HomeMy WebLinkAboutPE 2.85.08; RISING GLEN; Engineering ApplicationApplication for Grading Permit PE NO.
6.5 08
CITY OF CARLSBAD
ENGINEERING DEPARTMENT Ls4'f. 4'° 25:4'. 24 1200 Elm Avenue
Validation by Finance 438-5541 Department
M Building Permit Plan Check No 67Ot?63965 905 O0
70f/6 05 0 TL
C
FOR APPLICANT TO FILL IN
Site AddressWest side of El Camino Real Surety Company Bond No.
Just northerly and southerly of Elm Avenue Iii'S. c r-
Legal Description Portion Lot J Map No. 823 1 Surety Address
Rancho _Agua_Hedionda
Subdivision Name Date Filed Rec'd by
Rising _Glen _CI_83-20
Owner Multitech Properties Inc. Phone 455-1900 Cash deposit Rec'd by Date filed
$
Owner's Address 5820 Miramar Road Suite 200 The following documents are required and shall become a part
San Diego, CA 92121 of the grading permit when they are approved.
L/' Grading plans Specifications
Soil report Geologic Report
'-" Drainage structures _____ Other
" Compaction report
Plans by Civil Engineer R.C.E.
HCH & Associates 26433
Address 4877 Viewridge Avenue Phone 278-5750
San Diego, CA 92123
Soil Engineer R.C.E. Phone
Geocon_ Inc, _20427_695-2RRO
Grading Con tractLw Phone
Al EjL,. 4pt j ZZ42W
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address /IE/Z4 t4jUó4Eo ?Z2z Z1 Z4
Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Haul routes are to be approved by City Engineer. Mult itech Properties Inc. Proposed use of gradesite 73 DU single family Residence,
Adequate provisions shall be made for erosio'h and siltation
control.
1 lot not site, 1 open space lot. Number of cubic yards
Cut Fill Import Waste
All slopes shall be planted per City Code.
404,743 404,743 0 0
Proposed Schedule of Start Finish
Operations (dates) June 1985 December 1985
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances drid State laws regulating excavating and grading,
and the provisions and con itions of any permi is pursuant to Under City Code Sec. 11.06 170 this grading is:
D REGULAR GRADING - City inspector will make inspections
this application.
Signature of ,
listed below.
CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
Owner or authorized agent INSPECTION PA7E INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARANCE
- Date __ I7_____/if(.
EIA Log No.
By ___________________
Rough - prior to drains
Final - slopes planted
UH
Compaction reports rec'd. Grading permit fee $ Plan check fee $
Private engr. cert. rec'd. Permit Issued Permit Issued J by 1ltI9%blII uFdc'& hate C' Copies: White-Office; Green-Building;
Permit Expiration Date —/--A 7 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD