Loading...
HomeMy WebLinkAboutPE 2.89.59; GARFIELD STREET CONDOMINIUMS; Engineering ApplicationI, Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3634 : PE NO. Prosct Engineer Initial Assessors Parcel No. 2_-bIZ.-10 Validation by Cashier FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address g110 Gt-/i DATE INITIAL A V Secured Agreement Recd. __ J.ear Description Map No. Cash Deposit Receipt I10. OZ _974.4e Project Name . Drawing No. I 2A- Building Permit Planchéck No. Owner Phone Thotaiai_Am# General Permit Requirements: 1. All grading and erosion control work shall be done in accordance with City Ordinances, Authorized hours of operation: 7:00 am. to Sunset, Monday through Friday, excluding city recognized holidays. Grading work shall not commence until after the pre-construction conference has been held with the City Inspector All off-site haul routes require separate approval by the City Engineer A right-of-way permit is required for all work done in the city right-of- way. Owner's Address _/qgo2 Plans by Civil Engineer Phork 2. () Address Phone 2tg(2.S :a-i q4 Soil Engineer R.C.E. Phone (_044 ,5c7_(C_19)43-3t55 Grading Contractor I Phone 24 Hr. Phone Special Requirements: Address Party responsible for overall supervision Proposed use of grade site c tUtti (OMJO Number of cubic yards Cut Fill Import Waste Under City Code Sec. 11.0 6.170 this grading is: 0 Regular Grading - City Inspector will make inspections listed below. 'Controlled Grading - private grading engineer shall observe work, oordinate tests and make reports Propdsed Schedule of Start Finish Operations (dates) . I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized agent /_ Inspection Date Irisp.Initial Initial - Site Prep. Rough - Grade Final - Slopes Planted Compaction Reports Read ENVIRONMENTAL CLEARANCE - ElA Log No. :y private Engr. Cert. Rec'd O.K. For Release Gradingpermitfee$ ____Plancheck Copies: - White - Office; Yellow - Inspector; Pink - Permittee Golden Rod - Finance; Green - Building A PERMIT TO DO THE WORK DESCRIBED OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. Permit Issued by Date ___________ Permit Expiration Date ._'t C _,-_0 THIS FORM WHEN PROPERLY VALIDATED IS THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD I! TELEPHONE 2O75 LAS PALMAS DRIVE (619)438-1161. CARLSBAD, CALIFORNIA 92009-4859 - - Office of the City Engineer / (1Iit of (!tar1ba1i TO DEVELOPMENT PROCESSING SERVICES FROM ENGINEERING INSPECTION DIVISION DATE AJv //919ô ROUGH GRADING APPROVAL FOR PROJECT NO t'1 2.43 55 (P .E. or TRACT #) 0 (Projct Name and Address) . /.. . . 7u AL+ ti / 31 e,4i, /1 7 ( 90 79y -' (Developer's Name and A ress 'j -' We have inspected the grading for Lot( 39g0 4tP/d or. Phase of the above mentioned project In addition, we have received rough grading certification from Vi'h4 ;4A -J aE 792-. the Soils Engineer,.. dated 0 1 4 J5 D and from Doi/'i; cg 2-6 /7 r - the Supervision Grading Engineer, dated c1359i7. and are satisfied that the rough grading has been 'completed in accordance with City Standards. - Based on these certifications and our observation, we take no exception to the issuance of a building permit for Lots 53o crd or Phase - of project 2'. 57V . . from a grading . standpoint This release, however, is not intended to certify the project from other"engineering concerns including site development, water or sewer availa- bility, or final grading We will, need to be advised prior to the issuance of a Certificate of Occupancy so that we can verify that final grading and landscaping has been completed in accordance with the approved plans for the project APPROVED: . . . . • • ' , " .. • , • • IL .. •.' •' '- • • Project G ading Inspector ' . - /S r. Constrution Inspector . •