HomeMy WebLinkAboutPE 2.9.32; LA COSTA VALLEY UNIT 4 LOTS 187-192; Engineering Application(Application for Grading Permits
CitY OF CARLSBAD
PUBLIC WORKS & BUILDING DEPARTMENT
1200 Elm Avenue
729-1181
PERMIT
(letter code + number)
Llot
SEP 1 9.77 ***96 00
FOR APPi ICANT TO Fill IN
Site Address
Almaden Lane
Surety Bond Bond No.
Legal Description Map No.
Lots 187-188-189-191-192
Surety Company
Subdivision Name
La Costa Valley Unit IV
Surety Address
Owner Phone
Greencastle 714-755-0281
Date Filed Rec'd by
Owner's Address
P.O. Box 1009 Del Mar, Ca. 92014
Cash deposit Rectd by Date filed
$
Plans by Civil Engineer R.C.E.
Duca & McCoy 24668
The following documents are required and shall
become a part of the grading permit when they
are approved.
Grading plans Specifications
Soil report Vicinity map
_Drainage structures Retaining walls
_Compaction report _Other
Address Phone 675-4488
336 Poinsettia Ave. Coi'ona del Mar, Ca
Soil Engineer R.C.E. Phone
Benton Engineering 10332 565-1955
Grading Contractor Phone
Owner 714-755-0281
Address Check if supervised
P.O. Box 1009, Del Mar grading
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Party responsible for overall supervision
Mike O'Hara I. Authorized hoUrs of operation: 7:00 AM to
roposed use of grade site
Rsidential
5:00 PM, Monday-Friday.
Haul routes are to be approved by City
lumber of cubic yards
Cut 320fiI1260 Import Waste 0
Engineer.
Adequate provisions shall be made for
erosion and siltation control.
All slopes shall be planted per direction
--
I I
I I of Parks & Recreation Director. Total
Compacted fi I Is (yes or no)
Yes
Proposed Schedule of Start Finish
Operations (dates) Upon approval
I hereby acknowledge that I have read the applica-
tion and state that the information I have provided
is correct and agree to comply with all City
ordinances and State laws regulating excavating and
grading, and the provisions and conditions of any
permit issued pursuant to this application.
Signature of Permitt
Owner or authorized
- INSPECTION DATE INSPECTOR'S
SIGNATURE
Ground preparation
Rough grading
Compaction report rec'd.
Planting & drainage
Final certification rec'd.
Grading permit fee 96.00 Surety bond released
Work completed
Permit V I ipn
&(i1 Date / 9SPZ
Permit Expiration Date /9,4f,9iP7 ig
THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD