HomeMy WebLinkAboutPE 2.85.22; PALISADES; Engineering Application£P
1lS4W.Nc.'. .2S-7-1,4 Application for Grading Permit 0
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438.5541
Building Permit Plan Check No.
PE NO.2.5IZZ
Validation by Finance
Department
7/'12 /85674 5 22,000 tic
FOR APPLICANT TO FILL IN
Site Address i62 C,'av,P"-' hE Surety Company Csi-i T15- POS IT_.rm _10744-
Legal De ,cpion Map No
Lo-r ,TLO< .L 1747
Surety Address
Subdiijon Name
VA SA VIES
Date Filed Rec'd by
Owner hone
. tiALL (7)s73777c Ca Rec'd by Date filed ,dob.b Ai 78
Owner's Address 2l5 Co yE S'r, A/EI4.1Pt)Q'T 1.EI4C M The following documents are r'quired and shall become a part
of the arading permit when they are approved.
"Grading plans Specifications
V" Soil report Geologic Report
Drainage structures ______ Other
" Compaction report
Pjans by Civil Engineer R.C.E.
Jv c.& N H A LL 9 7(05-
Address Phone
Soil Engineer R.C.E. Phone
Grading Contractor Phone
Mc 'L 729 SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address
3 V /ZLS t3 3PO ROE ci CA Authorized hours of operation:
7:00 AM to Sunset, Monday. Friday.
Party responsible for overall supervisin
Haul routes are to be approved by City Engineer. Pr000sed use of grade site
P F . PCP Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be planted per City Code.
Zo /06_1 o-5 T ol-
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) 15 ji.,V i9S. SErf 995
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and °
this application.
Signature of Permite-4
Owner or authorized agent
-
Under City Code Sec. 11.06 170 this grading is:
Li REGULAR GRADING - City inspector will make inspections
listed below.
Li CONTROLLED GRADING - Private grading engineer: shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
Af ENVIRONMENTAL CLEARANCE
- 7/ f2/ Date _______________________
EIA Log No. -75
By
Rough - prior to drains
Final - slopes planted
Compaction reports rec'd. Grading permit fee $ 7?. Plan check fee $ Z.OrO L4II-1-IIdf-'
Private engr. cert. rec'd. Permit Issued - - ____.., - • 1 .
by ___________________
4V 3 __________ 7 Date 'a--' ' Copies: White-Office; Gr'een-Building;
Permit Expiration Date f? Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD