Loading...
HomeMy WebLinkAboutPE 2.81.43; TNT PROPERTIES CHESTNUT AVE; Engineering ApplicationApplication for Grading Permit PE NO.2 CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue Validation by Finance s..4 -U)tr 4385541 Department Building Permit Plan Check No. FOR APPLICANT TO FILL IN Site Address . .7 C-IJwJ 1, C. Surety Company . ncIo. Legal Description ap N 0. M Surety Address Subdivision Name Date Filed Rec'd by Owner Phone Cash deposit Rec'd by Date filed . $ Owner's Address The following documents are required and shall become a part 9-44 --(Li. tL.-O of the grading permit when they are approved. Pla,s by Civil Engineer R C.E. Grading plans Specifications Soil report Geologic Report address Phone ?2'2_ 74 rAS' isj. (J Drainage structures. _____ Other __ Compaction report Soil Engineer R.C.E. Phone &f-73 co . A) / Grading Contractor Phone 'ç sJ ____ SPF(IAI CnN.FF+oNs Wffit AFE MADE rr 72$7 —37773 A PART OF THIS PERMIT Address 24 G -.fO..1 2QA.51vç Authorized hours of operation: L r T 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Haul routes are to be approved by City Engineer. 0 site Psed Adequate provisions shall be made for erosion and siltation Number of cubic yards control. Cut -'j Fill t4-'7 Import Waste All slopes shall be planted per City Code. MHM ,cYc Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum Operations (dates) density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is: REGULAR GRADING - City inspector will make inspections this application. listed below. C CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Owner or authorized agent Initial . site prep. ENVIRONMENTAL CLEARANCE - Date _____________________ 1O Rough. prior to drains Final . slopes planted - ElALogNo. By ____________________ Grading permit Plan check fee $ .7 Compaction reports rec'd. Permit 4__-,-7 t Private engr. cert. rec'd. oy uat Copies: White-Office; Green-Building; 0-3 Permit Expiration Date to ' Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD