HomeMy WebLinkAboutPE 2.8.6; GREEN VALLEY KNOWLES UNIT 2; Engineering Application/
PERMIT NO. '2..
Application for Grading Pe (letter code + number
CITY OF CARLSBAD LIot
PUBLIC WORKS & BUILDING DEPARTMENT S=subdivision
ADDENDUM TO 1200 Elm Avenue C=City contract
GRADING PERMIT FOR 729-1181
C.T. 7507
FOR APPI ICANT TO Fill IN
Site Address
El Camino Real & Levante St.
Surety Bond Bond No.
Legal Description Map No.
Lot. No. 227
Surety Company
Subdivision Name
Green Valley Knolls Unit 2
Surety Address
)wnerTrustees of the CentraiPhone Fund
States, Southeast & Southwest Areas Pensioi
Date Filed Rec'd by
Owner's Address
264 Fourth Ave. San Diego Ca. 92103
Cash deposit Rec'd by Date filed
$
Plans by Civil Engineer R.C.E.
Wi11ini B,. Rick 9416
The following documents are required and shal
become a part of the grading permit when they
are approved.
ading plans L-4ecifications
Osoil report _cinity map
Drainage structures taming walls
ompac1-ion report JRher
Address Phone 729-
3088 Pin Pico Blvd. Carlsbad, Ca.4987
SoiI$'rgineer R.C.E. Phone
Phillip FT. Bni-on 1171312 565-1955
Grading Contractor Phone
C.alrleron Rr'rq.. Cnnf. Co.. 278-3050
Address Check if supervised
7766 B1hn Ave. San Diegrading x
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
arty responsible for overall supervision
La Costa T.n1 Co. s Benton Engineering Co. I. Authorized hours of operation: 7:00 AM to
roposed use of grade site .
Residential Dv1opeinnt
5:00 PM, Monday-Friday.
Haul routes are to be approved by City
Number of cubic yards
Cut Fill Import Waste
Engineer.
Adequate provisions shall be made for
erosion and siltation control.
All slopes shall be planted per direction 125,000 I 1 of Parks & Recreation Director. Total CT75-7
25,000 Cu. yds. (part of 1,090,000 for)
1=7- Compacted fills (yes or no) .
Yes
Proposed Schedule of Start Finish
Operations (dates) 6/1/76 12/30/76
I hereby acknowledge that I have read the applica-
tion and statethat the information I have provide
is correct and agree to comply with all City
or.dinances and State laws regulating excavating.and
grading, and the provisions and conditions of any
permit issued pursuant to this application
Signature of Permittee
Owner or authorized agent
- INSPECTION DATE INSPECTOR'S
SIGNATURE
Ground preparation
-Rough grading
Compaction report rec'd.
Planting & drainage
Final certification rec'd.
Grading permit fee $ Work completed
Surety bond released
Permit Valid
by %/ /j/ Date
Permit Expiration Date_______4114 ________________
THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
S Appli/atn for Grading Peró
PERMIT
i o
(letter code + number)
IC ITYY OF CARLSBAD LIot
PUBLIC WORKS & BUILDING DEPARTMENT S=subdivision
1200 Elm Avenue 4/1/_7ie' C=Ci-t-y contract
729-1181 PAI
tt,o ACd. OpO 1- £O,- 48c5
FOR APPLICANT TO Fill IN fPTki 'I
Site Address Surety Bond Bond No.
Levante Street
Legal Description Portions of Sec Nap No. Surety Company
35 & 36-T12S-R4W &Sec. 2-T13S-R4W-SBM _ Subdivision Name Surety Address
C.T. 75-7 Green Valley Knolls
Owner Trustees of the Central Phone
States S.E. & S.W. Areas Pension Fund Date Filed Rec'd by 10
Owner's Address
2645 Fourth Ave., San Diego, Calif 92103 Cash deposit Rec'd by Date filed
$
Plans by Civil Engineer R.C.E.
William B. Rick 9416
The following documents are required and shal
become a part of the grading permit when they
a
,
pproved. 1-11 ading plans ecifications
1
_ * II report /./Vicinity map
Drainage structures Retaining walls
ompaction report Other
Address Phone
3088 Pio Pico Dr., Carlsbad 729-4987
Soil Engineer R.C.E. Phone
Phillip H. Benton 10332 714/5 65-195 5
Grading Contractor Phone Cameron Bros. Construction Co. 714/278-3050
Address Check if supervised SPECIAL CONDITIONS WHICH ARE MADE
7766-Balboa, San Diego grading Yes A PART OF THIS PERMIT
'arty responsible for overall supervision
La Costa Land Company- Construction Division I. Authorized hours of operation: 7:00 AM to
'roposed use of grade site 5:00 PM, Monday-Friday.
Residential Development Haul routes are to be approved by City
Jumber of cubic yards Engineer.
Cut Fill Import Waste Adequate provisions shall be made for
erosion and siltation control.
1,090,0010 -1,090,001
I
0 ----
All slopes shall be planted per direction ____________________
of Parks & Recreation Director. Total
1,090,000
Compacted fills (yes or no)
Yes.
Proposed Schedule of Start Finish
Operatiojis (dates) 4-9-76 10-9-76
I hereby acknowledge that I have read the applica-
tion and state that the information I have provide i
is correct and agree to comply with all City INSPECTION DATE INSPECTOR'S
SIGNATURE
Ground preparation ordinances and State laws regulating excavating and
grading, and the provisions and conditions of any
permit issued pursuant to this application Rough grading
Compaction report rec'd.
Signature of Permittee / Planting & drainage
Owner or authorized Final certification rec'd.
Grading permit fee $ 1,860.00 Work completed
4 Surety bond released
Pe(mi-t-'\VaI idat
EM a
Permit Expiration Date-.
THIS FORM WHEN PROPERLY VALI6ATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED
- THISPERMITISVALIDFORASIX(6)MONTHPERIOD