HomeMy WebLinkAboutPE 2.84.90; CALAVERA HILLS R.V. PARKING AND STORAGE; Engineering Application0 Application for Grading Permit 41
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438.5541
PE NO.
Validation by Finance
3b&afêi33 , a 03 371 Building Permit Plan Check No
FOR APPLICANT TO FILL IN
Site Address
74*Z 4Ø gaeT,fop e4 e.Mas i%€i
Surety Company Bond No.
,4,,4'iCAAI Z6AA'cE — 4 q q
Legal Description Map No.
/b/27/1AJ or3 c ffz4Nc1,o 4o4 110/0A/D4 0753
Surety Address
Subdivision Name rr-41rnmi 17t4c7' m,p G ,41/14L5 Lo 1—
Date Filed Rec'd by
Owner Phone
*IbUT tY- 3c-9/& Cash d posit Rec'd by Date filed
$ Nf owo i s o¼
Owner's Address
O,T6:
The following documents are required and shall become a part
ing permit when they are approved.
plans . Specifications
Kilreport Geologic Report
_,- Drainage structures ___ Other
" Compaction report
V
Ins by Civil Engineer R.C.E.ading
A ress Phone dd
,.)c"r 5i41 45
Soil Engineer R.C.E. Phone
vp1&2./ C-. 11STiA/ 3(cO7 280 432I
GradinContractor c- Phone
& /O/f7f1 .
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address
______ tivn-14~bnt -W z~/. _0 P`7 ______
Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
5CAIE Haul routes are to be approved by City Engineer. Proposed use of grade site
1/6-14'/CL Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
COMO Cut Fill Import Waste All slopes shall be planted per City Code.
/97ôO /87w "
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) i~/,$ ._..4zY 7/
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
-
V
all ity oroinances and atate laws regulating excavating and graulny, Under City Code Sec. 11.06 170 this grading is:
and the provisions and conditions of any permit issued pursuant to E REGJJLAR GRADING - City inspector will make inspections
this application. li.std below.
ONTROLLED GRADING - Private grading engineer shall
Signature of Permittee /(1..0 observe work, coordinate tests, make reports.
Owner or authorized agent PIO INSPECTION DATE I INSP SIGNATURE
Initial - site prep.
_______________________
_________
,j21
Date _______________________
ENVIRONMENTAL CLEARANCE
-
Rough - prior to drains 3-13 5'
EIA Log No. ___________ Final- slopes planted
v 06
By
Grading permit fee $ '7n Q_2... Plan check fee $ Compaction reports rec'd.
by
Perm /Expi ration
Private engr. cert. rec'd. V
— Date Copies: White-Office; Green-Building; 86.
I 6 il et
Yellow-Inspector; Pink-Permittee; Goldenrod-FinanQe t,
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD