HomeMy WebLinkAboutPE 2.88.46; COSTA REAL MUNICIPAL WATER DISTRICT; Engineering ApplicationBuilding Permit Plan Check No
0 Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438454t-
I
RE, NO-Z7863 -Itc
PP_ V
Validation by Finance
Department
7338 06/02/89 0001 01 05
FOR APPLICANT TO FILL IN
Site Address Surety Company Bond No.
5950 El Camino Real, Carlsbad 92008 A11A
Legal Description Map No. Suret~ Address
A.P.N. 209-050-J-9 per R.O.S. 7845 1
Subdivision Name Date Filed Rec'd by
Site Development for Costa Real Mun. W.Di~
Owner Phone
.
L.
Cash deposit Rec'd by Date filed
Costa Real Mun. W. District 619-438-2722 ~.$
Owner's Address The following documents are required and shall become a part
5950 El Camino Real, Carlsbad 92008 of the grading permit when they are approved.
I'- Grading plans Specifications
Soil report Geologic Report
Drainage structures Other
Compaction report
Plans by Civil Engineer, R.C.E.
VTN SOUTHWFST, 1NC. 23600
Address Phone
545i Avenida Encinas #A 619-931--1022 ā
Soil Engineer R.C.E. Phone
Western Soil & Found. 26676 619-746-3553
Grading Contractor Phon SPECIAL CONDITIONS WHICH ARE MADE
TL:e ±E 67_r~~n, rc~-, ((,0 1!~~ 9-R Do A PART OF THIS PERMIT
Address
092-S; 04_,,,~ a 2J23
1 Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Haul routes are to be approved by City Engineer., Krommehhoek/McKeown &-Associates
Proposed use of grade site
Site Development for one perm. structure. Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be planted per City Code.
9500C 4. 3500c4- 9 1 0
Proposed Schedule of Start Finish All f ills to be compacted to at least 90% of optimum
Operations (dates) density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and St t I s regulating exca and grading,
and the provisions and c so any perm pursuant to
this application.
Signature of Permittee
Under City Code Sec. 11.06 170 this grading is:
0 REGULAR GRADING - City inspector will make inspections
I' ted below.
2-81SOINTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
Owner or authorized agent t 31A A A - d
I -C 4L1!fA W~
INSPECTION DATE INSP. SIGNATURE
/_ Initial - site prep.
ENVIRONMENTAL CLEARANCE -
15~6 - P Ire- 4-4-1Z Date
EIA Log No.15_2,~?
By
Rough - prior to drains
Final - slopes planted
Compaction reports rec'd. Grading permit fee $ ,7 an Qq)h fe5e _~:o P19) - "Ito, 4
Per sued -7
M Private engr. cert. rec'd.
uy uaie (,p e-, Lj 11 1 Copies: White-Office; Green-Building;
Permit Expiration Date f & /a Yellow-inspector; Pink-Permittee; Goldenrod- F i nance
THIS FORMWHEN P~ROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
TELEPHONE N75 LAS PALMAS DRIVE
(619)438-1161 CARLSBAD, CALIFORNIA 92009-4859
Office of the City Engineer
Titg of ilartsbab
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
DATE: AA A,& /jog
ROUGH GRADING APPROVAL FOR PROJECT, NO. Pe, 2, 9946
(P. E. or TRACT #)
5'6 P Z ~A a (Project Namt- dress)
(Developer's, Na and Address)
We have inspected the grading for Lots 91,1-o Cā_ I 6e, veqmc. lor Phase
-received rough grading -of the above mentioned project. 'in addition, we have
certification from 1114 V*4_0'Y- Kola I-, the Soils Engineer,
dated Z lqgq and from tAp y-, VA A L4
the- Supervision Grading Engineer, dated-_)(Am_a 2- 9, 1999 , and are satisfied
that the rough grading has been completed in accordance with City Standards.
Based on these certifications and our observation, "we take no exception to the
issuance of a building -permit for Lots or Phase of
project t-,. o2~z; C LQ,&; grading f rom a
standpoint. This- release, howeve.r,, is not intended to certify. the project from
other engineering concerns including site development, water or sewer availa-
bility,' or final grading.
.We will need to be advised prior to .the issuance of a Certificate of Occupancy
so that we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project.
APPROVED:
Project 6rading Inspector Vsr. -Construction Inspector