HomeMy WebLinkAboutPE 2.89.03; PALOMAR OAKS; Engineering ApplicationApplication for Grading Permit P E N 0. /A . . .;,
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
2075 Las Palmas Drive
438-3550 Validation by Finance
8343 91ePa9tMbSPt000j 01 0.5
Building Permit Plan Check No. Misc 209.00
FOR APPLICANT TO FILL IN
Site Address Surety Company Bond No.
PASEO DEL LAGO, CARLSBAD, CAL. _Z~~s. eo, o-1 746 e ale.5-1 114 6_1a A9 Legal Description Map No. Surety Address
LOTS 17,18 & 19 C.T. 80-38 10198
Subdivision Name Date Filed Rec'd by
PALOMAR OAKS 7 /ZJ /? 9 d?, a Owner Phone Cash 'dep(fsit Rec'd by Date filed
MADISON SQUARE DEVELOPMENT-11 (61g) 56o-7622 $A7 go, -7 t9 Al al ~7116P 49
Owner's Address The fo/llowing documents are required and shall t~ecome' a part
4223 PONDEROSA AVE. SAN DIEGO, CAL. 92123 of the grading permit when they are appr6ved.
Plans by Civil Engineer R.C.E.
HENRY WORLFY ASSOCIATES, INC. 18673 rading plans Specifications
Soil report Geologic Report
Drainage structures Other
Address Phone
7875 CONVOY CT. SAN DIEGO, CA. (619) 571-7728
Compaction report Soil Engineer R.C.E. Phone
SO. CAL. SOIL & TESTING GE 00215 (619)280-4321
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE MADISON SQUARE 560-7622 A PART OF THIS PERMIT
Address
4223 PONDEROSA AVE. SAN DIEGO, CAL. 92123 1 Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision
Haul routes are to be approved by City Engineer.
DENNIS TRENNELL
Proposed use of grade site
INDUSTRIAL BUILDINGS
Adequate provisions shall be made for e~rosion and siltation Number of cubic yards
control.
Cut 3568 Fill 3568 Import Waste All slopes shall be planted per City Code.
Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum
Operations (dates) FEB. 89 MAY 89 density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is:
[__1 REGULAR GRADING - City inspector will make inspections this application. lipted below.
Signature of Permittee ga-C'ONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
Owner or authorized agent G74 T INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARANCE -
Rough - prior to drains Date qj
E I A Log No.
By Final - slopes planted .6,1511,00 at
Grading permit fee $ 9, &70 Plan check fee $ Compaction reports rec'd. at
Permit Is Private engr. cert. rec'd.
-7 by Date j/ 6/,9-2 —Z Copies: White-Office; Green-Building; 118 Permit Expiration Date JI Yellow-Inspector; Pink-Permittee; Goldenrod- Finance
THIS FO.RM WHEN PROPERLY VALIDATED IS APERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VA(ID FOR A SIX (6) MONTH PERIOD
11
TELEPHONE -2075 LAS PALMAS DRIVE
(619)438-1-161 CARLSBAD, CALIFORNIA 92009-4859
-"office'of -the City Engineer
of Tartsbab
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING. INSPECTION DIVISION
DATE: '25
ROUGH GRADING APPROVAL FOR PROJECT NO. ;?,9" 0,3 -
(P.E. or TRACT #)
Wa 1-11 (ProjectAame and Address) 414
"
#a -d' Z), 1044' izz(A'_ 1-iDeal; ..4R-2-3 4ye. 15A, Al'&'o Q. .02-1. )3 (Devdloper's Name and Address),
We have inspected the grading for Lots 17 lif 4~ IS' or Phase
of the above mentioned project. In -addition, -we'have received rough grading
certificatio'h f rom 174 K Ie. 5 7L;,7.4 the, Soils Engineer;
dated and from
2 th e Superivision Grading Engineer_ dated Ava. 2*, 15189 and are satisfied
that the/rough grading has been completed in accordanc~ with City Standards.
'Based on these certifications and our observation, We take no exception to the
issuance of a building permit for Lots 1-7 or Phase Of'
project _ -14745~ '23 from a grading
~tafidpoint_ This release, however, is not intended to. certify the project from
other engineering con cerns- includiln,g site development, water or sewer,availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that .we can verify that f inia I grading and landscaping . has, been completed
i n accordance with the approved plans for the project.
APPROVED:.,
Sr. Construction Inspector Project'Grading Inspector
C I T Y OFf CARLSBAD'
R A D I WG INSPECTION',CHECKLIST~
'FOR PA'RTIA.L S IT~ E RELEASE
PROJECT'- INSPECTOR: A 61 dwl,a DAT6 A &t!& 9 PROJECT ID: a' i.5,o -i S GRADING PERMIT NO.: P_ LOTS REQUESTED'FOR RELEASE:,
74-
Not .Applicable~
Complete
0 Incomplete or unaccep,t able,
let. 2rid.
1.:1 Site access to requested lots adequate and logically grouped
V/ Site erosion control,measures adequate
3.' Overall site adequate for health, safety and
.-welfare of, pub-lic
Letter of request for partial release submitted
.8--1/211 X 1111 site pla6 showing requested 0 ts'submitted.
'Compaction report from soils engineer submitted
Engineer-of-worik certification of work done and-pad elevations
8.' Geologic ~ngineer's letter -if unusual geologic orsubsurface.' conditions,exist
"V"' 9.. Project conditions of "ap'proval.che'6ked for conflicts
Canwater service be installed prior to bringing bui Iding
combustibles on site*!
Partial release of grading for the above stated lots is approv
e
d
.
for' the-purpose of .building permit issua6ce. Issuance of building permits is still iubjeft, to al I normal City'r'equirements required pursuant to the building.'permit process.
Partial release of the site,is denied for the following~reasons:
PROJECT'INSKCTOR DATE PROJECT ENGINEER DATE
SENIOR- INSPECTOR , DATE
Or
Ira,
e4o
C - t - I .. C>
qo 3
8116 fIgN
If ellcav
NO