Loading...
HomeMy WebLinkAboutPE 2.87.56; AIRPORT BUSINESS CENTER LOT 20; Engineering ApplicationBuilding Permit Plan Check No. Application for Grading Permit CITY OF CA RLSIBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3550 PE NO. 2-87-56 Validation by Finance Department 05/12 0101 05Misc. L'10.00 FOR APPLICANT TO FILL IN Site Address Surety Company Bond No. DRYDEN PLACE ze!% Cor 0 7 V-0 3A -5-,VR Legal Description Map No. Surety Address LOT 20 11287 -7/75 AVvj1 j& X0, 9 Subdivision Name Date Filed Rec'd by /4"V.2 AIRPORT BUSINESS CENTER, CT 81-46 -5--/ nl!~ 9 /P, 6" Owner Phone Cash deposit Rec'd by Date filed M.I.I. PARTNERS 931-8747 $5,360 94 (a - Owner's Address The following documents are required and shall become a part P.O. BOX 9000-266 CARLSBAD, CA of the grading permit when they are approved, Grading plans _J~~Specifications Plans by Civil Engineer R.C.E. 01DAY CONSULTANTS PAT O'DAY Soil report Geologic Report Address Phone 775n-9H EI CAMINO RFAI 944-1010 Drainage structures Other Compaction report Soil Engineer R.C.E. Phone JM00RE & TABER D. CAMPBELL (619) 779-2591 Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE N/A A PART OF THIS PERMIT Address 1 . Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Haul routes are to be approved . by City Engineer. N/A Proposed use of grade site INDUSTRIAL Adequate provisions shall be made for erosion and siltation Number of cubic yards control. Cut Fill Import Waste All slopes shall be planted per City Code. 14,000 1 14,000 0 0 Proposed Schedule of nish A All fills to be compacted to at least 90% of optimum Operations (dates) N density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued puLsuant to Under City Code Sec. 11.06 170 this grading is: 0 REGULAR GRADING - City inspector will make inspections this application. listed below. P150-NTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports. Owner or authorized ~/ent INSPECTION DATE INSP. SIGNATURE Initial - site prep. 10 ENVIRONMENTAL CLEAI~/NCE - Rough - prior to drains 4 ~/o 7/ - Date -in oce EIA Log No. P/P 67=-4, - - By Final - slopes planted 7 Grading permit fee $ Plan check fee' $ Compaction reports rec'd. Permit Issued Private engr. cert. rec'd. -7/1 by A2:A ~~4 Lv(_~ Date J' -/4;;t -049 — Copies: White-Office; Green-Building; Al tl Permit. Expiration Date Yellow-inspector; Pink-Permittee; Goldenrod- Finance THIS FO.RM WHEN PROPERLY VALIDATED ISAPERMITTO DO THEWORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD 2075 LAS PALMAS DRIVE TELEPHONE CARLSBAD, CALIFORNIA 92009-4859 (619) 438-1161 Office of the City Engineer TitV of Tartsbab TO'~-.~QEY~R& ~NT ~PROCES~SING ~SERVI~CES FROM: ENGINEERING DEPARTMENT - 1.9 DATE: J44 ROUGH GRADING APPROVAL FOR PROJECT NO.)?~, Z.-V =.g T o da. 2 44 '0, r P.E. #) (TRAC )CKI (PROACT RANE AND _AODRESS) R4 Vf41.f_,r$ _1000-2_,44 'AND ADDRESS) %.,or (ITEVELOPER'S NAME We have inspected the.grading for lots '20 eic i~^rlfl-44 or phase of the above menti.oned project. In addition, we have received rough grading certification from -S7,!:*0e4& the Soils Engineer, dated Awmno and from Aw:j!t e /)&M the Supervision Grading Engineer, dated 'J i4t 1!1 and are satisfied that the rough grading has been completed in accordance with City standards. Based on these certifications and our observation, we take no -exception to the issuance of a building permit for lots 2VyiC i7W-4110or phase of project 17, 97, 2 .197, &—A from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including _. site development, water or seWer availability, or final grading. Prior to the issuance of a certificate of occupancy, we need to be advised so that we can verify that final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVED: I ;UAC~ wr Z11 Project Grading Inspector Az Project Engineer c: Developer onstruction Inspector [Ulf, I ~ " ,