Loading...
HomeMy WebLinkAboutPE 2.8.6; GREEN VALLEY KNOWLES UNIT 2; Engineering Application/ PERMIT NO. '2.. Application for Grading Pe (letter code + number CITY OF CARLSBAD LIot PUBLIC WORKS & BUILDING DEPARTMENT S=subdivision ADDENDUM TO 1200 Elm Avenue C=City contract GRADING PERMIT FOR 729-1181 C.T. 7507 FOR APPI ICANT TO Fill IN Site Address El Camino Real & Levante St. Surety Bond Bond No. Legal Description Map No. Lot. No. 227 Surety Company Subdivision Name Green Valley Knolls Unit 2 Surety Address )wnerTrustees of the CentraiPhone Fund States, Southeast & Southwest Areas Pensioi Date Filed Rec'd by Owner's Address 264 Fourth Ave. San Diego Ca. 92103 Cash deposit Rec'd by Date filed $ Plans by Civil Engineer R.C.E. Wi11ini B,. Rick 9416 The following documents are required and shal become a part of the grading permit when they are approved. ading plans L-4ecifications Osoil report _cinity map Drainage structures taming walls ompac1-ion report JRher Address Phone 729- 3088 Pin Pico Blvd. Carlsbad, Ca.4987 SoiI$'rgineer R.C.E. Phone Phillip FT. Bni-on 1171312 565-1955 Grading Contractor Phone C.alrleron Rr'rq.. Cnnf. Co.. 278-3050 Address Check if supervised 7766 B1hn Ave. San Diegrading x SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT arty responsible for overall supervision La Costa T.n1 Co. s Benton Engineering Co. I. Authorized hours of operation: 7:00 AM to roposed use of grade site . Residential Dv1opeinnt 5:00 PM, Monday-Friday. Haul routes are to be approved by City Number of cubic yards Cut Fill Import Waste Engineer. Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per direction 125,000 I 1 of Parks & Recreation Director. Total CT75-7 25,000 Cu. yds. (part of 1,090,000 for) 1=7- Compacted fills (yes or no) . Yes Proposed Schedule of Start Finish Operations (dates) 6/1/76 12/30/76 I hereby acknowledge that I have read the applica- tion and statethat the information I have provide is correct and agree to comply with all City or.dinances and State laws regulating excavating.and grading, and the provisions and conditions of any permit issued pursuant to this application Signature of Permittee Owner or authorized agent - INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation -Rough grading Compaction report rec'd. Planting & drainage Final certification rec'd. Grading permit fee $ Work completed Surety bond released Permit Valid by %/ /j/ Date Permit Expiration Date_______4114 ________________ THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD S Appli/atn for Grading Peró PERMIT i o (letter code + number) IC ITYY OF CARLSBAD LIot PUBLIC WORKS & BUILDING DEPARTMENT S=subdivision 1200 Elm Avenue 4/1/_7ie' C=Ci-t-y contract 729-1181 PAI tt,o ACd. OpO 1- £O,- 48c5 FOR APPLICANT TO Fill IN fPTki 'I Site Address Surety Bond Bond No. Levante Street Legal Description Portions of Sec Nap No. Surety Company 35 & 36-T12S-R4W &Sec. 2-T13S-R4W-SBM _ Subdivision Name Surety Address C.T. 75-7 Green Valley Knolls Owner Trustees of the Central Phone States S.E. & S.W. Areas Pension Fund Date Filed Rec'd by 10 Owner's Address 2645 Fourth Ave., San Diego, Calif 92103 Cash deposit Rec'd by Date filed $ Plans by Civil Engineer R.C.E. William B. Rick 9416 The following documents are required and shal become a part of the grading permit when they a , pproved. 1-11 ading plans ecifications 1 _ * II report /./Vicinity map Drainage structures Retaining walls ompaction report Other Address Phone 3088 Pio Pico Dr., Carlsbad 729-4987 Soil Engineer R.C.E. Phone Phillip H. Benton 10332 714/5 65-195 5 Grading Contractor Phone Cameron Bros. Construction Co. 714/278-3050 Address Check if supervised SPECIAL CONDITIONS WHICH ARE MADE 7766-Balboa, San Diego grading Yes A PART OF THIS PERMIT 'arty responsible for overall supervision La Costa Land Company- Construction Division I. Authorized hours of operation: 7:00 AM to 'roposed use of grade site 5:00 PM, Monday-Friday. Residential Development Haul routes are to be approved by City Jumber of cubic yards Engineer. Cut Fill Import Waste Adequate provisions shall be made for erosion and siltation control. 1,090,0010 -1,090,001 I 0 ---- All slopes shall be planted per direction ____________________ of Parks & Recreation Director. Total 1,090,000 Compacted fills (yes or no) Yes. Proposed Schedule of Start Finish Operatiojis (dates) 4-9-76 10-9-76 I hereby acknowledge that I have read the applica- tion and state that the information I have provide i is correct and agree to comply with all City INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application Rough grading Compaction report rec'd. Signature of Permittee / Planting & drainage Owner or authorized Final certification rec'd. Grading permit fee $ 1,860.00 Work completed 4 Surety bond released Pe(mi-t-'\VaI idat EM a Permit Expiration Date-. THIS FORM WHEN PROPERLY VALI6ATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED - THISPERMITISVALIDFORASIX(6)MONTHPERIOD