Loading...
HomeMy WebLinkAboutPE 2.89.36; EL FUERTE OAKS LOT 28; Engineering ApplicationProject Engineer Initial iV14 t2(20/e9 Assessors Parcel No. 209-082-04 Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3634 w PE NO. Validation by Cashier 12/22/89 00010105 FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address 5932 Sea Otter Place Legal Description Map No. Lot 28 Trac Project Name El Fuerte Oaks Owner Phone Owner's Address 4199 Campus Drive, #830 Irvine, Ca. 92715 Plans by Civil Engineer Phone Address Soil Engineer R.C.E. Phone Peter C. Young 19282 714-647-0277 Grading Contractor Phone 619-744-31 Lusardi Construction 24 Hr. Phone Address 1520 Linda Vista Dr.,, San Marcos, Ca. 92069 Party responsible for overall supervision Jim Vann Proposed use of grade site Number of cubic yards Cut Fill Import Waste 500 4600- Proposed Schedule of Start Finish Operations (dates) I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized __________________________________ DATE INITIAL Secured Agreement Recd. /f -.zfl--57 Cash Deposit gcvJ II-20-P'/ Receipt No. 9-Thi7 Drawing No. Building Permit Plancheck No. 303-6 GeneralPermitRequirements: All grading and erosion control work shall be done in accordance with City Ordinances, Authorized hours of operation: 7:00 am. to Sunset, Monday through Friday, excluding city recognized holidays. Grading work shall not commence until after the pre-construction conference has been held with the City Inspector All off-site haul routes require separate approval by the City Engineer A right-of-way permit is required for all work done in the city right-of- way.. Special Requirements: Ipr'e,p'r ___r.,R L FtoLo,-_.7 CsiP OS ONLY Under City Code Sec. 11.06.170 this grading is: O Regular Grading - City Inspector will make inspections listed below. O Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports Inspection Date lnsp.Initial Initial - Site Prep. Rough Grade Final - Slopes Planted Compaction Reports Read ENVIRONMENTAL CLEARANCE - EIA Log No. IiEEi J(1/Ly ti,,'167 Grading permit fee $ Per by i- ~X~J~ Permit Expiration Date Date____________________ OE Private Engr. Cert. Rec'd. By _____5 O.K. For Release Plan check fee s1850.00 tcG Date Xrr Copies: White - Office; Yellow - Inspector; Pink - Permittee Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. JjJ S . * TELEPHONE 2O75 LAS PALMAS DRIVE 4'5/ (619)438-1161 CARLSBAD,CALiFOflNIA92009-4859 Office of the City Engineer (llit!j ui (1Iarhitia TO DEVELOPMENT PROCESSING SERVICtS FROM ENGINEERING INSPECTION DIVISION DATE:.9-) /7 /9c7 ROUGH GRADING APPROVAL FOR PROJECT NOS? (P.E. .or TRACT #) :. (Project. Name and Address) 24'/21L-J,L1I6 9'/ 1hy,°f eiv1L ',?j ?2 & 9 27/ (Developer's Name and Addres) .1 We have inspected the grading for Lots or Phase .of.the above mentioned project. In. addition, we have received rough grading certification from the Soils Engineer, dated Jv1:/q and from .. . the Supervision Grading Engineer, dated Jj/gaand; are satisfied that the rough grading has been completed in accordance with City Standards Based on these certifications and our observation, we take no exception to the issuance of a building permit for Lots or Phase of project 5/ 3 Z. 5f74- . 1PJ4. . from a gradihg. standpoint This release, however, is not intended to certify the project from other engineering concerns including site development, water or, sewer availa- bility, or final grading :We. will. need to be advised, prior to-.the issuance of a Certificate of Occupancy S S so that we can verify that final grading and landscaping has been. completed S in accordance with the approved plans for the project; S S S APPROVED: Sr Con Project Grading Inspector struction Inspector