HomeMy WebLinkAboutPE 2.89.22; BIANCHI RESIDENCE; Engineering ApplicationV ..
Building Per t P1 n heck No
- f'P4-gJ
Application for Grading Permit PE
CITY OF CARLSBAD ,01 - ENGINEERING DEPARTMENT
- 2075 Las Palmas Drive• Validation by Finance 438-3550
. 040( 1et,tjjert001 01 05
- '
.
i11SC 276-00
FOR APPLICANTTO FILL IN -
Site Addr:ss U 30'
cfi4c' e
L 11 Description ety
1S 31 No.
_
Map Address
Lc IL Oo49 ________________________ Subdivision Name Date Filed
70
Rec'd 6y
Own 43 T11
glje Cash sit ' Date
Owner's Addre
- C'4II) L (4
The folliwing documents are
of the ading permit when they
L"1,'ading plans _JZ2~l report
ainage structures
--4Z Compaction report
required and shall Ifecome a part
are approved.
Specifications
Geologic Report
Other
PlasbCivil Engineer
. ..
R.C.E.
< I.)
' Address Phone
S il Engineer R.C.E. Phone
Gradn Contractor
LJAr.-..ri'z. 'ri3,. )c'73_/4!2Q
Phone " SPECIAL CONDITIONS
A PART
WHICH ARE MADE
OF THIS PERMIT
Adjess t* , 1. Authorized hours of operation:
7:00 AM to Sunset, Monday- Friday.
Party respoibIe for overall supervision
2.• Haul routes are to be approved by City Engineer. Proposed use of grade site
S i * 1 " (
. Adequate provisions shall
control.
be made for erosion and siltation Number of cubic yards
Cut Fill Import Waste
All slopes shall be planted per City Code.
0 —
Proposed Schedule of
Operations (dates)
Start
j)j,,f-. f,4f
Finish
1 b.J{'/;
All fills to be compacted
density unless noted otherwise
to at least 90% of optimum
I hereby acknowledge that !
the information I have provided
all City ordinances and State
and the provisions and conditions
this application.
Signature of Permittee •
Owner or authorized agent
cr
have read the application
is correct and agree
laws rejuiating excavating
of any permit
A
'L
to comply with
and grading,
issued pursuant to
and state that
.
Under City Code
U REGULAR GRADING - City
)isted below -.
[CONTROLLED GRADING
I observe work coordinate
Sec. 11.06 170 this grading is:
inspector will make inspections
-
- Private grading engineer shall
tests make reports
INSPECTION DATE jNP. 4GN/)JRE
Initial site prep '9 La- ENVIRONMENTALCLEARANCE
EIA Log No.. -
-
Date
By
7
-
Rough- prior to drains
Final - slopes planted
Grading permit fee $ Plan check fee $ -
Compaction reports rec'd.
- A Permit
by I/VVI
fd .
Date
. iô/c/• -
Private engr. cert. recd.•
-
Pink-Permittee; Goldenrod-Finance
K DESCRIBED
2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92009.4859
Office of the City Engineer
TO DEVELOPMENT PROCESSING SERVICES
FROM ENGINEERING INSPECTION DIVISION
DATE
ROUGH GRADING APPROVAL FOR PROJECT ,-NO.
(P .-E,. or TRACT #)
IP4JC Res', t ,. C€ ( ~i) 1 JA, Ca ,C Li FcRTe. s4 (- (Projct Name and Address)
\oLj 1s0 'ei gre. (Developer's Name and Address) z(.6ib CA,
We have inspected the grading for Lot 77A 75_L or Phase
of the above mentionep project In addition, we have received rough grading
certification from 3s the Soils Engineer,
dated and from
the Supervision Grading Engineer, dated I("2.ô-f , and are satisfied
that the rough grading has been completed in accordance with City Standards
Based on these certifications and our observation, we take no exception to the
issuance of a building permit for Lot/ 147 AT,75..Lf or Phase - of
project $ from a grading
standpoint This release, however, is not intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project
APPROVER
Proj t Gradir &nspector Sr Construction Inspector