Loading...
HomeMy WebLinkAboutPE 2.89.02; MAR POINT; Engineering ApplicationI tD12 ku)i, Application for Grading Permit t . CITY OF CARLSBAD ENGINEERING DEPARTMENT PE NO. — 2. 89. 02 12Q0 Elm Avenue 438-5541 Validafion by Finance Department Building Permit Plan Check No. 4928 04/19/90 0001 01 ~ 05 'Misc 1.330-00 FOR APPLICANT TO FILL IN Site Address Bond No. CoLl"J>,4 IDEMNIT CO. OP CA. C)9-XI IS' Legal Description Map No. Surety Address Lot 1, CT 81-19 11595 _1~333 WIL21-11RE AVE ANAPF-101,cog 92160i Subdivision Name Date Filed Rec'd by Mar Y Montanas (Mar'Point) W MAP- C)O Owner Phone Cash deposit 41@e.41 by Date filed Mar Point Limite,d Partnership 4454~-3002 $ 39) COO. 9-109--s 2-22 M,91ZCJO Owner's Address The following documents aire required and shall become a part 2223 Avehida de la Playa, La Jolla CA of the grading permit when they are approved. 2~ Grading plans Specifications Plans by Civil Engineer R.C.E. Rick Enaineering Company 28448 Soil report Geologic Re0ort Address Phone #744-4 8 00 365 S. Rancho Santa Fe Rd. San Marcns,CA Drainage structures Other Compaction report Soil.Engineer R.C.E. Phone California Gec~ Tek OOS69 9676-27R2 Contractor ?Gr Phone .pding SPECIAL CONDITIONS WHICH ARE MADE 7J/14 %12611( &eAL,A~Ale, s .4z> s-x- A PART OF THIS PERMIT Address A?- &POeIAJ,6 eA 1107 Authorized hours of operation: F 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Haul routes are to be approved by City Engineer. Pnh e-r - Proposed use of grade site 30 Unit Subd1vizi.on. Adequate provisions s hall be made for erosion and siltation Number of cubic yards control. Cut Fill Import Waste All slopes shall be planted per City Code. 12, 0 00 I 1 12, 0 0 0' Proposed Schedule of Start Fini;h All f ills to be compacted to at least 90% of optimum Operations (dates) density unless noted otherwise. ['hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulatingexcavating and grading, . . Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of an d T~permit issue pAursuant to MAR PON LIMITED RTNERSHIP 0 REGULAR GRADING - City inspector will "Make inspections this application. by:* jRT Development Corp., A Texas listed below.- Corp.. as General Partner )kCONTROLLED GRADING - Private grading engineer shall ,Signature of Permittee - observe work, coordinate tests, make reports. Owner or authorized agent President and INSPECTION DATE INSP. SIGNATURE - site prep. ..Initial )ecre-cary ENVIRONMENTAL CLEA'RANCE Rough - prior to drains 9 0 Date EIA Log No. Final - slopes planted 7~ 13-4h By -A Grading Permit fee Plan, check fee $ I"D- I'aa 0 Corn paction reports rec'd. /0 /C,- C) .0 Permit lssu-,4- — -~a - 4 / 10 Private engr. cert.-rec'd. IvL2-419 y UdLt; Copies: White-Office; dreen-Building; Permit Expiration Date Yellow-inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMITIS.VALID FOR A SIX (6) MONTH PERIOD 0 - 2075 LAS PALMAS DRIVE TELEPHONE -1161 CARLSBAD, CALIFORNIA 92009-4859 (619)438 Office of the City Engineer Zug of Qlartshab TO: DEVELOPMENT PROCESS ING. SERV I CES FROM: ENGINEERING. INSPECTION DIVISION DATE: 2- 2 ROUGH GRADING APPROVAL FOR PROJECT NO. 0:2- -tr..r-. or I`R7VL-r-T) too (14 -_3 b ea 4. 5 6, J (Project Name and Addressl Z-ord 9040 4q ~IvlloL S4v.,-e15 A,-, 1~_Ialla (Developer's Name and Address)' 3 7 We have inspected the grading for Loq I C__r 61~ or Phase- of the above mentioned project.. In addition, we have received rough grading certification from E Lee_-~, 64/- 6eo the Soils Engineer, dated 5ee..17, _qo, and' from the, Supervision Grading Engineer, dated 41,t2g, ZYYd , and are satisfied that the rough grading has been completed, in accordance with City Standards. Based on these. certifications and our observation, we take, no exception to the issuance of a building permit for Lot,# or Phase of project C-~, ~9,9. from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including site development, water or sewer availa- biliiy, or final grading. We,.will need to be advised prio,r to the issuance of a Certificate of Occupancy so that we can verify that final grading and landscaping has been completed in accordance with the approved plans 'for the project. APPROVED: Project Grading Inspector r. Construction Inspector.