Loading...
HomeMy WebLinkAboutPE 2.82.7; LA COSTA SOUTH UNIT 1 LOT 31; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-5541 PENOZ p2-7 51 65-00 MC 13 /V v Mj~l 8 ~2 IL Validation by Finance Department Building Permit Plan Check No FOR APPLICANT TO FILL IN Site AddLass Surety Company Bond No. L1ega1 Description Map No , / 2 ,, Surety Address ______________________________ Subdivision Name Date Filed Rec'd by Owner Ph ne Cash deposit Rec'd by Date filed $ Owner's Addres 3',3' 7S7 The following documents are required and shall become a part of the gading permit when they are approved. ,/Grading plans Specifications P1 ns by Civil Engineer R.0 E h cc' ,T-i4N..gHJ q' _.iL. Soil report Geologic Report , Drainage structures ____ Other Compaction report Address Phone '.1z C l Engineer / R.C.E. Phor3e P4LP4 74//L I Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE _ A PART OF THIS PERMIT Address Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Haul routes are to be approved by City Engineer. Proposed use of grade site -'"Z> / 0J 6 - /L A I - /" 4~ - Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. Pr1d Schedule f Start Finish Operations (dates) All fills to be compacted to at least 90% of optimum density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and adin and the provisions and c dition5 any permit issued p uant to this application Under City Code Sec. 11.06 170 this grading is: D REGULAR GRADING - City inspector will make inspections listed below. Signature of ermittee D CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. Owner or authorized agent INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEARANCE - Date .-//Ik Rough- _______________________ EIA Log No.-' 'j By prior to drains Final - slàpes planted Grading permit fee $ Plan check fee $ Compaction reports rec'd OOOF . Permit Issued - -j' ) Private engr. cert. rec'd. uy '-..- L_,dle _______I Copies:- White-Office; Green-Building; Permit Expiration Date i/- L? Z.__-.- Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD