Loading...
HomeMy WebLinkAboutPE 2.9.15; WILSON INSUDTRIAL BLDS PARCEL 5; Engineering Applicationpplication for Grading Permiti CITY OF CARLSBAD PUBLIC WORKS & BUILDING DEPARTMENT 1200 Elm Avenue 729-1181 PERMIT NO. 2? /IS--(letter code + number) (lot S=subd iv is ion C=City contract 1 77 °7R**71 rfl FOR APPLICANT TO Fill IN Site Address Surety Bond Bond No. Legal Description Map No. A66 ' 1k Surety Company Subdivision Name Surety Address Owner Phone Date Filed Rec'd by Owner's Address i5135-f&3 Cash deposit Rec'd by Date filed $ Plans by Civil Engineer7 R.C.E. ,Wi4'Jk' 4/ ;t.'e. The following documents are required and shal become a part of the grading permit when they are approved. ?4 Grading plans Specifications ,Soil report Vicinity map Drainage structures ,Retaining wal Is Compact ion report Other Address Phone V22 L614i,( L- Soil Engineer R.C.E. Phone # Grading Contractor Phone Address Check if supervised grading SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT arty onsible for overal I supervision j I. Authorized hours of operation: 7:00 AM to roposed use of grade 5t7 fr4t) a4i1ec_1 5:00 PM, Monday-Friday. Haul routes are to be approved by City Number of cubic yards / Cut Fill Import Waste Engineer. Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per direction I - of Parks & Recreation Director. Total (3-9, o 7- - . - &7W Compacted fills (yes or no) V5 Proposed Schedule of Start Fi ni sh A757 Operations (dates) j.42-1...A2J2 ~]Alv ) I hereby acknowledge that I have read the applica- tion and state that the information I have provide is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation Rough grading / Compaction report rec'd. Planting & drainage Final certification rec'd. Grading permit fee $ 7/2 Work completed Surety bond released Permit Validation by Date /ZZ/7 Permit Expiration Date iz/zz/17 THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED THISPERMITISVALIDFORASIX(6)MONTHPERIOD