Loading...
HomeMy WebLinkAboutPE 2.89.54; CARLSBAD RESEARCH CENTER LOTS 44 & 45; Engineering ApplicationW Application for Grading Permit PE NO CZ 4 CITY OF CARLSBAD ' - :ENGINEERING DEPARTMENT. -. WG N,.3o7I 4 . . . 2075 Las Palmas Drive .. - tu" . 438-3550 . Validation by Finance Department Building Permit Plan ie57 EIA) 3809 03/06/90 0001 01 - 05 -. .- FOR APPLICANT, TOFlLL IN . Site Address . . Surety Company Bond No. SU Co-OFTNLD)Es1 . iIt 99 ZL Legal Description . . Map No. Surety Address 4 loTs '/qd4'5 M,,-P..Uo, .7:B5-2-'11 Subdivision Name . Date Filed Rec'd by 4-1LhSi34-- SG4cH- tf-,Q . Owner . Phone Pz,r-w-jz,,jerr (6 //'3 c5 Cash deposit Rec'd by Dat filJ s4,.Oo!.!. .go Owner's Address - The following documents are required and shall become a part 231D 04D, C4 '2_6 9 of the grading permit when thy are approved. V., _____ Grading plans Specifications _____ Soil report Geologic Report Plans by Civil Engineer - R.C.E. *-,z ,---S . 2.-,O7 Address - Phone (li) 2.Il.iI 44o1 MCIffS.7IZ MJt-S CC -MS A- 2.02'! _,...-"Drainage structures _____ Other t_ Compaction report Soil Engineer . - R.C.E. Phone (6 /4MThEAi /-iI/A-S7 Grading Contractor . Phone CCD -' &7u ci op.-' C o 6/I - . SPECIAL CONDITIONS WHICH ARE-MADE A PART OF THIS PERMIT Address . . ' c2i-44lj i.'' £JEP 4J IEG..o, Authorized hours of operation: CA . 7:00 AM to Sunset, Monday.- Friday. . Party responsible for overall supervision . - e - Haul routes are to be approved by City Engineer. - G /%/tA *ob.JEY Propbsed use of grade site - - 12LèP,tiEA-i7 Adequate provisions shall be made for erosion and siltation - Number of cubic yards - control: Cut Fill Import -- Waste All slopes shall be planted per City Code. Proposed Scheduleof Start Finish All fills to be compacted to at least 90% of optithum Operations (dates) DecsLc 12 I, i o density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and Stafe laws regulating excavatin6 and gradin; and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is: REGULAR GRADING - City inspector will make inspections this appliction. - . . . - listed below. .CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate 'tests, make reports. - Owner or authorized agent INSPECTION DATE INSP. SIGNATURE Initial - site prep. . ENVIRONMENTAL CLEARANCE,-DEC. . - . bate Ib . - 1-2Z Rough . prior to drains EIA Log No. . B y Final -slopes planted - Cornaction reports rec'd. Grading permit fee $ 7952.. Plan check feé$ 2 2Z Permit Issued - . Private engr. cert. rec'd. Copies :White-Office; Green-Building; Permit Expiration Date ._. . Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS APERMIT TO DO THE WORK DESCRIBED - - '. THIS-PERMIT IS VALID FOR A SIX (6) MONTH PERIOD 2075 LAS PALMAS DRIVE CAALSBAD, CALIFORNIA 92009-4859 Office of the City Engineer TO: DEVELOPMENT PROCESSING SERVICES - FROM ENGINEERING INSPECTION DIVISION DATE /9c) ROUGH GRADING APPROVAL FOR PROJECT NO Z ?9- (P.E. or TRACT #) P,Z/727tJ_ (Project Name and Address) '-4,w4n /O 7/A}O L'4# Z5'A 44 9zc (Developer's Name and Address) We have inspected the grading for Lots or Phase of the above mentioned project In addition, we have received rough grading certification from 7,I46) , the Soils Engineer, dated and from the Supervision Grading Engineer, dated ' and are satisfied '.. that the rough grading has been completed in' accordance with City Standards. Based on these certifications and our observation, we take no exception to the issuance of a building permit for Lots ' 4// 9'ó ,' or' Phase ,A% of project' 11h?/7-::4) ,. .• . ' ' from' a grading standpoint This release, however, is not intended to certify the project from other, engineering concerns including site development, water or se'wer availa- bility,.or final grading We will need' to be advised prior to the'issuance of a Certificate of Occupancy so that we can verify that final grading and landscaping has been completed in accordance with the approved plans for the project. Project Grading Inspector , r. Construction Inspector '