HomeMy WebLinkAboutPE 2.84.19; MAR Y MONTANAS; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
NGINEERING DEPARTMENT
1200 Elm Avenue
438-5541
cr E31 - I C/
'T)VA9, *F_ 232-5.4
Building Pert-hit Plantheck No.
PE NO.
Validation by Finance
Department.
FOR APPLICANT TO FILL IN
Site Address Surety Company kdV. Bond. No.
CHESTNUT-AVENUE AT EL CAMINOREAL
Legal Description Map No.
LOTS 12 - 51 PHASE II) C.T. 8-1-19
Surety Address
(qi~~ %-AAV-
Subdivision Name,
MAR Y MONTANAS
Date Filed F Rec,d by 00"
Owner lA.C_j OX-0LILC~PiKI--~r Phone Gfq./ %_~sh deposit Recd by Date'filed
37-
Owner's Address 230.O.CHESTNUT-AVENUE CARLSBAD., CA.- 92008
The following documents are required and shall become a part
of the grading permit when they are approved.
000'— Grading planis"Z 001 P/~Z)'6~W.gioris 365.00
Soil report Geologic Report
170,~Drainage structures Other
Plans by Civil Engineer R.C.E.
RICK ENGINEERING COMPANY 28448 I
Add ress 365 S. RANCHO SANTA FEPhone
-744 SAN MARCOS Q'A - C) 20 6 9 41100 ompacti,on report
.Soil Engineer 204." ~ A.C.E. 23314. Phone
&AN lt1jj0-q(,_j-4
Grading Contractcir-4~~-4"-tF-~=-E6-1'4~' Phone
REA 1jK. - okl~,t!vri sel.3s Ski C,
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address
r.~ P-JOA-' tZcJ t, CA P-,Ls 6A n Authorized hours,of operation:
7:00 AM to Sunset, Monday - Frida Party res
p s
ible for overall supervision
FP_ A k Ij r. A T Haul routes are to be approved by City Engineer. Proposed use of grademsite S.It~ U
(39) RESIDENTIAL*LOTS +111,11 CONDO 10T. Adequate provisions shall be made for erosion':and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be pldnted,per City Code.
00~ 54 000 I I - -
Proposed Schedule of Start Finish
Operations (dates)
All filWto be compacted to at least 90%of optimum
density uniess,inoted otherwise.
I hereby acknowledge that I have read the application and state-that
the information I have provided, is c ec! a pd agree comply with ,t!o
all City-,ordinances and State la r atl g x va ing and-gradirig,
and the provisions and conditi ns an rm' issued pur
.
suant to
this application.
Under City Code Sec. 11.06 170 this grading is:
0 REGULAR GRADING - City inspector will make inspections
listed below.
0
NTROLLED GRADING-- Private grading engineer shall
Xbserve Signature of Permittee work, coordinate tests, make reports.
Owner or authorized agent INSPECTION DATE INSP. SIGNATURE.
Initial -,site prep.
ENVIRONMENTAL CLEARANCE -
Date "M
EIA Log No.
By
Rough - prior to drains
Final - slopes planted
Compaction reports rec'd. Grading permit fee $ —oil— Plan check fee $
Private engr. cert. rec'd. Permit Issued . -4 - — -4--- - ad7 _!!~ft -
oy Copies: White-Offide;
Yellow-'Inspector; Pink-Permittee; Goldenrod- Finance Permit Expiration Dte
AM-& TED IS A PERMIT TO DO THE WORK DE S (ME D TH IS FO RM WH EN P, R OPE R I Y V &9~ y
THISTERMIT IS.VALID FOR A SIX (6) MONTH.PERIOEL:
07+qj) g~llgj
1200 ELM AVENUE TELEPHONE CARLSBAD, CA 92008-1989 (619) 4W-Wi
Office of the City Engineer
Citp of Carl9bab
TO: BUILDING DEPARTMENT
FROM: . ENGINEERING DEPARTMENT
DATE: 12- =1 -PIZ
ROUGH GRADING APPROVAL FOR PROJECT NO. e7- ,7
(TRACT or P.E. #)
AVAIZ ~— efAr MVC-A 7—
(PROJECT NAME AND ADDRESS)
&.6 Z ar, Al"MAIA&_ Ine ~f A~26.ez mlawA 1 60-
(DEVELOPER'S NAME AND ADDRESS)
We have inspected the grading for lots 4- op phase
of the above mentioned project. In addition, we have received rough
grading certification from the Soils
Engineer, dated Z-2 and from g-W e,
the Supervising GradingEngineer, dated r-1 1 and are satis-
fied that the rough grading has been completed in accordance with City
standards.
Based on these certifications and our observation, we take no exception to
the issuance of a building permit for lots or—=
of project Z;~A'IZ r- AIOAlr;?*~r from a grading
standpoint. This release, however, is not intended to certify the-project
from other engineering concerns including site development, water or sewer.
availability, or final grading.
Prior to the issuance of a certificate of occupancy, we need to be Advised
so that we can verify that final grading and landscaping has been complet-
ed in accordance with the approved plans for the project.
APPROVED:
Project Grad-ing--Ffi`spieittor~ sk construc ion 'spector
cc: Developer
1200 ELM AVENUE
CARLSBAD, -CA 92006-1989
Office of the City Engineer
TELEPHONE
(619)'438-wi
Citp of Carlobab
TO: BUILDING DEPARTMENT
FROM: ENGINEERING DEPARTMENT
DATE:
ROUGH GRADINGAPPROVAL FOR PROJECT NO.
(TRACT or P.E. #)
(PROJECT NAME AND ADDRESS)
,F
(DEVELOPER'S NAME AND ADDRESS)
We have inspected'the grading for lots lr or phase
of the above mentioned project. In,addition, we have received rough
grading certification from the Soils
Engineer, dated and from
the Supervising Gra6ng Engineer, dated.V,117 and are satis-
fied that the rough grad.ing.has been-completed in accordance with City
standards.
Based on these certifications and our observation, we take no exception to
the issuance of a building permit for lots 1Z z,1_70, or phase
of project A, #le ~Alr~qW&C from a grading
standpoint.- This release, however, is not intended to certify the project
from other engineering concerns including site development, water or-sewer
availability,,or final gradi:ng..
Prior to the issuance of a-certificate of occupancy, we need tobe advised
so that we can v I erify that final grading and landscaping has been complet-
ed in accordance with the-approved plans for the project.
APPROVED:
A,1 A-1AZ7
,Wrojeqt Grading Inspector /~"Sr. P(ns'truction Aspector
cc- Developer