Loading...
HomeMy WebLinkAboutPE 2.10.6; LA COSTA MEADOWS UNIT 1; Engineering ApplicationPERMIT NO. - •pplication for Grading Per•S (letter code + number) CITY OF CARLSBAD L=Iot PUBLIC WORKS & BUILDING DEPARTMENT S=subdivision 1200 Elm Avenue C=City contract "7 76 g 729-1181 FOR APPI ICANT TO F1 IN -pain - Sit Address (7 3' ' DC I EJ243 4 iq Surety Bond MAY 2f 13 ib BbYdNo. -tU4.jU _________________________ Lega l Description & Map No. ?— L JYJ Surety Company Subdivision Name i L-'Ai A, Surety Address )wner, Phone (j Date Filed Rec'd by Owner's Address Cash deposit Rec'd by Date filed P lans by Civil Engineer R.C.E. h1IL/,tA-c& 1 The following documents are required and shal become a part of the grading permit when they are approved. _Grading plans Specifications _Soil report Vicinity map Drainage structures Retaining walls Compaction report Other 7p( A4,7 /—/ A ddress Phone ,/ Z-/ q-s/ 3o Soil ner R.C.E. Phone 4rading Contractor Phone __ Address Check if supervised iL 143op) grading SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT responsible for overall supervision I. Authorized hours of operation: 7:00 AM to osed use of arde site r Xos c_4c 5:00 PM, Monday-Friday. Haul routes are to be approved by City lumber of cubic yards Cut Fill Import Waste Engineer. Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per direction 3c jg 0 of Parks & Recreation Director. Total /g' p- - - Compacted fills (yes or no) Proposed Shedule of Start Fnish Operations (dates) I hereby acknowledge that I have read the applica- tion and state that the information I have provide is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee___________________________ Owner or authorized - INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation Rough grading Compaction report rec'd. Planting & drainage Final certification rec'd. Grading permit fee $ gct e Work completed 4 Surety bond released Permit Validation byP/V'—.. Date Permit Expiration Date /7// 74' THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD i CITY OF CARLSBAD ENVIRONMENTAL PROTECTION ORDINANCE OF 1972 DECLARATION OF NEGATIVE (NON-SIGNIFIcANT) ENVIRON1ENTAL EFFECT - APPLICANT S_E bA ivE S-A i&O.. C A valay TYPE OF APPLICATION:. '. ?LA4 PERMIT AND/OR FILE NO: ___6feAbi4 P I T THE ENVIRONMENTAL IMPACT ASSESSMENT HAS BEEN RECEIVED FOR PROJECT DESCRIPTION GI?,Ab14C'-re_-rJO Oc5E_1Ac 'Jt_ PROJECT LOCATION Lor 2o-2O LiC05 t1aiJ0.' OAj LC;E1ZWA6A ?LA I declare that I have examined the information for the above project as submitted by the applicant, and on the basis of the Environmental Impact Assessment questionnaire on file in my office as a public documents it is my determination that this project will not have any significant impact upon the environment within the meaning of the California Environmental Quality Act of 1970 and the Environmental Prtection Ordinance of 1972 for the following reasons 1 The grading proposed is minimal, 1830 cubic yards over the entire area - 2 The change in natural topography will not be significant. The proposed - grading will cause no drainage problems 3.. The property contains no structures, significant vegetation, or unique F natural features that would be impacted 4. City Departments have required safety-features be incorporated into the grading plan for the driveways The Environmental Impact Assessment will be available for public review .and comment for five working days after date of publication, -April '12,1978 ':- • •• '• .1 J_SC _HAGAMAN,/la_ngDireci. DATED E.I.S.-Log No. ___•• Rev. 3/16/77 • • • • • S FORM PLANNING 42