HomeMy WebLinkAboutPE 2.89.21; CARLSBAD RESEARCH CENTER UNIT 4; Engineering Application
S . PE NO. 2.8.2t.
Validation by Finance
Department
3072 02/02/90 0001 01 05
trj if'ir
Building Permit Plan Check No
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
2075 Las Palmas Drive
438-3550
FOR APPLICANT TO FILL IN
Site Address
5935 Darwin Court Carlsbad, CA 92008
Surety Company Bond No.
'• IWE 77 Legal Description Map No. Surety Address
Lot 57 11811 f1 TO, M)OorllL4.5 Ck &1134 Subdivision Name Date Filed
Carlsbad Research Center Unit 4 1_.3.O_to Owner D1 Carlsbad #1 Ltd Pshp. Phone Cash deoosit R'd by Date filed
C/O Trammell Crow Company 619/438-8824,or 230-16 .0 210
Owner's Address The foIlci'ing documents arejrequired and shall b1ecome a part
5962 La place Ct., # iF Carlsbad, CA 92008 of the wading permit when they are approved.
Plans by Civil Engineer R.C.E.
Glen K. Van Peski 41204 ding plans __..—Specifications
_L,..Soil report Geologic Report Address San Marcos, CA 92069 Phone
970 Los Vallecitos Blvd. #202 619/744-3300 nage
Compaction report
structures ____ Other
g Soil Engineer R.C.E. Phone
John Mossazadeh GE 617 619/294-9400
Grading Contractor Phone
Snyder Langston BuiJers 619/2327332 SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address 701 I8h1 Street 5th floor San Diego, CA 92101 Authorized hours of operation:
7:00 AM to Sunset, Monday- Friday. Party responsible for overall supervision
Ware and Mal rnmh Arrhi ferts Haul routes are to be approved by City Engineer. Proposed use of grade te
Irirnune Response Center
Adequate provisions shall be made for erosion and siltation Number of cubic yards control.
Cut Fill Import Waste
All slopes shall be planted per City Code.
7,500 1,500 0 6,000
Proposed Schedule of Start 1ih All fills to be compacted to at least 90% of optimum
Operations (dates) $ c r/tb/''O ,/Io/?d' density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is:
L REGULAR GRADING - City inspector will make inspections this application. li5t(below. a LkONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports.
Owner or authorized a INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARAI4E - to / 7 Date Rough - prior to drains
EIA Log No.
By
Final - slopes planted
Grading permit fee ~,Vpan check fee $ Compaction reports rec'd. 41
Permit Iss
u
e
-
Private engr. cert. rec'd.
/
Copies: White-Office; Green-Building; Uy
Permit Expiration Date /
Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED ISA PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
. I 2075 LAS PALMAS DRIVE . . . . .. TELEPHONE
CARLSAD, CALIFORNIA 92009-4859 (619) 438-1161
Office of the City Engineer
(!Itt of (ar1tiaö
TO DEVELOPMENT PROCESSING SERVICt
FROM ENGINEERING INSPECTION DIVISION
DATE
ROUGH GRADING APPROVAL FOR PROJECT NO. •• '- 0Lj' -
'• • . P. E. or TRACT #)
7
. (Project Name 'and Address) .
, 3 -- . (Developer's Name and Address) . .
We have inspected the grading for Lots . _ç 7 . •.• or Phase
of the above mentioned project In addition, we have received rough grading
certification from AI'o. • , the Soils Engineer,
dated ..- /-9d , and from tLtxJ /& . ••
the Supervision Grading, Engineer, dated 3—ç—,' , and are satisfied •
that the. rough grading. has.been completed in accordance with City Standards.
Based on these certifications and our observation we take no exception to the
issuance of a building permit for Lots • • or Phase , of
project • é • • • • from a grading
standpoint. This release; however, is not intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading. .• • . • • . •.• 0
We will need to be advised prior to the issuance of a Certificate of Occupancy .
so that we can verify that final grading and landscaping has been completed .
in accordance with, the approved plans for the project. . : •
APPROVED: 0
•0• • • • ...
0 •• 0
oect Grading Inspector
0
/S r. Construction Inspector 0