineer. 240
Number of cubic yards
Adequate provisions shall be made for erosion and siltation
control.
Cut Fill Import Waste
a)soo All slopes shall be planted per direction of Parks &
Recreation Director. Proposed Schedule of
Operations (dates) 82.?79
All fills to be compacted to at least 90% of optimum
I hereby acknowledge that I have read the application and state that density unless noted otherwise.
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application. , INSPECTOR'S INSPECTION DATE,
Signature of Permittee ___________________________________________ SIGNATURE
Ground preparation
Owner or authorized Rough grading
ENVIRONMENTAL CLEARANCE - Compaction report rec'd.
EIA Log No.
Date ________________________
____________ Planting & drainage
Final certification rec'd. By
Grading permit fee $ Work completed
Permit Issued I Surety bond released
by Date Copies: White-Office; Green-Building;
Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD