HomeMy WebLinkAboutPE 2.84.09; PIRAGUA STREET LOT 429; Engineering Application,e2W —.z 9z -
Building. Permit P Ian Chec.k.No. Orr 777-
Application'Jor Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 rim Avenue Validation by Finance
Department
7/26/848668 P56 00
~0
_ . _9 MC '
2 0 56~, 0 TL
09
PE NO.
FORAPPLICANT TO FILL IN
Si - te Address
40
Surety'Company Bond No.
Legal'Description. Map No.
L_0'r 4Zq.
Surety Address
Subdivision Name Date Filed Recd by
Owner Phone
ne E 43 3435
Cash deposit Recd by Date f iled
s -
Owner's Address
- _3
The following documents are required and shall become a part
of the grading permit when they are approved.
Grading plans Specifications
Soil report Geologic Report
'Drainagei~itructures Other
Le" Compaction report
Plans by Civil Engi nber R.C.E.
Woevicoumv Swucylu&
Address Phone
4-14P W. VfEAftlewr 515c, 14:3 —1241
Soil Engineer - R.C.E. Phone '
MV EW6r1NEMAJ&1A(j ZrAP5.
Grading Contractor Phone
ELCAMiub 611ZANIL16- 4:36-Z4ZC11
SPEtIAL.CONDITIONSWHICH-ARE MADE
A PART OF THIS PERMIT
Address
E:,l C&Milgo- Rea -(Zat ks~ Authorized hours of operation:~
7:00AM to Sunset, Monday -Friday.,
Party responsible foe overall jupervision
C0 43(o >43~5 Haul routes are to be approved by City Engineer. Proposed use of gr~acleisite..
-3. Adequate provisions shall be made for erosion and siltation
control. Nurnber~of cubic yards'
cut Fill Import Waste 4. All slopes shall be planted, per City Code.
Proposed Schedule of Stam Finish .5. All fills to be compacted to at least 90% of optimum
Operations (dates) density unless noted otherwise.
I hereby acknowledge that I have read the~appl ica'tion and, state that
the information I have provided is correct and agree to iorhply.with
all City ordinances and State laws regula.ting.pxcavating and grading,
and the provisions and conditions of any Oermit,istued pursuant to
this application.
Under City Code Sec. 11.06 170 this grading is:
0 REGULAR GRADING - City inspector will. make inspections
listed below.
b(CONTROLLED GRADING - Private grading enginee.r shall
Signature of Pe : rmittee observe work, coordinate tests, make reports.
Owner or author ~en izedlag
INSPECTION DATE INSP. SIGNATURE
Initial - site-orep.
ENVIRONMENTAL CLEARANCE -
Date Rough - prior to drains
EIA.Log No.
By Final - slopes planted
-Compaction reports rec'd.
Private engr.,cert. rec'd.
Grading permit fee $/68,~ Z —4116.— Plan check fee ~,4WX 7
Permit lj(uld
by Copies: White-Office; Green-Building;
Permit Ex rati,101:1ate -4ab(/JF- ZX7L-, Yell.ov~-Inspector,.Pink-Permittee; Goldenrod-Finance
S F EN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS.PERMIT IS VALID FOR ASIX (6) MONTH PERIOD
L~