HomeMy WebLinkAboutPE 2.84.36; LA COSTA VALE UNIT 3 LOT 432; Engineering ApplicationApplication for Grading Permit
D,*'6. ,44. 242'' CITY OF CARLSBAD
ENGINEERING DEPARTMENT;
1200 Elm Avenue
438-5541
Building Permit Plan Check No
PE NO. ______
Validation by Finance
79 apt 4e)b9 90,00 mo
OR APPI I(ANT TO PII I IN
Site Address
JZ/u
Surety Company Bond No.
Legal Description Map No.
7 4/6'S Z4 sQ Ig 3 7!sZ)
Surety Address
Subdivision Name Date Filed /Recdbv
Owner Phone
f 2 - o4'6
Cash deposit Rec'd by Date filed
$
Owner's Address
231/ 4V6.4 W,4Y /.4,
The following documents are required and shall become a part
of the grading permit when they are approved.
Grading plans Specifications
iV Soil report Geologic Report
"Drainage structures ______ Other
Compaction report
Plans by Civil Engineer R.C.E.
t
Address Phone 4''37'
" ''J
Soil Engineer R.C.E. Phone
Qz 4'O ,a .,v 2,R'f
Phone r ctor GdrnfonJ
3f?-' 40 Aj
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address
CA_1.
________________________________
Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Haul routes are to be approved by City Engineer.
Proposed use of grade site
Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be planted per City Code. //9c' I'800 I I
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) 9'/ ,,z xiiy 9c.'
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any pe it issued pursuant to
this application.
Signature of Permittee ___________________________________________
Owner or authorized agent
U(2
-- Under City Code Sec. 11.06 170 this grading'is:
LI REGULAR GRADING - City inspector will make inspections
j.sted below.
CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial . site prep.
ENVIRONMENTAL CLEARANCE
-
EIA Log No. 6'i4 9/7
By t2-71 cf
Date _______________________
Rough . prior to drains
Final . slopes planted
Compaction reports rec'd. - Grading permit fee $ Plan check fee
Private engr. cert. rec'd. . Permit Issued f) /
by (..-.' (.-'( fr7 Oat; 1 " - ' Copies: White-Office; Green-Building;
Permit Expiration Date 9/ c~ Yellow-Inspector; Pink-Permittee; Goldenrod-Finance,
THIS FORM WHEN PROPERLY VALIDATED ISA PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD