HomeMy WebLinkAboutPE 2.89.66; CASA LOMA CONDOMINIUMS; Engineering ApplicationProject Engineer Initi
Assessors Parcel No.
r -
Application for Grading Permit
-CITY OF CARLSBAD
ENGINEERING. DEPARTMENT
- 2075 Las Palmas Drive
438-3634
1
PE NO.
Validation by Cashier
FOR APPLICANT TO FILL IN FOR DEPARTMENT USE
Site Address . -.... DATE INITIAL
Luciernaga Street, Carlsbad Ca. Secured Agreement Rec'd.
Legal Description Map No. Cash Deposit . Receipt No.
Lots 393,394 . 6905
Project Name -N, Drawing No. Building Permit Plancheck No.
Casa Loma Cbndorniniums .•
Owner . - ' Phone General Permit Requirements: Gregory Kasai (619)276-2113
Owner's Address , 1. All grading and erosion control work shall be done in accordance with
4305 Genser Street San Diego, Ca.92117 City Ordinances,
Plans by Civil Engineer ' Phone 2. Authorized hours of operation: 7:00 am. to Sunset, Monday through
Bradley and Assoc. (619) 744-6777 Friday, excluding city recognized holidays.
Address , Phon6 3. Grading work shall not commence until after the pre-construction
370 Mulberry Dr. Ste.E San Marcos, Ca.92069 conference has been held with the City Inspector
Soil Engineer R.C.E. Phone ' 4. All off-site haul routes require separate approval by the City Engineer
Alfonso D. Neis 28846 (619) 744-6777 -5. A right-of-way permit is required for all work done in the city right-of-
Grading Contractor . - Phone way.
X tIft1AI1 W. 24 Hr. Phone Special Requirements: Address
Party responsible for overall supervision -
?J7 -
Proposed use of grade site
- Residential Condominium.Deièlop.
Number of cubic yards
Cut . Fill • Import Waste
2270 ,1680 590
Proposed Schedule of Start Finish
Operations (dates)
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions'of any permit issued pursuant to
this application.
Signature of Permittee
Owner or authorized agent
ENVIRONMENTAL CLEARANCE - -
Date
EIA Log No.
By
Under City Code Sec. 11.06.170 this grading is:
O Regular Grading - city Inspector will make inspections listed below.
0 Controlled Grading - private grading engineer shall observe work,
coordinate tests and make reports
Inspection Date , f'tpsp. Igitil/1
Initial - Site Prep. ,
Rough - Grade
Final - Slopes Planted
Compaction Reports Read
Private Engr. Cert. Rec'd.
O.K. For Release
Grading permit fee $ Plan check fee $
Permit Issued Copies:
by Date White - Office; Yellow - Inspector; Pink - Permittee
Permit Expiration Date Golden Rod - Finance; Green - Building
- THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE.
S
2075 LAS PALMAS DRIVE.
CARLSBAD CALIFORNI920094859
Office of the City Engineer
S TE LE P H 0 11 E
(6 19) 438-116 1
4h@'/P) eett
(!iii! of (uthhui vi ('
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
DATE: Jcue. jcI(
ROUGH GRADING APPROVAL FOR PROJECT NO.
-
(I E. or TRACT it)
-
: (Project Nameand Address)
tOR T
(DevelopersName and Address) .. .. - 1 .- ... • --: ... •- -' .. -- ,- . •,.; • 1:: ..- ... - --.- - -.. - S --' .- -
We have inspectedthe grading for' f ... '3 4 , or , Phase —
- ( 4 ••
of the above ientionedroject lna'ddWon,:we hav received rough grading •••- . .. -
cci ttficatioj' Soils Erigineet
and from SA k3 1flos c
the Supervision Giading Lncjineet datecI __ and are satisfied
that the tough gi ading lias been completed in- accordance with City Stdnddrds
Based on these certifications and our observation, we take rio QXCeptiOn to the
F issuance of •a building permit for e+ I; ' £- .- or -Phase - of
project i•sA. )j' yA Ac from a grading
standpoint. This release, however, is not intended to certify the project from,
other engineering concerns including site development, water or sewer availa-
bility, or final grading.
Vie will need to be advised prior to the issuance of a Certificate Of Occupancy
so tha t we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project.
APPROVE,
Proj!ct CradiVqfjhispector 7,r. Contructior Inspector