Loading...
HomeMy WebLinkAboutPE 2.84.26; LA COSTA MEADOWS UNIT 4 LOT 691; Engineering Application' 24 - Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438.5541 •• PE NO. 2.84 z 7I2Li/HLtRL,fl nnr, 0j ~q,VAhaqion~~'.1W,rf1hce ~JTOWO L Department Building Permit Plan Check No FOR APPLICANT TO FILL IN Site Address O4c./;..c c/>-c)/ Surety Company Bond No. Legal Description Map No. Surety Address /fletd Z7 Date Filed Rec'd by Subdivision 'Name " Gs6 /9?'etL4tL? i ______/r ___________________ Owner Phone Cash deposit Rec'd by Date filed I,, i4 6 --1,-1— 43 $ Owner's Address The following documents are required and shall become a part 405i -Aér-e/ 92006 ___________________________________________________ of theArading permit when they ar roved. p , Plans by Civil Engineer R.C.E. ,7,r•o /25/#7e'/7iøi j Z.1 OtlO '''Grading plans Specifications _ Soil report Geologic Report V/, __"Drainage structures ______ Other Address Phone"74.4 37ihj 9?o L Li/h C " Compaction report Soil Engineer R.C.E. Phone &'4z 47-/so I ___________________________ Grading Contractor Phone 7 mc. CUJC/Sd-.V--. ..jC4p&i SPECIAL CONDITIONS WHICH ARE MADE ,4J y ,1. A PART OF THIS PERMIT Address Z,i-.A -c.. 84. Authorized hours of operation: 7:00 AM to Sunset, Monday- Friday. Party responsible for overall supervision cLIf Haul routes are to be approved by City Engineer. Proposed use of grade site 1 A' Numbei"of cubic yards / Cut Fill Import Waste oco =.90-6 Proposed. Schedule of Start Finish Operations (dates) 73 o -'R Cf I hereby acknowledge that I have read the application and state that the information I have provided Is correct and agree to comply with Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per City Code. All fills to be compacted to at least 90% of optimum density unless noted otherwise. all .ity orainances and btate laws reguieting excavating and gracing, Under City Code Sec. 11.06 170 this grading Is: and the provisions and conditions of any permit Issued pursuant to REGULAR GRADING - City Inspector will make Inspections ted below. this application, L'CONTROLLED GRADING . Private grading engineer shall Signature of Permittee observework, coordinate tests, make reports. ________________________________________ INSPECTION DATE INSP. SIGNATURE Owner or authorized ogen ' Initial . site prep. ENVIRONMENTAL CLEARANCE ' Date 7 /. j/' Rough . prior to drains EIA Log No, ___ ____________________ Final . slopes planted Grading permit fee $ Plan check fee $ 20 Compaction reports rec'd. Permit Issu by Ct' I ii LY ' Private engr. cert. rec'd. Date 1 Copies: White-Office; Green-Building; Permit Expiration Date I Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD