Loading...
HomeMy WebLinkAboutPE 2.89.66; CASA LOMA CONDOMINIUMS; Engineering ApplicationProject Engineer Initi Assessors Parcel No. r - Application for Grading Permit -CITY OF CARLSBAD ENGINEERING. DEPARTMENT - 2075 Las Palmas Drive 438-3634 1 PE NO. Validation by Cashier FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address . -.... DATE INITIAL Luciernaga Street, Carlsbad Ca. Secured Agreement Rec'd. Legal Description Map No. Cash Deposit . Receipt No. Lots 393,394 . 6905 Project Name -N, Drawing No. Building Permit Plancheck No. Casa Loma Cbndorniniums .• Owner . - ' Phone General Permit Requirements: Gregory Kasai (619)276-2113 Owner's Address , 1. All grading and erosion control work shall be done in accordance with 4305 Genser Street San Diego, Ca.92117 City Ordinances, Plans by Civil Engineer ' Phone 2. Authorized hours of operation: 7:00 am. to Sunset, Monday through Bradley and Assoc. (619) 744-6777 Friday, excluding city recognized holidays. Address , Phon6 3. Grading work shall not commence until after the pre-construction 370 Mulberry Dr. Ste.E San Marcos, Ca.92069 conference has been held with the City Inspector Soil Engineer R.C.E. Phone ' 4. All off-site haul routes require separate approval by the City Engineer Alfonso D. Neis 28846 (619) 744-6777 -5. A right-of-way permit is required for all work done in the city right-of- Grading Contractor . - Phone way. X tIft1AI1 W. 24 Hr. Phone Special Requirements: Address Party responsible for overall supervision - ?J7 - Proposed use of grade site - Residential Condominium.Deièlop. Number of cubic yards Cut . Fill • Import Waste 2270 ,1680 590 Proposed Schedule of Start Finish Operations (dates) I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions'of any permit issued pursuant to this application. Signature of Permittee Owner or authorized agent ENVIRONMENTAL CLEARANCE - - Date EIA Log No. By Under City Code Sec. 11.06.170 this grading is: O Regular Grading - city Inspector will make inspections listed below. 0 Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports Inspection Date , f'tpsp. Igitil/1 Initial - Site Prep. , Rough - Grade Final - Slopes Planted Compaction Reports Read Private Engr. Cert. Rec'd. O.K. For Release Grading permit fee $ Plan check fee $ Permit Issued Copies: by Date White - Office; Yellow - Inspector; Pink - Permittee Permit Expiration Date Golden Rod - Finance; Green - Building - THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. S 2075 LAS PALMAS DRIVE. CARLSBAD CALIFORNI920094859 Office of the City Engineer S TE LE P H 0 11 E (6 19) 438-116 1 4h@'/P) eett (!iii! of (uthhui vi (' TO: DEVELOPMENT PROCESSING SERVICES FROM: ENGINEERING INSPECTION DIVISION DATE: Jcue. jcI( ROUGH GRADING APPROVAL FOR PROJECT NO. - (I E. or TRACT it) - : (Project Nameand Address) tOR T (DevelopersName and Address) .. .. - 1 .- ... • --: ... •- -' .. -- ,- . •,.; • 1:: ..- ... - --.- - -.. - S --' .- - We have inspectedthe grading for' f ... '3 4 , or , Phase — - ( 4 •• of the above ientionedroject lna'ddWon,:we hav received rough grading •••- . .. - cci ttficatioj' Soils Erigineet and from SA k3 1flos c the Supervision Giading Lncjineet datecI __ and are satisfied that the tough gi ading lias been completed in- accordance with City Stdnddrds Based on these certifications and our observation, we take rio QXCeptiOn to the F issuance of •a building permit for e+ I; ' £- .- or -Phase - of project i•sA. )j' yA Ac from a grading standpoint. This release, however, is not intended to certify the project from, other engineering concerns including site development, water or sewer availa- bility, or final grading. Vie will need to be advised prior to the issuance of a Certificate Of Occupancy so tha t we can verify that final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVE, Proj!ct CradiVqfjhispector 7,r. Contructior Inspector